Summary

AI-generated · Aug 28, 2025

Install a permanent pumping system between Pond 20 and the Sturgeon Building at Neosho NFH, including design and installation of a 4-inch waterline to carry water from Pond 20 to the existing rearing building, and design and installation of electrical service for a 2 HP, 3-phase submersible pump with connections to the existing service panel and a new pump controller for variable-speed control. All other requirements are per the Scope of Work.

A mandatory site visit will be conducted to assess conditions. The project is estimated to be in the $25,000 to $100,000 range, with the notice specifying deadlines for questions and quotes.

Installation of a permanent pumping system between Pond 20 and the Sturgeon Building at Neosho NFH. Waterline Installation: Design and install a 4" waterline to transport water from Pond 20 to the existing rearing building. Electrical Connections: Design and install electrical service for a 2 HP, 3-phase submersible pump, including connections to the existing service panel and installation of a new pump controller for variable speed control. And all other requirements as outlined in the Scope of Work. Site Visit: Thursday, September 4, 2025, @ 10:00 AM CST. POC: Nathan Eckert, (417)592-7400, or nathan_eckert@fws.gov Questions Due: Friday, September 5, 2025 @ 3:00 PM EST to Bill Koski, william_koski@fws.gov Quotes Due: Thursday, September 11, 2025 @ 3:00 PM EST to Bill Koski, william_koski@fws.gov The Magnitude of this project is between $25,000.00 and $100,000.00.

From Solicitation posted on Aug 27, 2025

Installation of a permanent pumping system between Pond 20 and the Sturgeon Building at Neosho NFH.

From Award Notice posted on Sep 24, 2025

Notice history

2
  1. Solicitation Posted Aug 27, 2025 View
  2. Award Notice LATEST Posted Sep 24, 2025

Details

Solicitation number 140FC225Q0054
Notice ID 5f79007a45c648b39cb976c08c3724bf
Award number 140FC225P0086
Notice type Award Notice
Product / Service (PSC) Z2NZ
NAICS 237110
Archive date Oct 09, 2025

Award Information

Awardee
1
Total Awarded
$31,874.00
Award Date
Sep 24, 2025

Award Notices

Z--MO NEOSHO NFH POND 20 PUMP STATION View Notice

Posted: Sep 24, 2025

Installation of a permanent pumping system between Pond 20 and the Sturgeon Building at Neosho NFH.

Awardees

Company Name UEI CAGE Code Location
HAGGARDS EXCAVATING LLC GPKNGGLBE9K3 1V0W3 Neosho, MO

Documents

No files available

View on SAM.gov

Contacts

primary
Williams, Rachel

Email

Phone

660856

Agency

INTERIOR, DEPARTMENT OF THE
US FISH AND WILDLIFE SERVICE
FWS, CONSTRUCTION A/E TEAM 2

Place of Performance

Dates

Posted Sep 24, 2025 10 months ago
Last Updated Aug 06, 2026 2 days ago
Awarded Sep 24, 2025 10 months ago