USCGC Hollyhock Davit repair 70Z08525Q0020749
Summary
AI-generated · Aug 24, 2025A Welin Lambie Dual Point Davit on CGC Hollyhock requires a Welin Lambie certified Tech-Rep to reevaluate and test the system after water intrusion, and to replace the adjustable elbow fitting that caused a major hydraulic leak due to a failed O-Ring, in order to recertify the system. The on-site work includes providing one senior field service technician for 10 hours on a single day, assisting with parts installation, conducting the davit assessment, and witnessing davit operations, with any discrepancies reported through the CFR process.
Contractor must provide qualified personnel, maintain professional conduct, avoid conflicts of interest, and secure base access by registering with the U.S. Coast Guard and providing valid ID ahead of the start date. The task is to be performed on-site at CGC Hollyhock in Baltimore, MD, for one day within the specified mid-period window, and includes supply and installation of required parts while on site.
This is for informational purposes only. This was awarded VIA JOTFOC due to urgency. STATEMENT OF WORK (SOW) BACKGROUND CGC Hollyhock recently had a discrepancy of water intrusion inside the cabinet of their Welin Lambie Dual Point Davit. The discrepancy required a replacement main inverter to correct the issues. However, the crew was unable to determine the root cause or potential of cascading issues from the casualty. CGC Hollyhock requires a Welin Lambie certified Tech-Rep to go through and reevaluate and test the system. In addition to recertifying the system, CTR must replace the adjustable elbow fitting outlined below which cause a major hydraulic leak due to a failed O-Ring. REFERENCE REQUIREMENTS PROPOSAL TO PROVIDE (1) SENIOR FIELD SERVICE TECHNICIAN WORKING (10) HOURS PER DAY FOR (1) DAY - TECH REP TO ASSIST WITH PARTS INSTALL, CONDUCT DAVIT ASSESMENT, AND WITNESS DAVIT OPERATIONS. ANY NOTED DISCREPANCIES WILL BE REPORTED VIA CFR PROCESS. SUPPLY AND INSTALL THE FOLLOWING PARTS WHILE ON SITE: 4.0 ADMINISTRATION. 4.1 CONTRACTOR PERSONELL 4.1.1 Qualified Personnel. The Contractor shall provide qualified personnel and subject matter experts to perform all required tasks specified in this SOW. 4.1.2 Employee Conduct. Contractor employees shall present a professional appearance, and their conduct shall not reflect discredit upon the U.S. Government, and any involved Departments or Agencies. Contractor employees shall comply with all applicable Government regulations, policies, and procedures (e.g., fire, safety, sanitation, environmental protection, security, off limits areas, wearing of parts of military uniforms, and possession of weapons) when visiting or working at Government facilities. 4.1.3 Conflict of Interest. The Contractor shall not employ any person who is an employee of the U.S. Government if that employment would, or would appear to cause, a conflict of interest. The Contractor shall take appropriate precautions as delineated in the Federal Acquisition Regulation (FAR) to preclude actual or apparent conflicts of interest. 4.1.4 Base Access U.S Coast Guard Yard requires registration for guest access from contractors. Contractor must provide a valid I.D and name to the USCG POC s no later than one week prior to the commencement of the contract to gain base access. 4.2 PERIOD OF PERFORMANCE. One day on site between 18JULY-01AUG 4.3 PLACE OF PERFORMANCE. CGC Hollyhock 2401 Hawkins Point Rd Baltimore, MD. Pier 1 5.0 USCG POC S CGC HOLLYHOCK 2401 Hawkins Point Rd Baltimore, MD 21226 POC Adam D. Barton, ENG4 Engineer Officer 571-607-5222 Email: Adam.D.Barton@uscg.mil Product Line Support: ENS Marcos Saldarriaga marcos.a.saldarriaga@uscg.mil 667-419-5729
From Special Notice posted on Jul 16, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance