USCGC James Propulsion Troubleshoot 70Z08525Q0030131
Summary
AI-generated · Sep 05, 2025Port and starboard propeller pitch mapping must be repaired so engine RPM and vessel speed align on CGC JAMES. A Kongsberg-certified technical representative is required to repair the pitch mapping, provide onsite troubleshooting and HP mapping of the control systems, and work with an MTU engineer to achieve a maximum speed of 26 knots. The contractor will accompany the vessel for additional testing and underway mapping and must deliver a trip report after completion.
This is an informational notice describing the need for Rolls-Royce Solutions America to perform the adjustments and related technical work, with no Government Furnished Equipment required. Deliverables include a final report within three days of the period of performance and one day of underway testing, to be conducted at CGC JAMES’ pier in North Charleston, SC, during an early September 2025 window.
This is for informational purposes only. This has been awarded VIA JOTFOC TECHNICAL SERVICES TO CLEAN AND INSPECT PORT AND STARBORD SHAFT SEALS Background. JAMES has found both Port and Starboard Propeller Pitch to be programmed incorrectly. This causes engine speed to not match desired speed for the cutter and will not make full speed. Rolls Royce Solutions America is needed to adjust these settings and get underway to verify proper set points are correct. 1. Scope. Kongsberg certified Tech Rep to repair the port and starboard pitch mapping to the engine RPM Provide onsite troubleshooting and HP Mapping of controls systems, alongside MTU Engineer Provide a technical expertise to gain max speed for the cutter of 26kts. Disembark with Vessel for additional testing, troubleshooting, & Mapping while underway Provide a Trip report once completed. 2. GFE: NA 3. Tasks. The contractor shall provide technical expertise for the repair pitch and engine speed controls to the proper settings. 4. Delivery. The contractor shall provide a final report within 3 days of the contract period of performance. 5. Place of performance- CGC JAMES at the Pier in North Charleston South Carolina. Delivery address and provide 1 day of underway testing to ensure the settings are correct. CGC JAMES Attn: Engineering Officer 1050 Register St. North Charleston, SC 29405 6. Period of performance- 08 SEP 2025 10SEP 25 7. Points of Contact. USCG-SFLC-LRE PL Asset Management: CWO Matthew Temple, matthew.temple@uscg.mil, 510-460-8195 Engineering Officer LCDR Andrew Andrew.W.Moeller@uscg.mil
From Special Notice posted on Sep 04, 2025Notice history
1Details
Award Information
Not yet awarded
Agency
Place of Performance
USA