Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 3 notices 34 documents

USS BLUE RIDGE 5C1 DSRA TYCOM 5 N6264925RA054

Solicitation N6264925RA054 Copied Notice ID 3e59363948c2486986a6daf689c38e7d Copied DEPT OF DEFENSE — NAVSUP FLT LOG CTR YOKOSUKA
SAM.gov
Posted
Sep 25, 2025
Deadline
Sep 29, 2025
Set-aside
None
NAICS
336611
PSC
J999

Summary

AI-generated · Aug 23, 2025

Repair, maintenance, and overhaul of USS Blue Ridge (LCC-19) under a Docking-Selected Restricted Availability includes 13 Task Group Instructions with eight test phases focused on onboard repair, preservation, and replacement work. The contractor must establish the capability to support testing, quality assurance, and technical documentation, and provide a schedule and staffing plan that identifies all workers and coordinates the work sequence to prevent delays. The contractor will be responsible for all labor, subcontractor management, supervision, quality control/assurance, safety, environmental management, materials, equipment, temporary services, and transportation needed to complete the work.

A Growth CLIN will be used to accommodate anticipated growth work and will be processed via Growth Management Request LOE to Completion. References will be provided through a DoD secure web-based tool; proposals must identify any hazardous materials per FAR 52.223-3 and DFARS 252.223-7001 and indicate whether sea transportation will be used per DFARS 252.247-7022. If amendments are issued, they must be acknowledged in the proposal. Some TGIs cannot be uploaded to SAM due to technical difficulties.

The requirement is for ship repair, maintenance and overhaul of United States (US) Navy surface ship USS BLUE RIDGE (LCC-19), Docking-Selected Restricted Availability (DSRA), in support of US Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC). The work is composed of 13 Task Group Instructions (TGIs) with eight (8) Test Phases of various ship repair overhaul, preservation, and replacement work onboard the ship. The work also includes a Government requirement to establish the capability to support testing, quality assurance, technical documents and other requirements as necessary to accomplish the specified requirements. It places an administratively technical requirement on the contractor to provide a schedule and staffing plan for the identification and assignment of all contracted workers, as well as the coordination of the work to be performed by the contractor to ensure proper sequencing of work and the prevention of potential work stoppages or delays. In addition, the contractor is responsible for all labor, subcontractor management, supervision, coordination, quality control, quality assurance, quality management, safety management, environmental management, material, equipment, temporary services, and transportation necessary to perform the requirement. To improve Condition Found Report (CFR) turnaround time, a Growth CLIN will be implemented to accommodate anticipated growth works and will be processed utilizing the Growth Management Request (GMR) Level of Effort (LOE) to Completion. The anticipated contractual Period of Performance (POP) is 12-Jan-2026 through 15-May-2027. Due to some technical difficulties, Task Group Instructions (TGIs) currenlty cannot be uploaded to SAM. Gov. Please kindly check the following TGIs and its descriptions for your reference. 3819P25501-A01: SHIP ALTERATION (SA) 80992K, MODIFICATION OF DEAERATING FEED TANK SIGHTGLASS INDICATOR DRAIN PIPING; ACCOMPLISH 3819P49501-A01: SA 82269K, LCC 19 ESLP N7 THEATER SECURITY COOPERATION OFFICE; ACCOMPLISH 3819P49501-T01: VOLUMETRIC AND BALANCE TEST FOR VENTILATION SYSTEM, SA 82269K 3819P49501-T02: OPERATIONAL TEST FOR ALARM, SAFETY, AND WARNING SYSTEMS 3819P51206-A01: SA 80964K, ACCOMPLISH AIR CONDITIONING LOAD CENTER 1-4; ACCOMPLISH 3819P51206-T01: TIGHTNESS AND OPERATIONAL TEST FOR CHILL WATER SYSTEM 3819P51206-T02: TIGHTNESS AND OPERATIONAL TEST FOR HEATING SYSTEM SA 80964K 3819P51206-T03: OPERATIONAL, VOLUMETRIC, AND BALANCE TEST FOR VENTILATION SYSTEM 3819P51206-T04: TIGHTNESS AND OPERATIONAL, VOLUMETRIC AND BALANCE TEST FOR FAN COIL UNIT 3819P51206-T05: TIGHTNESS AND OPERATIONAL, VOLUMETRIC AND BALANCE TEST FOR FAN COIL UNIT 3819P51206-T07: OPERATIONAL TEST WITH VIB-CUT AND VOLUMETRIC AND BALANCE TEST FOR VENTILATION SYSTEMS 3819P52302-A01: SA 81205K, MODIFICATION OF COUNTERMEASURE WASHDOWN (CMWD) PIPING; ACCOMPLISH 3819P52302-T01: OPERATIONAL TEST FOR ALARM, SAFETY, AND WARNING SYSTEMS, SA 81205K 3819P52601-A01: SCD 11176K, MODIFICATION OF FORECASTLE DECK DRAIN AND PIPING; ACCOMPLISH OFFER: Offerors must provide all information required by this solicitation not later than 30 Jun 2025 at 10:00AM Japan Standard Time (JST). References in the Work Items will be provided to offerors via DoD safe (a web-based tool that provides users the capability to securely send and receive large files, including files that are too large to be transmitted via email. Please email request for references to: Miwa Takahashi (miwa.takahashi2.ln@us.navy.mil) When submitting your proposal, you must specify any hazardous material in accordance with FAR 52.223-3 (Hazardous Material ID) and DFARS 252.223-7001. When submitting your proposal, you must specify if you anticipate sea transportation in accordance with DFARS 252.247-7022. If there is a time limit on your offer, you must specify this at submission of your proposal. If there are any amendments to this RFP, please acknowledge them when submitting your proposal in the proposal comment section. On 18 Jun 2025, Soliciation Amendment N6264925RA0540001 was issued and the required response date/time has changed from 30-Jun-2025 10:00 AM to 22-Jul-2025 10:00 AM as amended.

From Solicitation posted on Jun 18, 2025

The requirement is for ship repair, maintenance and overhaul of United States (US) Navy surface ship USS BLUE RIDGE (LCC-19), Docking-Selected Restricted Availability (DSRA), in support of US Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC). The work is composed of 13 Task Group Instructions (TGIs) with eight (8) Test Phases of various ship repair overhaul, preservation, and replacement work onboard the ship. The work also includes a Government requirement to establish the capability to support testing, quality assurance, technical documents and other requirements as necessary to accomplish the specified requirements. It places an administratively technical requirement on the contractor to provide a schedule and staffing plan for the identification and assignment of all contracted workers, as well as the coordination of the work to be performed by the contractor to ensure proper sequencing of work and the prevention of potential work stoppages or delays. In addition, the contractor is responsible for all labor, subcontractor management, supervision, coordination, quality control, quality assurance, quality management, safety management, environmental management, material, equipment, temporary services, and transportation necessary to perform the requirement. To improve Condition Found Report (CFR) turnaround time, a Growth CLIN will be implemented to accommodate anticipated growth works and will be processed utilizing the Growth Management Request (GMR) Level of Effort (LOE) to Completion. The anticipated contractual Period of Performance (POP) is 21-JUL-2026 TO 21-NOV-2027 (Changed from the original POP of 12-JAN-2026 TO 15-MAY-2027) Due to some technical difficulties, Task Group Instructions (TGIs) currenlty cannot be uploaded to SAM. Gov. Please kindly check the following TGIs and its descriptions for your reference. 3819P25501-A01: SHIP ALTERATION (SA) 80992K, MODIFICATION OF DEAERATING FEED TANK SIGHTGLASS INDICATOR DRAIN PIPING; ACCOMPLISH 3819P49501-A01: SA 82269K, LCC 19 ESLP N7 THEATER SECURITY COOPERATION OFFICE; ACCOMPLISH 3819P49501-T01: VOLUMETRIC AND BALANCE TEST FOR VENTILATION SYSTEM, SA 82269K 3819P49501-T02: OPERATIONAL TEST FOR ALARM, SAFETY, AND WARNING SYSTEMS 3819P51206-A01: SA 80964K, ACCOMPLISH AIR CONDITIONING LOAD CENTER 1-4; ACCOMPLISH 3819P51206-T01: TIGHTNESS AND OPERATIONAL TEST FOR CHILL WATER SYSTEM 3819P51206-T02: TIGHTNESS AND OPERATIONAL TEST FOR HEATING SYSTEM SA 80964K 3819P51206-T03: OPERATIONAL, VOLUMETRIC, AND BALANCE TEST FOR VENTILATION SYSTEM 3819P51206-T04: TIGHTNESS AND OPERATIONAL, VOLUMETRIC AND BALANCE TEST FOR FAN COIL UNIT 3819P51206-T05: TIGHTNESS AND OPERATIONAL, VOLUMETRIC AND BALANCE TEST FOR FAN COIL UNIT 3819P51206-T07: OPERATIONAL TEST WITH VIB-CUT AND VOLUMETRIC AND BALANCE TEST FOR VENTILATION SYSTEMS 3819P52302-A01: SA 81205K, MODIFICATION OF COUNTERMEASURE WASHDOWN (CMWD) PIPING; ACCOMPLISH 3819P52302-T01: OPERATIONAL TEST FOR ALARM, SAFETY, AND WARNING SYSTEMS, SA 81205K 3819P52601-A01: SCD 11176K, MODIFICATION OF FORECASTLE DECK DRAIN AND PIPING; ACCOMPLISH OFFER: Offerors must provide all information required by this solicitation not later than 30 Jun 2025 at 10:00AM Japan Standard Time (JST). References in the Work Items will be provided to offerors via DoD safe (a web-based tool that provides users the capability to securely send and receive large files, including files that are too large to be transmitted via email. Please email request for references to: Miwa Takahashi (miwa.takahashi2.ln@us.navy.mil) When submitting your proposal, you must specify any hazardous material in accordance with FAR 52.223-3 (Hazardous Material ID) and DFARS 252.223-7001. When submitting your proposal, you must specify if you anticipate sea transportation in accordance with DFARS 252.247-7022. If there is a time limit on your offer, you must specify this at submission of your proposal. If there are any amendments to this RFP, please acknowledge them when submitting your proposal in the proposal comment section. On 18 Jun 2025, Soliciation Amendment N6264925RA0540001 was issued and the required response date/time has changed from 30-Jun-2025 10:00 AM to 22-Jul-2025 10:00 AM as amended. On 28 Aug 2025, Soliciation Amendment N6264925RA0540002 was issued to re-open the solicitation No. N6264925RA0540001 since revised TGIs with new POP dates of 21-JUL-2026 TO 21-NOV-2027 (Changed from the original POP was 12-JAN-2026 TO 15-MAY-2027) have been issued. The due date/time for submission of proposal for solicitation No. N6264925RA0540002 is 29 Sep 2025/10:00am.

From Solicitation posted on Aug 28, 2025

The requirement is for ship repair, maintenance and overhaul of United States (US) Navy surface ship USS BLUE RIDGE (LCC-19), Docking-Selected Restricted Availability (DSRA), in support of US Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC). The work is composed of 13 Task Group Instructions (TGIs) with eight (8) Test Phases of various ship repair overhaul, preservation, and replacement work onboard the ship. The work also includes a Government requirement to establish the capability to support testing, quality assurance, technical documents and other requirements as necessary to accomplish the specified requirements. It places an administratively technical requirement on the contractor to provide a schedule and staffing plan for the identification and assignment of all contracted workers, as well as the coordination of the work to be performed by the contractor to ensure proper sequencing of work and the prevention of potential work stoppages or delays. In addition, the contractor is responsible for all labor, subcontractor management, supervision, coordination, quality control, quality assurance, quality management, safety management, environmental management, material, equipment, temporary services, and transportation necessary to perform the requirement. To improve Condition Found Report (CFR) turnaround time, a Growth CLIN will be implemented to accommodate anticipated growth works and will be processed utilizing the Growth Management Request (GMR) Level of Effort (LOE) to Completion. The anticipated contractual Period of Performance (POP) is 21-JUL-2026 TO 21-NOV-2027 (Changed from the original POP of 12-JAN-2026 TO 15-MAY-2027) Due to some technical difficulties, Task Group Instructions (TGIs) currenlty cannot be uploaded to SAM. Gov. Please kindly check the following TGIs and its descriptions for your reference. 3819P25501-A01: SHIP ALTERATION (SA) 80992K, MODIFICATION OF DEAERATING FEED TANK SIGHTGLASS INDICATOR DRAIN PIPING; ACCOMPLISH 3819P49501-A01: SA 82269K, LCC 19 ESLP N7 THEATER SECURITY COOPERATION OFFICE; ACCOMPLISH 3819P49501-T01: VOLUMETRIC AND BALANCE TEST FOR VENTILATION SYSTEM, SA 82269K 3819P49501-T02: OPERATIONAL TEST FOR ALARM, SAFETY, AND WARNING SYSTEMS 3819P51206-A01: SA 80964K, ACCOMPLISH AIR CONDITIONING LOAD CENTER 1-4; ACCOMPLISH 3819P51206-T01: TIGHTNESS AND OPERATIONAL TEST FOR CHILL WATER SYSTEM 3819P51206-T02: TIGHTNESS AND OPERATIONAL TEST FOR HEATING SYSTEM SA 80964K 3819P51206-T03: OPERATIONAL, VOLUMETRIC, AND BALANCE TEST FOR VENTILATION SYSTEM 3819P51206-T04: TIGHTNESS AND OPERATIONAL, VOLUMETRIC AND BALANCE TEST FOR FAN COIL UNIT 3819P51206-T05: TIGHTNESS AND OPERATIONAL, VOLUMETRIC AND BALANCE TEST FOR FAN COIL UNIT 3819P51206-T07: OPERATIONAL TEST WITH VIB-CUT AND VOLUMETRIC AND BALANCE TEST FOR VENTILATION SYSTEMS 3819P52302-A01: SA 81205K, MODIFICATION OF COUNTERMEASURE WASHDOWN (CMWD) PIPING; ACCOMPLISH 3819P52302-T01: OPERATIONAL TEST FOR ALARM, SAFETY, AND WARNING SYSTEMS, SA 81205K 3819P52601-A01: SCD 11176K, MODIFICATION OF FORECASTLE DECK DRAIN AND PIPING; ACCOMPLISH OFFER: Offerors must provide all information required by this solicitation not later than 30 Jun 2025 at 10:00AM Japan Standard Time (JST). References in the Work Items will be provided to offerors via DoD safe (a web-based tool that provides users the capability to securely send and receive large files, including files that are too large to be transmitted via email. Please email request for references to: Miwa Takahashi (miwa.takahashi2.ln@us.navy.mil) When submitting your proposal, you must specify any hazardous material in accordance with FAR 52.223-3 (Hazardous Material ID) and DFARS 252.223-7001. When submitting your proposal, you must specify if you anticipate sea transportation in accordance with DFARS 252.247-7022. If there is a time limit on your offer, you must specify this at submission of your proposal. If there are any amendments to this RFP, please acknowledge them when submitting your proposal in the proposal comment section. On 18 Jun 2025, Soliciation Amendment N6264925RA0540001 was issued and the required response date/time has changed from 30-Jun-2025 10:00 AM to 22-Jul-2025 10:00 AM as amended. On 28 Aug 2025, Soliciation Amendment N6264925RA0540002 was issued to re-open the solicitation No. N6264925RA0540001 since revised TGIs with new POP dates of 21-JUL-2026 TO 21-NOV-2027 (Changed from the original POP was 12-JAN-2026 TO 15-MAY-2027) have been issued. The due date/time for submission of proposal for solicitation No. N6264925RA0540002 is 29 Sep 2025/10:00am. On 25 Sep 2025, Solicitation Amendment N6264925RA0540003 was issued to incorporate a change in the wording 1) at section C under block 16. REMARKS on page two (2) in the Contract Data Requirements List (CDRL). Please refer to the revised CDRL uploaded on SAM.gov. The due date/time for submission of proposal remains 29 Sep 2025/10:00am.

From Solicitation posted on Sep 25, 2025

Notice history

3
  1. Solicitation Posted Jun 18, 2025 View
  2. Solicitation Posted Aug 28, 2025
    • Description: Description was updated
    • Response Deadline: Jul 22, 2025Sep 29, 2025
  3. Solicitation LATEST Posted Sep 25, 2025
    • Description: Description was updated

Details

Solicitation number N6264925RA054
Notice ID 3e59363948c2486986a6daf689c38e7d
Notice type Solicitation
Product / Service (PSC) J999
NAICS 336611
Place of performance Yokosuka, Kanagawa
Archive date Oct 14, 2025

Award Information

Not yet awarded

Contacts

primary
Miwa Takahashi

Email

Phone

secondary
Ai Gillard - Contracting Officer

Email

Phone

0468257298

Agency

DEPT OF DEFENSE
DEPT OF THE NAVY
NAVSUP
NAVSUP GLOBAL LOGISTICS SUPPORT
NAVSUP FLC YOKOSUKA
NAVSUP FLT LOG CTR YOKOSUKA

Place of Performance

Yokosuka, Kanagawa
JPN

Dates

Posted Sep 25, 2025 10 months ago
Last Updated Aug 06, 2026 1 day ago
Due Sep 29, 2025 10 months ago