Fort Belvoir SATOC Roofing IDIQ-W5168W-25-R-A005 W5168W25RA005
Summary
AI-generated · Aug 24, 2025Roofing work at Fort Belvoir requires furnishing all labor, equipment, and materials to remove, install, repair, seal, and/or replace roofs on buildings as needed, including incidental work in accordance with the Statement of Work; outcomes must be a complete, functional, and suitable roof system.
Five records present identical scope; no changes or new information are shown between notices.
This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealingand or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
From Solicitation posted on Jul 15, 2025This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealingand or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
From Solicitation posted on Aug 11, 2025This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
From Solicitation posted on Aug 13, 2025This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
From Solicitation posted on Aug 18, 2025This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
From Solicitation posted on Aug 22, 2025This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
From Solicitation posted on Sep 08, 2025This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system. ________________________________________________________________________ Update as of 15 SEP 2025: At this time, the solicitation for this requirement has been posted. The closing date for this solicitation is 25 SEP 2025. ________________________________________________________________________ Update as of AUG 2025: At this time, the solicitation for this requirement has been posted. The Government continues to work through answering questions posed by industry. Please continue to monitor Sam.gov for updates.
From Solicitation posted on Sep 15, 2025This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
From Solicitation posted on Sep 24, 2025This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system. ____________________________________________________ Update as of 2 DEC 2025: The Government is reviewing proposals. Please continue to monitor Sam.gov for further updates. ____________________________________________________ Update as of 15 SEP 2025: At this time, the solicitation for this requirement has been posted. The closing date for this solicitation is 25 SEP 2025. ____________________________________________________ Update as of AUG 2025: At this time, the solicitation for this requirement has been posted. The Government continues to work through answering questions posed by industry. Please continue to monitor Sam.gov for updates. _________________________________________________ Update as of 10 JUL 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. __________________________________________________ Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. ___________________________________________________ Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming ____________________________________________________ Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. _____________________________________________________ Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. _____________________________________________________ Update as of 26 NOV 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. _____________________________________________________ Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting. __________________________________________________ Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. ____________________________________________________ As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion. The official solicitation is forthcoming.
From Solicitation posted on Dec 02, 2025This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system. __________________________________________________ Update as of 22 JAN 2026: The Source Selection Evaluation Board is in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________ Update as of 2 DEC 2025: The Government is reviewing proposals. Please continue to monitor Sam.gov for further updates. ____________________________________________________ Update as of 15 SEP 2025: At this time, the solicitation for this requirement has been posted. The closing date for this solicitation is 25 SEP 2025. ____________________________________________________ Update as of AUG 2025: At this time, the solicitation for this requirement has been posted. The Government continues to work through answering questions posed by industry. Please continue to monitor Sam.gov for updates. _________________________________________________ Update as of 10 JUL 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. __________________________________________________ Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. ___________________________________________________ Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming ____________________________________________________ Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. _____________________________________________________ Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. _____________________________________________________ Update as of 26 NOV 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. _____________________________________________________ Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting. __________________________________________________ Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. ____________________________________________________ As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion. The official solicitation is forthcoming.
From Solicitation posted on Jan 22, 2026This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system. __________________________________________________ Update as of 26 FEB 2026: The Source Selection Evaluation Board is in progress. Please continue to monitor Sam.gov for further updates. __________________________________________________ Update as of 22 JAN 2026: The Source Selection Evaluation Board is in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________ Update as of 2 DEC 2025: The Government is reviewing proposals. Please continue to monitor Sam.gov for further updates. ____________________________________________________ Update as of 15 SEP 2025: At this time, the solicitation for this requirement has been posted. The closing date for this solicitation is 25 SEP 2025. ____________________________________________________ Update as of AUG 2025: At this time, the solicitation for this requirement has been posted. The Government continues to work through answering questions posed by industry. Please continue to monitor Sam.gov for updates. _________________________________________________ Update as of 10 JUL 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. __________________________________________________ Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. ___________________________________________________ Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming ____________________________________________________ Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. _____________________________________________________ Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. _____________________________________________________ Update as of 26 NOV 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. _____________________________________________________ Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting. __________________________________________________ Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. ____________________________________________________ As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion. The official solicitation is forthcoming.
From Solicitation posted on Feb 26, 2026This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
From Award Notice posted on Mar 20, 2026Notice history
12-
-
Solicitation Posted Aug 11, 2025View changes (2)
- Response Deadline: Aug 15, 2025 → Aug 27, 2025
- Set-Aside: None → 8a Competed
-
Solicitation Posted Aug 18, 2025No changes from previous notice
-
Solicitation Posted Sep 24, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Sep 25, 2025 → Sep 30, 2025
-
Award Notice LATEST Posted Mar 20, 2026
Details
Award Information
Award Notices
Posted: Mar 20, 2026
This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| PUYENPA CONSTRUCTION, LLC | DGCQQJQCN4X8 | 8EUM5 | Duckwater, NV |
Contacts
Agency
Place of Performance
22060