Contacts, documents and full notice history are available with a subscription.
Award Notice 12 notices

Fort Belvoir SATOC Roofing IDIQ-W5168W-25-R-A005 W5168W25RA005

Solicitation W5168W25RA005 Copied Notice ID 3fc0128f9eb54252920d5d50b44fbded Copied DEPT OF DEFENSE — W6QM MICC-FDO FT SAM HOUSTON
SAM.gov
Posted
Jul 15, 2025
Deadline
Aug 15, 2025
Set-aside
None
NAICS
238160
PSC
Z2JZ

Summary

AI-generated · Aug 24, 2025

Roofing work at Fort Belvoir requires furnishing all labor, equipment, and materials to remove, install, repair, seal, and/or replace roofs on buildings as needed, including incidental work in accordance with the Statement of Work; outcomes must be a complete, functional, and suitable roof system.

Five records present identical scope; no changes or new information are shown between notices.

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealingand or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

From Solicitation posted on Jul 15, 2025

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealingand or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

From Solicitation posted on Aug 11, 2025

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

From Solicitation posted on Aug 13, 2025

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

From Solicitation posted on Aug 18, 2025

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

From Solicitation posted on Aug 22, 2025

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

From Solicitation posted on Sep 08, 2025

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system. ________________________________________________________________________ Update as of 15 SEP 2025: At this time, the solicitation for this requirement has been posted. The closing date for this solicitation is 25 SEP 2025. ________________________________________________________________________ Update as of AUG 2025: At this time, the solicitation for this requirement has been posted. The Government continues to work through answering questions posed by industry. Please continue to monitor Sam.gov for updates.

From Solicitation posted on Sep 15, 2025

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

From Solicitation posted on Sep 24, 2025

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system. ____________________________________________________ Update as of 2 DEC 2025: The Government is reviewing proposals. Please continue to monitor Sam.gov for further updates. ____________________________________________________ Update as of 15 SEP 2025: At this time, the solicitation for this requirement has been posted. The closing date for this solicitation is 25 SEP 2025. ____________________________________________________ Update as of AUG 2025: At this time, the solicitation for this requirement has been posted. The Government continues to work through answering questions posed by industry. Please continue to monitor Sam.gov for updates. _________________________________________________ Update as of 10 JUL 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. __________________________________________________ Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. ___________________________________________________ Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming ____________________________________________________ Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. _____________________________________________________ Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. _____________________________________________________ Update as of 26 NOV 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. _____________________________________________________ Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting. __________________________________________________ Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. ____________________________________________________ As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion. The official solicitation is forthcoming.

From Solicitation posted on Dec 02, 2025

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system. __________________________________________________ Update as of 22 JAN 2026: The Source Selection Evaluation Board is in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________ Update as of 2 DEC 2025: The Government is reviewing proposals. Please continue to monitor Sam.gov for further updates. ____________________________________________________ Update as of 15 SEP 2025: At this time, the solicitation for this requirement has been posted. The closing date for this solicitation is 25 SEP 2025. ____________________________________________________ Update as of AUG 2025: At this time, the solicitation for this requirement has been posted. The Government continues to work through answering questions posed by industry. Please continue to monitor Sam.gov for updates. _________________________________________________ Update as of 10 JUL 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. __________________________________________________ Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. ___________________________________________________ Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming ____________________________________________________ Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. _____________________________________________________ Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. _____________________________________________________ Update as of 26 NOV 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. _____________________________________________________ Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting. __________________________________________________ Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. ____________________________________________________ As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion. The official solicitation is forthcoming.

From Solicitation posted on Jan 22, 2026

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system. __________________________________________________ Update as of 26 FEB 2026: The Source Selection Evaluation Board is in progress. Please continue to monitor Sam.gov for further updates. __________________________________________________ Update as of 22 JAN 2026: The Source Selection Evaluation Board is in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________ Update as of 2 DEC 2025: The Government is reviewing proposals. Please continue to monitor Sam.gov for further updates. ____________________________________________________ Update as of 15 SEP 2025: At this time, the solicitation for this requirement has been posted. The closing date for this solicitation is 25 SEP 2025. ____________________________________________________ Update as of AUG 2025: At this time, the solicitation for this requirement has been posted. The Government continues to work through answering questions posed by industry. Please continue to monitor Sam.gov for updates. _________________________________________________ Update as of 10 JUL 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. __________________________________________________ Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. ___________________________________________________ Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming ____________________________________________________ Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. _____________________________________________________ Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. _____________________________________________________ Update as of 26 NOV 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates. _____________________________________________________ Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting. __________________________________________________ Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. ____________________________________________________ As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion. The official solicitation is forthcoming.

From Solicitation posted on Feb 26, 2026

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

From Award Notice posted on Mar 20, 2026

Notice history

12
  1. Solicitation Posted Jul 15, 2025
  2. Solicitation Posted Aug 11, 2025
    • Response Deadline: Aug 15, 2025Aug 27, 2025
    • Set-Aside: None8a Competed
  3. Solicitation Posted Aug 13, 2025
    • Description: Description was updated
  4. Solicitation Posted Aug 18, 2025
    No changes from previous notice
  5. Solicitation Posted Aug 22, 2025
    • Response Deadline: Aug 27, 2025Sep 10, 2025
  6. Solicitation Posted Sep 08, 2025
    • Response Deadline: Sep 10, 2025Sep 25, 2025
  7. Solicitation Posted Sep 15, 2025
    • Description: Description was updated
  8. Solicitation Posted Sep 24, 2025
    • Description: Description was updated
    • Response Deadline: Sep 25, 2025Sep 30, 2025
  9. Solicitation Posted Dec 02, 2025
    • Description: Description was updated
  10. Solicitation Posted Jan 22, 2026
    • Description: Description was updated
  11. Solicitation Posted Feb 26, 2026
    • Description: Description was updated
  12. Award Notice LATEST Posted Mar 20, 2026

Details

Solicitation number W5168W25RA005
Notice ID 3fc0128f9eb54252920d5d50b44fbded
Award number W5168W-26-D-A014
Notice type Solicitation
Product / Service (PSC) Z2JZ
NAICS 238160
Archive date Oct 15, 2025

Award Information

Awardee
1
Total Awarded
$23,162,677.00
Award Date
Mar 19, 2026

Award Notices

Fort Belvoir SATOC Roofing IDIQ-W5168W-25-R-A005 View Notice

Posted: Mar 20, 2026

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement...

Awardees

Company Name UEI CAGE Code Location
PUYENPA CONSTRUCTION, LLC DGCQQJQCN4X8 8EUM5 Duckwater, NV

Documents

No files available

View on SAM.gov

Contacts

primary
Melanie Palmas

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
W6QM MICC-FDO FT SAM HOUSTON

Place of Performance

USAG FT BELVOIR9925 TRACY LOOP, BLDG 767FORT BELVOIR, VA 22060-5097UNITED STATES

Dates

Posted Jul 15, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Aug 15, 2025 11 months ago