Contacts, documents and full notice history are available with a subscription.
Award Notice 5 notices

56--NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ 140F0S26Q0004

Solicitation 140F0S26Q0004 Copied Notice ID dbefb4265cbd4fc184dd582dc8d02c0a Copied INTERIOR, DEPARTMENT OF THE — FWS, OVER SAT G/S
SAM.gov
Posted
Mar 02, 2026
Deadline
No deadline
Set-aside
None
NAICS
212312
PSC
5610

Summary

AI-generated · Dec 17, 2025

Approximately 16,000 tons of NV DOT Type 2 Class B base course are being sought for the Stillwater National Wildlife Refuge Complex in Fallon, NV. This is a market-sounds-for-capability (sources sought) request to identify vendors capable of supplying the specified base course or providing transportation/logistics support.

Respondents should provide their CAGE Code, Unique Entity ID, and a confirmation that they can supply NV DOT Type 2 Class B base course and/or operate as a transportation/logistics firm. Include the reference "140F0S26Q0004 - Sources Sought for Stillwater NWR, NV" in the subject line of your email.

This is a sources sought for approx. 16,000 tons of Type 2 Class B base course for Stillwater National Wildlife Refuge (NWR) Complex, 3175 Freeman Lane, Fallon, NV 89406. See attached SOW Interested vendors please respond back with: 1. CAGE Code 2. Unique Entity ID 3. Confirmation that you are a provider of NV DOT Type 2 Class B base course and/or a transportation/logistics firm. Please identify "140F0S26Q0004 - Sources Sought for Stillwater NWR, NV" in the subject line of your email to Robert_Sung@fws.gov

From Sources Sought posted on Dec 16, 2025

NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ Type 2 Class B base course with Tailgate spread for Fallon NV. See SOW in solicitation packet for specifications. Provide a statement that you understand the standard for Type 2 Class B base course as defined in the SOW and include your CAGE code in your submission. Email Robert_Sung@fws.gov for questions and your quotes.

From Solicitation posted on Feb 13, 2026

NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ Type 2 Class B base course with Tailgate spread for Fallon NV. See SOW in solicitation packet for specifications. Provide a statement that you understand the standard for Type 2 Class B base course as defined in the SOW and include your CAGE code in your submission. Email Robert_Sung@fws.gov for questions and your quotes. RFI Q&A response Q1: After reviewing this requirement with our subcontractor, we received the following clarification from them: "If the trucks ran consecutively, they could all dump in sequence, allowing the refuge staff time to work the material before the trucks returned for their second and third trips. The total daily tonnage can be adjusted to suit your needs by increasing or decreasing the number of trucks. We anticipate approximately 800-1,000 tons per shift. The material would be delivered using belly dump trains, leaving a window for the refuge staff to spread. We would revise the proposal to include minimum truck spacing. However, doing so would limit roughly half the trucks to only two loads per day, increasing the cost per ton. Based on this scenario and eight trucks per day, spacing would be approximately 15-30 minutes between loads, followed by about 1.25 hours of downtime between the last truck in the first rotation and the first truck returning for the second rotation. This would result in approximately 800 tons per shift." Based on this, strict adherence to the minimum 15-minute spacing requirement would materially affect operational efficiency and increase the cost per ton. We would respectfully like to inquire whether there is any flexibility in the delivery spacing requirement. Specifically: A. Would consecutive dumping be acceptable if coordinated safely and efficiently with the grading contractor? B. Is the 15-minute minimum interval mandatory throughout the entire shift, or could it be adjusted during certain delivery windows? C. Would alternative staging or sequencing methods be considered, provided safety and site control are maintained? A1: The refuge does have some flexibility on the spacing of the trucks and could be coordinated at that time with the project coordinator. During the work day - we will have a refuge staff member who is stationed to take the tickets from drivers and direct them when it is safe to unload. However, we have completed similar projects at least three times in the past 5 years with various contractors. A 15-minute interval between trucks was generally what they averaged between trucks just based on how long it took the for each load to be filled between the first and the next truck at the gravel pit. Across the projects, delivery has averaged between 800-1k tons per day. For the specific questions: A. Yes, consecutive dumping can be coordinated with the refuge staff who will be completing the gravel grading. B. The 15 minute interval would not be mandatory and could vary throughout the shift, but would need to be coordinated with staff on site. C. Alternative staging or sequencing methods could be considered, provided safety and site control are maintained. The contractor would be responsible for coordinating with the project manager on site and ultimately would be responsible for ensuring the gravel is delivered to its final location on the delivery route.

From Solicitation posted on Feb 17, 2026

NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ Type 2 Class B base course with Tailgate spread for Fallon NV. See SOW in solicitation packet for specifications. Provide a statement that you understand the standard for Type 2 Class B base course as defined in the SOW and include your CAGE code in your submission. **AMENDMENT 2, Update** The Government has $560,042.96. The vendor is requested to update their quotes to provide the quantity of stone that can be provided for this amount. ********** Email Robert_Sung@fws.gov for questions and your quotes. RFI Q&A response Q1: After reviewing this requirement with our subcontractor, we received the following clarification from them: "If the trucks ran consecutively, they could all dump in sequence, allowing the refuge staff time to work the material before the trucks returned for their second and third trips. The total daily tonnage can be adjusted to suit your needs by increasing or decreasing the number of trucks. We anticipate approximately 800-1,000 tons per shift. The material would be delivered using belly dump trains, leaving a window for the refuge staff to spread. We would revise the proposal to include minimum truck spacing. However, doing so would limit roughly half the trucks to only two loads per day, increasing the cost per ton. Based on this scenario and eight trucks per day, spacing would be approximately 15-30 minutes between loads, followed by about 1.25 hours of downtime between the last truck in the first rotation and the first truck returning for the second rotation. This would result in approximately 800 tons per shift." Based on this, strict adherence to the minimum 15-minute spacing requirement would materially affect operational efficiency and increase the cost per ton. We would respectfully like to inquire whether there is any flexibility in the delivery spacing requirement. Specifically: A. Would consecutive dumping be acceptable if coordinated safely and efficiently with the grading contractor? B. Is the 15-minute minimum interval mandatory throughout the entire shift, or could it be adjusted during certain delivery windows? C. Would alternative staging or sequencing methods be considered, provided safety and site control are maintained? A1: The refuge does have some flexibility on the spacing of the trucks and could be coordinated at that time with the project coordinator. During the work day - we will have a refuge staff member who is stationed to take the tickets from drivers and direct them when it is safe to unload. However, we have completed similar projects at least three times in the past 5 years with various contractors. A 15-minute interval between trucks was generally what they averaged between trucks just based on how long it took the for each load to be filled between the first and the next truck at the gravel pit. Across the projects, delivery has averaged between 800-1k tons per day. For the specific questions: A. Yes, consecutive dumping can be coordinated with the refuge staff who will be completing the gravel grading. B. The 15 minute interval would not be mandatory and could vary throughout the shift, but would need to be coordinated with staff on site. C. Alternative staging or sequencing methods could be considered, provided safety and site control are maintained. The contractor would be responsible for coordinating with the project manager on site and ultimately would be responsible for ensuring the gravel is delivered to its final location on the delivery route.

From Solicitation posted on Feb 23, 2026

NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ

From Award Notice posted on Mar 02, 2026

Notice history

5
  1. Sources Sought Posted Dec 16, 2025 View
  2. Solicitation Posted Feb 13, 2026
    • Title: 56--Sources Sought, Gravel, Fallon NVNV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ
    • Description: Description was updated
    • Notice Type: Sources SoughtSolicitation
    • Response Deadline: Dec 30, 2025Feb 19, 2026
    • Set-Aside: NoneTotal Small Business Set-Aside (FAR 19.5)
  3. Solicitation Posted Feb 17, 2026
    • Title: NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ56--NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ
    • Description: Description was updated
  4. Solicitation Posted Feb 23, 2026
    • Description: Description was updated
    • Response Deadline: Feb 19, 2026Feb 25, 2026
  5. Award Notice LATEST Posted Mar 02, 2026

Details

Solicitation number 140F0S26Q0004
Notice ID dbefb4265cbd4fc184dd582dc8d02c0a
Award number 140F0S26P0008
Notice type Award Notice
Product / Service (PSC) 5610
NAICS 212312
Archive date Mar 17, 2026

Award Information

Awardee
1
Total Awarded
$560,042.96
Award Date
Mar 02, 2026

Award Notices

56--NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ View Notice

Posted: Mar 02, 2026

NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ

Awardees

Company Name UEI CAGE Code Location
GIVING TREE CAPITAL, LLC WEMGZRAJV8F9 9MHQ0 Coral Springs, FL

Documents

No files available

View on SAM.gov

Contacts

primary
Sung, Robert

Email

Phone

Agency

INTERIOR, DEPARTMENT OF THE
US FISH AND WILDLIFE SERVICE
FWS, OVER SAT G/S

Place of Performance

Dates

Posted Mar 02, 2026 5 months ago
Last Updated Aug 06, 2026 2 days ago
Awarded Mar 02, 2026 5 months ago