Yuba Gravel Placement W9123825PA028
Summary
AI-generated · Aug 24, 2025Gravel augmentation to place spawning-grade gravel and cobble in the Englebright Dam Reach of the Lower Yuba River is being pursued to rehabilitate geomorphic processes and aquatic habitat, supporting adult spawning, embryo incubation, and survival to emergence for Central Valley spring-run Chinook salmon and Central Valley steelhead. The project area lies downstream of Englebright Dam, between Englebright Dam and Deer Creek, in a canyon off Highway 20 near Marysville, CA, and is intended as a long-term effort to improve the ecological functioning of the river channel and its critical habitat.
Two awards were issued to JUD SOLUTIONS LLC for this project, one for $564,000 and one for $5,577,204, both on the same date, indicating multiple contract components or phases of the same gravel-placement effort. The notice provides no additional scope differences beyond the separate award amounts.
The purpose of gravel augmentation is to place suitable-sized spawning gravel within the upper Narrows reach for rehabilitating associated geomorphic processes and aquatic habitat in the Englebright Dam reach of the Lower Yuba River. Implementation of a long-term augmentation program will serve to improve the overall ecological functionality of the channel. The project will provide gravel and cobble suitable for anadromous salmonid adult spawning, embryo incubation, and survival to emergence in a key area in the lower Yuba River designated as critical habitat for the Central Valley spring-run Chinook salmon and the Central Valley steelhead. The project area is located on the lower Yuba River downstream of Englebright Dam (Yuba River mile 23.9), Yuba County, California (Plate 1). Gravel augmentation will be confined to the river channel located between Englebright Dam and the junction with Deer Creek. This reach is called the Englebright Dam Reach and it is located in the steep canyon off Highway 20, about 23 miles east of Marysville, California.
From Award Notice posted on Jul 15, 2025Award Annoucement
From Award Notice posted on Jul 16, 2025Notice history
2-
-
Award Notice LATEST Posted Jul 16, 2025
Details
Award Information
Award Notices
Posted: Jul 15, 2025
The purpose of gravel augmentation is to place suitable-sized spawning gravel within the upper Narrows reach for rehabilitating associated geomorphic processes and aquatic habitat in the Englebright Dam reach of the Lower Yuba River. Implementation of a long-term augmentation program will serve to i...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| JUD SOLUTIONS LLC | GN28JESA9ZC4 | 9WVF3 | Vero Beach, FL |
Contacts
Phone
Agency
Place of Performance
USA