Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement 36C24826R0028
Summary
AI-generated · Mar 09, 2026Provide construction services to create redundant capacity in the building’s chilled and condenser water systems and their auxiliary components. Key elements include adding a 1,250-ton water-cooled chiller on the second-floor addition, installing a two-cell cooling tower on the roof, and placing the electrical gear for the new equipment on the third level. The fourth level will house an additional electrical generator that is to be procured under a separate project. Site preparation per the 100% design, narrative, addenda, and specifications is required, including demolition/removal of existing structures and furnishing all labor and materials to complete the work per the SOW.
This is a full construction effort to implement redundancy for the chiller plant and integrate with existing systems, with the generator portion handled in a separate project. The period of performance is a long-term construction effort from notice to proceed.
The contractor shall provide construction services in accordance with the Statement of Work for Project Number: 546-23-105 Create Redundancy Capacity in Chiller Plant System. The primary objective of this project is to provide redundant capacity for the existing chilled and condenser water systems and their associated auxiliary systems. This includes adding a new water-cooled chiller, sized for 1,250 tons, on the second level of the building addition and installing a new two-cell cooling tower on the roof. Additionally, electrical gear supporting the new equipment will be located on the third level, and the fourth level will be the housing for an additional Electrical Generator (to be procured under a separate project). The Contractor shall prepare the site for building operations in accordance with the 100% Design, Narrative, Addendum, and Specifications. This includes demolition and removal of existing structures, furnishing labor and materials, and completing all tasks as per this Statement of Work (SOW). Period of Performance (POP) Dates: 1095 Calendar Days from the notice to proceed (NTP). PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction. PRODUCT/SERVICE CODE: Y1NB - Construction of Heating and Cooling Plants.
From Solicitation posted on Mar 06, 2026The contractor shall provide construction services in accordance with the Statement of Work for Project Number: 546-23-105 Create Redundancy Capacity in Chiller Plant System. The primary objective of this project is to provide redundant capacity for the existing chilled and condenser water systems and their associated auxiliary systems. This includes adding a new water-cooled chiller, sized for 1,250 tons, on the second level of the building addition and installing a new two-cell cooling tower on the roof. Additionally, electrical gear supporting the new equipment will be located on the third level, and the fourth level will be the housing for an additional Electrical Generator (to be procured under a separate project). The Contractor shall prepare the site for building operations in accordance with the 100% Design, Narrative, Addendum, and Specifications. This includes demolition and removal of existing structures, furnishing labor and materials, and completing all tasks as per this Statement of Work (SOW). Period of Performance (POP) Dates: 1095 Calendar Days from the notice to proceed (NTP). PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction. PRODUCT/SERVICE CODE: Y1NB - Construction of Heating and Cooling Plants.
From Solicitation posted on Apr 16, 2026The contractor shall provide construction services in accordance with the Statement of Work for Project Number: 546-23-105 Create Redundancy Capacity in Chiller Plant System. The primary objective of this project is to provide redundant capacity for the existing chilled and condenser water systems and their associated auxiliary systems. This includes adding a new water-cooled chiller, sized for 1,250 tons, on the second level of the building addition and installing a new two-cell cooling tower on the roof. Additionally, electrical gear supporting the new equipment will be located on the third level, and the fourth level will be the housing for an additional Electrical Generator (to be procured under a separate project). The Contractor shall prepare the site for building operations in accordance with the 100% Design, Narrative, Addendum, and Specifications. This includes demolition and removal of existing structures, furnishing labor and materials, and completing all tasks as per this Statement of Work (SOW). Period of Performance (POP) Dates: 1095 Calendar Days from the notice to proceed (NTP). PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction. PRODUCT/SERVICE CODE: Y1NB - Construction of Heating and Cooling Plants.
From Solicitation posted on Apr 20, 2026Notice history
3-
-
Solicitation LATEST Posted Apr 20, 2026View changes (1)
- Response Deadline: Apr 21, 2026 → Apr 27, 2026
Details
Award Information
Not yet awarded
Contacts
Contracting Officer
Phone
Agency
Place of Performance
USA