XTLF 25-1021 Repair Hangar Doors F141 FA3029-25-01
Summary
AI-generated · Aug 24, 2025Remove the existing bi-parting hangar doors and install like-for-like replacement doors; the scope excludes the upper tail doors. The contract was awarded to Terra Construction, LLC for $2,646,579.
The work covered under this Statement of Work shall consist of the following: remove bi-parting hangar doors, replace with like in-kind product. The existing upper tail doors are not included in the scope of this project.
From Award Notice posted on Aug 18, 2025Notice history
1-
Award Notice LATEST Posted Aug 18, 2025
Details
Award Information
Award Notices
Posted: Aug 18, 2025
The work covered under this Statement of Work shall consist of the following: remove bi-parting hangar doors, replace with like in-kind product. The existing upper tail doors are not included in the scope of this project.
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| TERRA CONSTRUCTION, LLC | UVR8K1KKR675 | 0F7W6 | Oklahoma City, OK |
Contacts
Phone
Phone
Agency
Place of Performance
USA