UPS battery backup 12639526Q0042
Summary
AI-generated · Feb 07, 2026Install a 25 kW uninterruptible power supply (UPS) for the main server rack on the existing 60-amp circuit. Provide the Galaxy VS UPS 25kW at 208V with two internal 9Ah smart modular battery strings (expandable to four) and a Galaxy VS Maintenance Bypass cabinet (UL-listed). Include startup support (5x8) and ensure compatibility with configurations of 208V 10-40 kW or 208V 20-80 kW (or equivalent). An Emergency Power Off button must be included.
Work includes adding a UPS system to a server. Installation includes a 25kW UPS unit on one of the current 60-amp circuits for the main server rack. Equipment includes a Galaxy VS UPS 25kW 208V, 2 internal 9Ah smart modular battery strings, expandable to 4, Start-up 5x8, or equal, and Galaxy VS Maintenance Bypass cabinet, UL, Single-unit 10-40kW 208V, 20-80kW 480V, or equal. Also required is an Emergency Power Off button. Solicitation and attachment are posted below.
From Solicitation posted on Feb 06, 2026Work includes adding a UPS system to a server. Installation includes a 25kW UPS unit on one of the current 60-amp circuits for the main server rack. Equipment includes a Galaxy VS UPS 25kW 208V, 2 internal 9Ah smart modular battery strings, expandable to 4, Start-up 5x8, or equal, and Galaxy VS Maintenance Bypass cabinet, UL, Single-unit 10-40kW 208V, 20-80kW 480V, or equal. Also required is an Emergency Power Off button. Solicitation and attachment are posted below. Photos of room and equipment posted below.
From Solicitation posted on Feb 11, 2026Work includes adding a UPS system to a server. Installation includes a 25kW UPS unit on one of the current 60-amp circuits for the main server rack. Equipment includes a Galaxy VS UPS 25kW 208V, 2 internal 9Ah smart modular battery strings, expandable to 4, Start-up 5x8, or equal, and Galaxy VS Maintenance Bypass cabinet, UL, Single-unit 10-40kW 208V, 20-80kW 480V, or equal. Also required is an Emergency Power Off button. Solicitation and attachment are posted below. Photos of room and equipment posted below. RFI: Would you be able to tell me what the battery runtime requirement is for this opportunity? Response: Less than 5 min, main purpose is to run between power outage and when the generator will kick on, which should be less than 30 secs.
From Solicitation posted on Feb 17, 2026Work includes adding a UPS system to a server. Installation includes a 25kW UPS unit on one of the current 60-amp circuits for the main server rack. Equipment includes a Galaxy VS UPS 25kW 208V, 2 internal 9Ah smart modular battery strings, expandable to 4, Start-up 5x8, or equal, and Galaxy VS Maintenance Bypass cabinet, UL, Single-unit 10-40kW 208V, 20-80kW 480V, or equal. Also required is an Emergency Power Off button. Solicitation and attachment are posted below. Photos of room and equipment posted below. RFI: Would you be able to tell me what the battery runtime requirement is for this opportunity? Response: Less than 5 min, main purpose is to run between power outage and when the generator will kick on, which should be less than 30 secs. An amendment to postpone the closing date for quotes and RFIs and responses are posed below.
From Solicitation posted on Mar 06, 2026Notice history
4-
Solicitation Posted Feb 06, 2026
-
Solicitation LATEST Posted Mar 06, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Mar 09, 2026 → Mar 11, 2026