V-22 Department of the Navy Large Aircraft Infrared Countermeasures Processor Upgrade Control Indicator Unit Replacement-0401 Non-Recurring Engineering N0001924F0014-P00013
Summary
AI-generated · Dec 12, 2025Non-recurring engineering to provide updated engineering and support products needed to install and sustain the Department of the Navy Large Aircraft Infrared Countermeasures Processor Upgrade Control Indicator Unit Replacement-0401 on MV-22 and CV-22 aircraft.
Awarded on a sole-source basis to Bell Boeing Joint Project Office, the sole designer/developer/producer of the V-22 with the necessary knowledge and data. The work is a Cost Plus Fixed Fee effort, with an award amount of $509,748.
Related Notice: N00019-24-RFPREQ-APM275-0608 Naval Air Systems Command, V-22 Joint Program Office, PMA-275 issued a modification to Delivery Order N0001924F0014 under Basic Ordering Agreement N0001922G0002 to the Bell Boeing Joint Project Office on a sole-source basis for non-recurring engineering to provide updated engineering and support products to allow the installation and sustainment of the Department of the Navy Large Aircraft Infrared Countermeasures Processor Upgrade Control Indicator Unit Replacement-0401 on MV-22 and CV-22 aircraft. This action was awarded on a sole source basis to the Bell Boeing Joint Program Office in accordance with the statutory authority permitting other than full and open competition under Title 10 U.S.C. 3204(a)(1), as implemented by FAR Part 6.302-1, "Only one responsible source and no other supplies or services will satisfy agency requirements." Bell Boeing is the sole designer, developer, and producer of the V-22 Tiltrotor aircraft and is the only known source that possesses the requisite knowledge and expertise required to perform this effort. Also, Bell Boeing is the only source that possesses the totality of engineering and technical data required to perform these efforts. This Delivery Order includes Cost Plus Fixed Fee Contract Line Item Numbers. Cost Plus Fixed Fee was selected because there are uncertainties involved in contract performance that do not permit costs to be estimated with sufficient accuracy to use any type of fixed price.
From Award Notice posted on Dec 11, 2025Notice history
1-
Award Notice LATEST Posted Dec 11, 2025
Details
Award Information
Award Notices
Posted: Dec 11, 2025
Related Notice: N00019-24-RFPREQ-APM275-0608 Naval Air Systems Command, V-22 Joint Program Office, PMA-275 issued a modification to Delivery Order N0001924F0014 under Basic Ordering Agreement N0001922G0002 to the Bell Boeing Joint Project Office on a sole-source basis for non-recurring engineering t...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| BELL BOEING JOINT PROJECT OFFICE | JHFZTG8ZC9V2 | 3B1R2 | Amarillo, TX |
Contacts
Agency
Place of Performance
USA