Z--MEDFORD HOT WATER HEATER REPLACEMENT- BLM MEDFORD 140L4326R0003

Solicitation 140L4326R0003 Copied Notice ID ca08409768c24512828ff8b6b8828e87 Copied INTERIOR, DEPARTMENT OF THE — OREGON STATE OFFICE
SAM.gov
Posted
Apr 29, 2026
Deadline
No deadline
Set-aside
None
NAICS
238220
PSC
Z2EB

Summary

AI-generated · Feb 10, 2026

Replace existing hot water heaters at the BLM Medford District with high-efficiency units. The scope includes demolishing the old heaters, installing new ones, reconfiguring the heating system’s piping and venting, and performing all related electrical work, plus on-site demonstration/training for BLM personnel. The contract is firm-fixed-price and anticipated to be in the $30,000–$40,000 range. Start within 10 days after notice to proceed and complete the work, ready for use, within 30 days; some materials may be subject to Buy American construction requirements.

Award will be made using a best-value, lowest-price technically acceptable process, with the technical factor of Relevant Experience dominating the evaluation. Proposals from qualified firms will be invited when the solicitation is issued.

Medford Hot Water Heater Replacement, BLM Medford District, Oregon This notice is posted in accordance with Federal Acquisition Regulation (FAR) 36.213-2 Pre-solicitation Notices and FAR 36.204 Disclosure of the Magnitude of Construction Projects. The Bureau of Land Management (BLM), Oregon State Office intends to issue a Request for Proposal for a firm-fixed price construction contract for Medford Hot Water Heater Replacement, BLM Medford District, OR. Work shall include replacing the existing water heaters, including demolition of the existing water heaters; installation of a new high-efficiency water heaters; reconfiguring the existing water heating system piping; and reconfiguring the existing water heater vent piping along with all electrical work required for related work elements and demonstration/training for BLM site personnel. The magnitude of this construction project is between $30,000.00 and $40,000.00. The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 days after the date the contractor receives the notice to proceed. The solicitation will be issued as a total Small Business set aside under NAICS code 238220 Plumbing, Heating, and Air-Conditioning Contractors, and size standard $19 million. One or more of the items under this acquisition is subject to Buy American-Construction Materials. The basis of award will utilize the best value continuum -- lowest price technically acceptable source selection process in accordance with FAR subpart 15.101-2 to result in an award to the responsible offeror pursuant to FAR subpart 9.1. The technical/non-price evaluation factor(s) are Relevant Experience where technical/non-price evaluation factors, when combined, are significantly more important than price. The solicitation is anticipated to be issued on or about 25 February 2026. All responsible Small Business sources may submit a proposal which shall be considered by the agency. You may direct questions about this solicitation to the contract specialist Holand Nordholm at hnordholm@blm.gov.

From Presolicitation posted on Feb 09, 2026

MEDFORD HOT WATER HEATER REPLACEMET

From Solicitation posted on Feb 24, 2026

MEDFORD HOT WATER HEATER REPLACEMET

From Solicitation posted on Mar 18, 2026

The objective of this project is to replace the existing water heaters, including demolition of the existing water heaters; installation of a new high-efficiency water heater; reconfiguring the existing water heating system piping; and reconfiguring the existing water heater vent piping along with all electrical work required for related work elements and demonstration/training for BLM site personnel.

From Award Notice posted on Apr 29, 2026

Notice history

4
  1. Presolicitation Posted Feb 09, 2026 View
  2. Solicitation Posted Feb 24, 2026
    • Title: Z--MEDFORD HOT WATER HEATER REPLACEMENT- BLM MEDFORD DISTRICT, ORMEDFORD HOT WATER HEATER REPLACEMENT- BLM MEDFORD
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Feb 23, 2026Mar 26, 2026
    • Set-Aside: NoneTotal Small Business Set-Aside (FAR 19.5)
  3. Solicitation Posted Mar 18, 2026
    • Title: MEDFORD HOT WATER HEATER REPLACEMENT- BLM MEDFORD Z--MEDFORD HOT WATER HEATER REPLACEMENT- BLM MEDFORD
  4. Award Notice LATEST Posted Apr 29, 2026

Details

Solicitation number 140L4326R0003
Notice ID ca08409768c24512828ff8b6b8828e87
Award number 140L4326P0048
Notice type Award Notice
Product / Service (PSC) Z2EB
NAICS 238220
Archive date May 14, 2026

Award Information

Awardee
1
Total Awarded
$35,200.00
Award Date
Apr 29, 2026

Award Notices

Z--MEDFORD HOT WATER HEATER REPLACEMENT- BLM MEDFORD View Notice

Posted: Apr 29, 2026

The objective of this project is to replace the existing water heaters, including demolition of the existing water heaters; installation of a new high-efficiency water heater; reconfiguring the existing water heating system piping; and reconfiguring the existing water heater vent piping along with a...

Awardees

Company Name UEI CAGE Code Location
Lone Star Plumbing Company LLC TPDCJLPJEC61 1Z5S1 Beaverton, OR

Documents

No files available

View on SAM.gov

Contacts

primary
Sotelo, Jacqueline

Email

Phone

0000000000

Agency

INTERIOR, DEPARTMENT OF THE
BUREAU OF LAND MANAGEMENT
OREGON STATE OFFICE

Place of Performance

Dates

Posted Apr 29, 2026 3 months ago
Last Updated Aug 06, 2026 1 day ago
Awarded Apr 29, 2026 3 months ago