56--Sources Sought, Gravel, Fallon NV 140F0S26Q0004
Summary
AI-generated · Dec 17, 2025Approximately 16,000 tons of NV DOT Type 2 Class B base course are being sought for the Stillwater National Wildlife Refuge Complex in Fallon, NV. This is a market-sounds-for-capability (sources sought) request to identify vendors capable of supplying the specified base course or providing transportation/logistics support.
Respondents should provide their CAGE Code, Unique Entity ID, and a confirmation that they can supply NV DOT Type 2 Class B base course and/or operate as a transportation/logistics firm. Include the reference "140F0S26Q0004 - Sources Sought for Stillwater NWR, NV" in the subject line of your email.
This is a sources sought for approx. 16,000 tons of Type 2 Class B base course for Stillwater National Wildlife Refuge (NWR) Complex, 3175 Freeman Lane, Fallon, NV 89406. See attached SOW Interested vendors please respond back with: 1. CAGE Code 2. Unique Entity ID 3. Confirmation that you are a provider of NV DOT Type 2 Class B base course and/or a transportation/logistics firm. Please identify "140F0S26Q0004 - Sources Sought for Stillwater NWR, NV" in the subject line of your email to Robert_Sung@fws.gov
From Sources Sought posted on Dec 16, 2025NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ Type 2 Class B base course with Tailgate spread for Fallon NV. See SOW in solicitation packet for specifications. Provide a statement that you understand the standard for Type 2 Class B base course as defined in the SOW and include your CAGE code in your submission. Email Robert_Sung@fws.gov for questions and your quotes.
From Solicitation posted on Feb 13, 2026NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ Type 2 Class B base course with Tailgate spread for Fallon NV. See SOW in solicitation packet for specifications. Provide a statement that you understand the standard for Type 2 Class B base course as defined in the SOW and include your CAGE code in your submission. Email Robert_Sung@fws.gov for questions and your quotes. RFI Q&A response Q1: After reviewing this requirement with our subcontractor, we received the following clarification from them: "If the trucks ran consecutively, they could all dump in sequence, allowing the refuge staff time to work the material before the trucks returned for their second and third trips. The total daily tonnage can be adjusted to suit your needs by increasing or decreasing the number of trucks. We anticipate approximately 800-1,000 tons per shift. The material would be delivered using belly dump trains, leaving a window for the refuge staff to spread. We would revise the proposal to include minimum truck spacing. However, doing so would limit roughly half the trucks to only two loads per day, increasing the cost per ton. Based on this scenario and eight trucks per day, spacing would be approximately 15-30 minutes between loads, followed by about 1.25 hours of downtime between the last truck in the first rotation and the first truck returning for the second rotation. This would result in approximately 800 tons per shift." Based on this, strict adherence to the minimum 15-minute spacing requirement would materially affect operational efficiency and increase the cost per ton. We would respectfully like to inquire whether there is any flexibility in the delivery spacing requirement. Specifically: A. Would consecutive dumping be acceptable if coordinated safely and efficiently with the grading contractor? B. Is the 15-minute minimum interval mandatory throughout the entire shift, or could it be adjusted during certain delivery windows? C. Would alternative staging or sequencing methods be considered, provided safety and site control are maintained? A1: The refuge does have some flexibility on the spacing of the trucks and could be coordinated at that time with the project coordinator. During the work day - we will have a refuge staff member who is stationed to take the tickets from drivers and direct them when it is safe to unload. However, we have completed similar projects at least three times in the past 5 years with various contractors. A 15-minute interval between trucks was generally what they averaged between trucks just based on how long it took the for each load to be filled between the first and the next truck at the gravel pit. Across the projects, delivery has averaged between 800-1k tons per day. For the specific questions: A. Yes, consecutive dumping can be coordinated with the refuge staff who will be completing the gravel grading. B. The 15 minute interval would not be mandatory and could vary throughout the shift, but would need to be coordinated with staff on site. C. Alternative staging or sequencing methods could be considered, provided safety and site control are maintained. The contractor would be responsible for coordinating with the project manager on site and ultimately would be responsible for ensuring the gravel is delivered to its final location on the delivery route.
From Solicitation posted on Feb 17, 2026NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ Type 2 Class B base course with Tailgate spread for Fallon NV. See SOW in solicitation packet for specifications. Provide a statement that you understand the standard for Type 2 Class B base course as defined in the SOW and include your CAGE code in your submission. **AMENDMENT 2, Update** The Government has $560,042.96. The vendor is requested to update their quotes to provide the quantity of stone that can be provided for this amount. ********** Email Robert_Sung@fws.gov for questions and your quotes. RFI Q&A response Q1: After reviewing this requirement with our subcontractor, we received the following clarification from them: "If the trucks ran consecutively, they could all dump in sequence, allowing the refuge staff time to work the material before the trucks returned for their second and third trips. The total daily tonnage can be adjusted to suit your needs by increasing or decreasing the number of trucks. We anticipate approximately 800-1,000 tons per shift. The material would be delivered using belly dump trains, leaving a window for the refuge staff to spread. We would revise the proposal to include minimum truck spacing. However, doing so would limit roughly half the trucks to only two loads per day, increasing the cost per ton. Based on this scenario and eight trucks per day, spacing would be approximately 15-30 minutes between loads, followed by about 1.25 hours of downtime between the last truck in the first rotation and the first truck returning for the second rotation. This would result in approximately 800 tons per shift." Based on this, strict adherence to the minimum 15-minute spacing requirement would materially affect operational efficiency and increase the cost per ton. We would respectfully like to inquire whether there is any flexibility in the delivery spacing requirement. Specifically: A. Would consecutive dumping be acceptable if coordinated safely and efficiently with the grading contractor? B. Is the 15-minute minimum interval mandatory throughout the entire shift, or could it be adjusted during certain delivery windows? C. Would alternative staging or sequencing methods be considered, provided safety and site control are maintained? A1: The refuge does have some flexibility on the spacing of the trucks and could be coordinated at that time with the project coordinator. During the work day - we will have a refuge staff member who is stationed to take the tickets from drivers and direct them when it is safe to unload. However, we have completed similar projects at least three times in the past 5 years with various contractors. A 15-minute interval between trucks was generally what they averaged between trucks just based on how long it took the for each load to be filled between the first and the next truck at the gravel pit. Across the projects, delivery has averaged between 800-1k tons per day. For the specific questions: A. Yes, consecutive dumping can be coordinated with the refuge staff who will be completing the gravel grading. B. The 15 minute interval would not be mandatory and could vary throughout the shift, but would need to be coordinated with staff on site. C. Alternative staging or sequencing methods could be considered, provided safety and site control are maintained. The contractor would be responsible for coordinating with the project manager on site and ultimately would be responsible for ensuring the gravel is delivered to its final location on the delivery route.
From Solicitation posted on Feb 23, 2026NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ
From Award Notice posted on Mar 02, 2026Notice history
5-
Sources Sought Posted Dec 16, 2025
-
Solicitation Posted Feb 13, 2026View changes (5)
- Title: 56--Sources Sought, Gravel, Fallon NV → NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ
- Description: Description was updated
- Notice Type: Sources Sought → Solicitation
- Response Deadline: Dec 30, 2025 → Feb 19, 2026
- Set-Aside: None → Total Small Business Set-Aside (FAR 19.5)
-
Solicitation Posted Feb 17, 2026View changes (2)
- Title: NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ → 56--NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ
- Description: Description was updated
-
Solicitation Posted Feb 23, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Feb 19, 2026 → Feb 25, 2026
-
Award Notice LATEST Posted Mar 02, 2026
Details
Award Information
Award Notices
Posted: Mar 02, 2026
NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| GIVING TREE CAPITAL, LLC | WEMGZRAJV8F9 | 9MHQ0 | Coral Springs, FL |
Contacts