Tyndall AFB, Florida - HVAC and MCC Replacement GNFR-FC-TYN-26-26340
Summary
AI-generated · Jun 02, 2026Replacement of all HVAC equipment with a newly configured system, plus adding new equipment space to house the equipment and to comply with the latest UFCs. Some independent units will be consolidated into a centralized system once the new floor space is established. The control system for all BX and mall area equipment will use a new Siemens design (replacing existing Siemens and older components) and will report to the Tyndall Communications building via a fiber link.
The work is a one-year construction contract, funded in FY2026 and constructed in 2026–2027, with the building kept in operation as much as practicable during construction. Ceiling and interior repairs and possible minor structural modifications to accommodate the new units are expected, and those costs are included in the estimate. The entire system will be tested and balanced per the contract documents. To participate, review solicitation documents at the provided link; amendments will be posted on the site and must be acknowledged when submitting a proposal.
Solicitation Number: GNFR-FC-TYN-26-26340 Tyndall AFB, Florida - HVAC and MCC Replacement Project Number: 3784-26-000002 This project includes replacement of all HVAC equipment with a newly configured system, adding new equipment space to enable housing of new mechanical equipment with sufficient space to comply with latest UFCs. Certain independent units will be consolidated into new centralized system capacity once new floor space is established. The control system of all BX and mall area replaced equipment will be via new Siemens Design (replacing the existing Siemens and older components) and report to the Tyndall COMM building via fiber link. The construction is anticipated to be a one-year contract, to be awarded in FY2026, and constructed in 2026-2027 (Subject to the availability of funds), and the building must remain in operation as much as practicable during the construction period. There is anticipated to be ceiling and interior repairs associated with the project, along with potential minor structural modifications needed to accommodate the new units, and those costs are covered in the estimate. The whole system will be tested and balanced per the contract documents. In order to participate in this solicitation, please refer to the link provided below. All solicitation documents will be posted on our website. Any and all amendments will be posted on our website, and must be acknowledged, when submitting a proposal. https://odin.aafes.com/ConstructionSolicitations/
From Solicitation posted on Jun 01, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA