Yakima Delta 1135 Causeway Removal W912EF25BA017

Solicitation W912EF25BA017 Copied Notice ID 94a05206f7b34c2fa4f5e13d3b6bfc82 Copied DEPT OF DEFENSE — US ARMY ENGINEER DISTRICT WALLA WAL
SAM.gov
Posted
Aug 29, 2025
Deadline
No deadline
Set-aside
SBA
NAICS
237990
PSC
Y1QA

Summary

AI-generated · Sep 01, 2025

Removal of the Yakima Delta 1135 Causeway entails removing the causeway materials, performing selective demolition and removal of existing features, plus earthwork, concrete work, vegetation removal, and in-water activities to restore aquatic habitat. Earthwork must grade and stabilize the shoreline and install materials, with care to avoid Bateman Island to minimize impacts on culturally sensitive areas. About 30,000 cubic yards of material will need hauling offsite to an approved disposal site within 10 miles of the construction site.

On-site safety and health compliance is mandatory under the Corps of Engineers EM 385-1-1 framework. The contractor must establish and manage a comprehensive safety program, submitting a project-specific Accident Prevention Plan for government acceptance, as well as Activity Hazard Analyses for each phase and a Fall Protection Plan. A Site Safety and Health Officer (SSHO) employed by the prime contractor is required for each shift, with at least five years of construction safety experience on similar projects and completion of the 30-Hour OSHA training.

Yakima Delta 1135 Causeway Removal pre-solicitation: Scope: This construction project includes removal of causeway material, selective demolition and removal of existing features, earthwork, concrete, vegetation, and in-water work necessary to restore the aquatic habitat. Earthwork is required to grade, stabilize, and install material along the shoreline. Avoidance of Bateman Island is necessary to minimize impacts to culturally sensitive areas. Material will be hauled offsite to an approved disposal site within 10 miles of construction site. Approximately 30,000 CY of material will require hauling from the causeway removal. All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1). The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1- 1. A Site Safety and Health Officer (SSHO) employed by the prime contractor shall be required for each shift of the contractor's on-site operations. The SSHO shall possess a minimum of 5-years of experience in construction safety on similar projects, shall have completed the 30-Hour OSHA

From Presolicitation posted on Aug 29, 2025

Solicitation package for the Yakima Delta 1135 Causeway Removal

From Solicitation posted on Sep 22, 2025

9/23/2025 solicitation Amendment 0001- added See attachements for details. _____________________________________ Solicitation package for the Yakima Delta 1135 Causeway Removal

From Solicitation posted on Sep 23, 2025

9/26/2025 Solicitation Amendment 0002 - added see attachments for details ___________________________________ 9/23/2025 solicitation Amendment 0001- added See attachements for details. _____________________________________ Solicitation package for the Yakima Delta 1135 Causeway Removal

From Solicitation posted on Sep 26, 2025

10/3/2025: Site Visit Attendance See attachement ____________________________________________________ 9/26/2025 Solicitation Amendment 0002 - added see attachments for details ___________________________________ 9/23/2025 solicitation Amendment 0001- added See attachements for details. _____________________________________ Solicitation package for the Yakima Delta 1135 Causeway Removal

From Solicitation posted on Oct 03, 2025

10/20/2025: Solicitation Amendment 0003 added. _____________________________________ 10/3/2025: Site Visit Attendance See attachement ____________________________________________________ 9/26/2025 Solicitation Amendment 0002 - added see attachments for details ___________________________________ 9/23/2025 solicitation Amendment 0001- added See attachements for details. _____________________________________ Solicitation package for the Yakima Delta 1135 Causeway Removal

From Solicitation posted on Oct 20, 2025

10/22/2025: Bid Resuts added. ___________________________________________________________ 10/22/2025: Updated solicitation amendment 0003 was formerly missing contracting officer signature. Update version is added with signature and former one without is now deleted. _________________________________________________________ 10/20/2025: Solicitation Amendment 0003 added. _____________________________________ 10/3/2025: Site Visit Attendance See attachement ____________________________________________________ 9/26/2025 Solicitation Amendment 0002 - added see attachments for details ___________________________________ 9/23/2025 solicitation Amendment 0001- added See attachements for details. _____________________________________ Solicitation package for the Yakima Delta 1135 Causeway Removal

From Solicitation posted on Oct 22, 2025

Notice history

7
  1. Presolicitation Posted Aug 29, 2025
  2. Solicitation Posted Sep 22, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Not setOct 17, 2025
  3. Solicitation Posted Sep 23, 2025
    • Description: Description was updated
    • Response Deadline: Oct 17, 2025Oct 22, 2025
  4. Solicitation Posted Sep 26, 2025
    • Description: Description was updated
  5. Solicitation Posted Oct 03, 2025
    • Description: Description was updated
  6. Solicitation Posted Oct 20, 2025
    • Description: Description was updated
  7. Solicitation LATEST Posted Oct 22, 2025
    • Description: Description was updated

Details

Solicitation number W912EF25BA017
Notice ID 94a05206f7b34c2fa4f5e13d3b6bfc82
Notice type Presolicitation
Product / Service (PSC) Y1QA
NAICS 237990
Place of performance Richland, Washington
Archive date Oct 15, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
LeAnne R. Walling

Email

Phone

5095277802

secondary
Chandra D. Crow

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION NORTHWESTERN
US ARMY ENGINEER DISTRICT WALLA WAL

Place of Performance

Richland, Washington 99352
USA

Dates

Posted Aug 29, 2025 11 months ago
Last Updated Aug 06, 2026 2 days ago