Z1NE--Water Tank Cleaning and Inspection 36C24125Q0576
Summary
AI-generated · Aug 24, 2025Provide water tank cleaning and internal inspection services for a campus in Leeds, MA, with two line items: 12-month tank inspection and 1-year tank cleaning. Work includes cleaning and sanitizing the tank, performing internal inspections in line with MA DEP guidance (3–5 year scope), and delivering a MA-regulations–compliant inspection report before invoicing. The government will empty the tank to the allowed level and remove sediment; refilling will be from the municipal supply, and the contractor is responsible for all means and methods to remove sediment, along with any off-site disposal of non-hazardous sediment. A site visit is required (coordinated with the program office and a sign-in/out), and the job may involve confined-space work; divers may be considered for sediment removal, but this adds OSHA risk and requires thorough planning and safety measures by the contractor.
Key updates since prior notices include changing the section label from Performance Work Statement to Statement of Work for the CLINs, addition of a wage determination for Leeds, and clarified bid-process details such as site visits and potential extensions. The Q&A clarifies responsibilities for emptying, refilling, and disposal; confirms MA regulatory compliance is the contractor’s responsibility and that a MA-regulation–compliant final report is required before invoicing. It is identified as a new contract (no incumbent information) and references a 2021 reference report; the award has not been publicly stated in the provided data.
Description This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2025-04; May 12, 2025. This solicitation is set-aside for: VOSB The associated North American Industrial Classification System (NAICS) code for this procurement is 221310, with a small business size standard of $41 Million. The FSC/PSC is Z1NE; Water Supply and Irrigation Systems. The Edward P. Boland Campus, 421 N Main St Leeds, MA 01053 is seeking to acquire Water Tank Cleaning and Inspection services. All interested companies shall provide quotations for the following: Supplies/Services Line Item Description Quantity Unit of Measure Unit Price Total Price 0001 Water Tank Inspection 12 MO 0002 Water Tank Cleaning 1 YR
From Combined Synopsis/Solicitation posted on Jul 02, 202536C24125Q0576 - Water Tank Cleaning Inspection - Leeds MA Q&A For cleaning, is the tank being emptied? If so, who is emptying it? Who is refilling and performing any chlorination/disinfecting? VA shall empty to the level the drain permits, silt, sediment or residual water shall be contractor responsibility to remove. Refilling shall be via municipal supply. Vendor shall be responsible for ensuring tank is cleaned and sanitized PRIOR to filling. VA does not treat or hold water operator licensing to do so. Instead of emptying the tank would the use of divers to remove the sediment and perform an internal inspection be acceptable? Contractor is responsible for means and methods to remove ALL. Please note divers in a confined space may have significant OSHA risk and planning including rescue plans and standby teams etc. Planning is contractor responsibility, the VA is responsible for confirming the plan. Does the removed sediment need to be disposed of off-site? This would be non-hazardous and typically we are able to dispose to a wooded area on-site. Physically there are permissible locations on VA property (approx. 100 acres). Legalities with regard to Mass DEP or other regulatory bodies cited within the PWS are contractor responsibilities. For the 12 monthly inspections I am assuming they shall meet the ground level exterior inspections as defined in MA DEP CH8. Section 8.1.22 (2)? Monthly inspections are not within the scope. These are performed internally. Contract is for cleaning and the (3-5 year) INTERNAL and more extensive inspections required by MA DEP. Is an inspection report required and are there past inspection reports or drawings/photos available? The most recent (3-5 year report from 2021) is attached to the solicitation which includes photos and existing conditions of the time. A similar report compliant with MA regulations is required upon completion of work and PRIOR to invoicing. How long to perform the first round 2025-2026 inspection and cleaning? This is acceptable to the station. Note all questions and clarifications can only be answered by contracting officer submitted in writing for all bidders to received consistent clarifications. Award shall be no later than September of 2025 and the cleaning and inspection is expected before November 11, 2025. Is a site visit possible - publicly accessible? Site Visit must be coordinated with program office and a sign in/out sheet must be completed. Details are included within the revised Solicitation attached. Can the bid due date be extended one week to give a little more time for review and visit? Solicitation will be resolicited for one week. wage determination rules (aka prevailing wage). Wage Determination for Leeds MA is now added to the Solicitation We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services. New. To the best of our knowledge only the one provided 2021 inspection and minor repair has been completed since the 2011 installation.
From Combined Synopsis/Solicitation posted on Jul 24, 2025The following sections have been Amended within the Combined Synopsis: CLINs Performance Work Statement is now the Statement of Work
From Combined Synopsis/Solicitation posted on Aug 22, 2025The following sections have been Amended within the Combined Synopsis: CLINs Performance Work Statement is now the Statement of Work
From Combined Synopsis/Solicitation posted on Oct 07, 2025Notice history
5-
-
Combined Synopsis/Solicitation Posted Jul 24, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Jul 14, 2025 → Aug 04, 2025
-
Combined Synopsis/Solicitation Posted Aug 22, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 04, 2025 → Aug 29, 2025
-
Combined Synopsis/Solicitation Posted Oct 07, 2025No changes from previous notice
-
Award Notice LATEST Posted Oct 07, 2025
Details
Award Information
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| MASS TANK INSPECTION SERVICES LLC | VYAMHABZC7Q9 | 6VHW7 | MIDDLEBORO |
Contacts
Contract Specialist
Phone