Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 4 notices 5 documents

UPS battery backup 12639526Q0042

Solicitation 12639526Q0042 Copied Notice ID f65a02c98c734bcd9f5abe14c2ea8fd0 Copied AGRICULTURE, DEPARTMENT OF — MRPBS MINNEAPOLIS MN
SAM.gov
Posted
Mar 06, 2026
Deadline
Mar 11, 2026
Set-aside
SBA
NAICS
238210
PSC
Y1JZ

Summary

AI-generated · Feb 07, 2026

Install a 25 kW uninterruptible power supply (UPS) for the main server rack on the existing 60-amp circuit. Provide the Galaxy VS UPS 25kW at 208V with two internal 9Ah smart modular battery strings (expandable to four) and a Galaxy VS Maintenance Bypass cabinet (UL-listed). Include startup support (5x8) and ensure compatibility with configurations of 208V 10-40 kW or 208V 20-80 kW (or equivalent). An Emergency Power Off button must be included.

Work includes adding a UPS system to a server. Installation includes a 25kW UPS unit on one of the current 60-amp circuits for the main server rack. Equipment includes a Galaxy VS UPS 25kW 208V, 2 internal 9Ah smart modular battery strings, expandable to 4, Start-up 5x8, or equal, and Galaxy VS Maintenance Bypass cabinet, UL, Single-unit 10-40kW 208V, 20-80kW 480V, or equal. Also required is an Emergency Power Off button. Solicitation and attachment are posted below.

From Solicitation posted on Feb 06, 2026

Work includes adding a UPS system to a server. Installation includes a 25kW UPS unit on one of the current 60-amp circuits for the main server rack. Equipment includes a Galaxy VS UPS 25kW 208V, 2 internal 9Ah smart modular battery strings, expandable to 4, Start-up 5x8, or equal, and Galaxy VS Maintenance Bypass cabinet, UL, Single-unit 10-40kW 208V, 20-80kW 480V, or equal. Also required is an Emergency Power Off button. Solicitation and attachment are posted below. Photos of room and equipment posted below.

From Solicitation posted on Feb 11, 2026

Work includes adding a UPS system to a server. Installation includes a 25kW UPS unit on one of the current 60-amp circuits for the main server rack. Equipment includes a Galaxy VS UPS 25kW 208V, 2 internal 9Ah smart modular battery strings, expandable to 4, Start-up 5x8, or equal, and Galaxy VS Maintenance Bypass cabinet, UL, Single-unit 10-40kW 208V, 20-80kW 480V, or equal. Also required is an Emergency Power Off button. Solicitation and attachment are posted below. Photos of room and equipment posted below. RFI: Would you be able to tell me what the battery runtime requirement is for this opportunity? Response: Less than 5 min, main purpose is to run between power outage and when the generator will kick on, which should be less than 30 secs.

From Solicitation posted on Feb 17, 2026

Work includes adding a UPS system to a server. Installation includes a 25kW UPS unit on one of the current 60-amp circuits for the main server rack. Equipment includes a Galaxy VS UPS 25kW 208V, 2 internal 9Ah smart modular battery strings, expandable to 4, Start-up 5x8, or equal, and Galaxy VS Maintenance Bypass cabinet, UL, Single-unit 10-40kW 208V, 20-80kW 480V, or equal. Also required is an Emergency Power Off button. Solicitation and attachment are posted below. Photos of room and equipment posted below. RFI: Would you be able to tell me what the battery runtime requirement is for this opportunity? Response: Less than 5 min, main purpose is to run between power outage and when the generator will kick on, which should be less than 30 secs. An amendment to postpone the closing date for quotes and RFIs and responses are posed below.

From Solicitation posted on Mar 06, 2026

Notice history

4
  1. Solicitation Posted Feb 06, 2026 View
  2. Solicitation Posted Feb 11, 2026
    • Description: Description was updated
  3. Solicitation Posted Feb 17, 2026
    • Description: Description was updated
  4. Solicitation LATEST Posted Mar 06, 2026
    • Description: Description was updated
    • Response Deadline: Mar 09, 2026Mar 11, 2026

Details

Solicitation number 12639526Q0042
Notice ID f65a02c98c734bcd9f5abe14c2ea8fd0
Notice type Solicitation
Product / Service (PSC) Y1JZ
NAICS 238210
Place of performance Fort Collins, Colorado
Archive date Mar 26, 2026

Award Information

Not yet awarded

Contacts

primary
Jim Roloff

Email

Phone

Agency

AGRICULTURE, DEPARTMENT OF
ANIMAL AND PLANT HEALTH INSPECTION SERVICE
MRPBS MINNEAPOLIS MN

Place of Performance

Fort Collins, Colorado 80521
USA

Dates

Posted Mar 06, 2026 5 months ago
Last Updated Aug 06, 2026 1 day ago
Due Mar 11, 2026 4 months ago