XTLF 15-1018 Repair AA and E Storage at F527 FA3029-0003
Summary
AI-generated · Oct 09, 2025Renovate building 527 to bring AA&E storage in line with UFC 04-026-01 and MIL-HNDBK 1013/1A, addressing the deviation VANCE AFB 97-01. The project focuses on strengthening the storage room and ensuring compliance with security and safety standards so the facility no longer poses risk to the base.
Scope includes reinforcing the AA&E storage room by adding steel and plywood to surrounding interior walls and ceiling, removing and reinstalling fixtures on the new wall/ceiling faces, and replacing the entry door with a compliant one. Window fasteners will be swapped for tamper-resistant types, interior electrical circuits dedicated to the room will be relocated to a new panel outside the room for better emergency access, and AA&E Risk Categories II–IV must be stored in a structure with at least 10 minutes of forced-entry resistance against threat severity level III. Without the renovation, the building would not meet UFC/MIL-HNDBK requirements and would remain a safety risk to the base.
This service will renovate building 527 to comply with UFC 04-026-01 and MIL-HNDBK 1013/1A. The building requires minor renovations to eliminate deviation request VANCE AFB 97-01. The scope of this work includes the reinforcement of the existing AA&E storage room by adding steel and plywood layers to surrounding interior walls and ceiling. Existing fixtures will be removed and reinstalled on the new wall and ceiling faces. Entry door will be replaced with a compliant door, and window fasteners will be replaced with compliant tamper-resistant fasteners. Circuits on the interior electrical panel dedicated to other areas of the facility will be relocated to a new panel outside the room, providing better access to emergency personnel. AA&E Risk Categories II through IV must be stored in a structure with a minimum forced entry resistance of 10 minutes against threat severity level III. If facility does not receive renovation, the building will not meet UFC and MIL-HNDBK code and remain potential risk of safety to the base.
From Award Notice posted on Oct 02, 2025Notice history
1-
Award Notice LATEST Posted Oct 02, 2025
Details
Award Information
Award Notices
Posted: Oct 02, 2025
This service will renovate building 527 to comply with UFC 04-026-01 and MIL-HNDBK 1013/1A. The building requires minor renovations to eliminate deviation request VANCE AFB 97-01. The scope of this work includes the reinforcement of the existing AA&E storage room by adding steel and plywood layers t...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| WALDROP CONSTRUCTION INC | T53ANRCADY13 | 59MY0 | Oklahoma City, OK |
Contacts
Phone
Phone
Agency
Place of Performance
USA