Yakima Delta 1135 Causeway Removal W912EF25BA017
Summary
AI-generated · Sep 01, 2025Removal of the Yakima Delta 1135 Causeway entails removing the causeway materials, performing selective demolition and removal of existing features, plus earthwork, concrete work, vegetation removal, and in-water activities to restore aquatic habitat. Earthwork must grade and stabilize the shoreline and install materials, with care to avoid Bateman Island to minimize impacts on culturally sensitive areas. About 30,000 cubic yards of material will need hauling offsite to an approved disposal site within 10 miles of the construction site.
On-site safety and health compliance is mandatory under the Corps of Engineers EM 385-1-1 framework. The contractor must establish and manage a comprehensive safety program, submitting a project-specific Accident Prevention Plan for government acceptance, as well as Activity Hazard Analyses for each phase and a Fall Protection Plan. A Site Safety and Health Officer (SSHO) employed by the prime contractor is required for each shift, with at least five years of construction safety experience on similar projects and completion of the 30-Hour OSHA training.
Yakima Delta 1135 Causeway Removal pre-solicitation: Scope: This construction project includes removal of causeway material, selective demolition and removal of existing features, earthwork, concrete, vegetation, and in-water work necessary to restore the aquatic habitat. Earthwork is required to grade, stabilize, and install material along the shoreline. Avoidance of Bateman Island is necessary to minimize impacts to culturally sensitive areas. Material will be hauled offsite to an approved disposal site within 10 miles of construction site. Approximately 30,000 CY of material will require hauling from the causeway removal. All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1). The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1- 1. A Site Safety and Health Officer (SSHO) employed by the prime contractor shall be required for each shift of the contractor's on-site operations. The SSHO shall possess a minimum of 5-years of experience in construction safety on similar projects, shall have completed the 30-Hour OSHA
From Presolicitation posted on Aug 29, 2025Solicitation package for the Yakima Delta 1135 Causeway Removal
From Solicitation posted on Sep 22, 20259/23/2025 solicitation Amendment 0001- added See attachements for details. _____________________________________ Solicitation package for the Yakima Delta 1135 Causeway Removal
From Solicitation posted on Sep 23, 20259/26/2025 Solicitation Amendment 0002 - added see attachments for details ___________________________________ 9/23/2025 solicitation Amendment 0001- added See attachements for details. _____________________________________ Solicitation package for the Yakima Delta 1135 Causeway Removal
From Solicitation posted on Sep 26, 202510/3/2025: Site Visit Attendance See attachement ____________________________________________________ 9/26/2025 Solicitation Amendment 0002 - added see attachments for details ___________________________________ 9/23/2025 solicitation Amendment 0001- added See attachements for details. _____________________________________ Solicitation package for the Yakima Delta 1135 Causeway Removal
From Solicitation posted on Oct 03, 202510/20/2025: Solicitation Amendment 0003 added. _____________________________________ 10/3/2025: Site Visit Attendance See attachement ____________________________________________________ 9/26/2025 Solicitation Amendment 0002 - added see attachments for details ___________________________________ 9/23/2025 solicitation Amendment 0001- added See attachements for details. _____________________________________ Solicitation package for the Yakima Delta 1135 Causeway Removal
From Solicitation posted on Oct 20, 202510/22/2025: Bid Resuts added. ___________________________________________________________ 10/22/2025: Updated solicitation amendment 0003 was formerly missing contracting officer signature. Update version is added with signature and former one without is now deleted. _________________________________________________________ 10/20/2025: Solicitation Amendment 0003 added. _____________________________________ 10/3/2025: Site Visit Attendance See attachement ____________________________________________________ 9/26/2025 Solicitation Amendment 0002 - added see attachments for details ___________________________________ 9/23/2025 solicitation Amendment 0001- added See attachements for details. _____________________________________ Solicitation package for the Yakima Delta 1135 Causeway Removal
From Solicitation posted on Oct 22, 2025Notice history
7-
-
Solicitation Posted Sep 22, 2025View changes (3)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Not set → Oct 17, 2025
-
Solicitation Posted Sep 23, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Oct 17, 2025 → Oct 22, 2025