Z--MEDFORD HOT WATER HEATER REPLACEMENT- BLM MEDFORD DISTRICT, OR 140L4326R0003
Summary
AI-generated · Feb 10, 2026Replace existing hot water heaters at the BLM Medford District with high-efficiency units. The scope includes demolishing the old heaters, installing new ones, reconfiguring the heating system’s piping and venting, and performing all related electrical work, plus on-site demonstration/training for BLM personnel. The contract is firm-fixed-price and anticipated to be in the $30,000–$40,000 range. Start within 10 days after notice to proceed and complete the work, ready for use, within 30 days; some materials may be subject to Buy American construction requirements.
Award will be made using a best-value, lowest-price technically acceptable process, with the technical factor of Relevant Experience dominating the evaluation. Proposals from qualified firms will be invited when the solicitation is issued.
Medford Hot Water Heater Replacement, BLM Medford District, Oregon This notice is posted in accordance with Federal Acquisition Regulation (FAR) 36.213-2 Pre-solicitation Notices and FAR 36.204 Disclosure of the Magnitude of Construction Projects. The Bureau of Land Management (BLM), Oregon State Office intends to issue a Request for Proposal for a firm-fixed price construction contract for Medford Hot Water Heater Replacement, BLM Medford District, OR. Work shall include replacing the existing water heaters, including demolition of the existing water heaters; installation of a new high-efficiency water heaters; reconfiguring the existing water heating system piping; and reconfiguring the existing water heater vent piping along with all electrical work required for related work elements and demonstration/training for BLM site personnel. The magnitude of this construction project is between $30,000.00 and $40,000.00. The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 days after the date the contractor receives the notice to proceed. The solicitation will be issued as a total Small Business set aside under NAICS code 238220 Plumbing, Heating, and Air-Conditioning Contractors, and size standard $19 million. One or more of the items under this acquisition is subject to Buy American-Construction Materials. The basis of award will utilize the best value continuum -- lowest price technically acceptable source selection process in accordance with FAR subpart 15.101-2 to result in an award to the responsible offeror pursuant to FAR subpart 9.1. The technical/non-price evaluation factor(s) are Relevant Experience where technical/non-price evaluation factors, when combined, are significantly more important than price. The solicitation is anticipated to be issued on or about 25 February 2026. All responsible Small Business sources may submit a proposal which shall be considered by the agency. You may direct questions about this solicitation to the contract specialist Holand Nordholm at hnordholm@blm.gov.
From Presolicitation posted on Feb 09, 2026MEDFORD HOT WATER HEATER REPLACEMET
From Solicitation posted on Feb 24, 2026MEDFORD HOT WATER HEATER REPLACEMET
From Solicitation posted on Mar 18, 2026The objective of this project is to replace the existing water heaters, including demolition of the existing water heaters; installation of a new high-efficiency water heater; reconfiguring the existing water heating system piping; and reconfiguring the existing water heater vent piping along with all electrical work required for related work elements and demonstration/training for BLM site personnel.
From Award Notice posted on Apr 29, 2026Notice history
4-
Presolicitation Posted Feb 09, 2026
-
Solicitation Posted Feb 24, 2026View changes (5)
- Title: Z--MEDFORD HOT WATER HEATER REPLACEMENT- BLM MEDFORD DISTRICT, OR → MEDFORD HOT WATER HEATER REPLACEMENT- BLM MEDFORD
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Feb 23, 2026 → Mar 26, 2026
- Set-Aside: None → Total Small Business Set-Aside (FAR 19.5)
-
Solicitation Posted Mar 18, 2026View changes (1)
- Title: MEDFORD HOT WATER HEATER REPLACEMENT- BLM MEDFORD → Z--MEDFORD HOT WATER HEATER REPLACEMENT- BLM MEDFORD
-
Award Notice LATEST Posted Apr 29, 2026
Details
Award Information
Award Notices
Posted: Apr 29, 2026
The objective of this project is to replace the existing water heaters, including demolition of the existing water heaters; installation of a new high-efficiency water heater; reconfiguring the existing water heating system piping; and reconfiguring the existing water heater vent piping along with a...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| Lone Star Plumbing Company LLC | TPDCJLPJEC61 | 1Z5S1 | Beaverton, OR |
Contacts