Solicitation Repair of MSGR Shower 19PA1026Q0001
Summary
AI-generated · Mar 27, 2026Repair the floor slope in nine shower stalls across nine bathrooms at the Marine Security Guard Quarters. The stalls were built without proper slope, causing water to spill out of the shower area and wet the bathroom floor, creating extra cleaning effort and a slip hazard. One stall has already been fixed as a test; eight stalls remain to be repaired.
The objective is to restore proper drainage so water stays within the shower area, keeping the bathroom floor dry and reducing maintenance and safety risks.
This project consists of repairing the floor slope in nine (9) shower stalls located in nine (9) bathrooms at the Marine Security Guard Quarters. These bathrooms were constructed without proper slope in the shower stalls, causing water to flow out of the shower area and wet the bathroom floor during use. This condition creates both an operational inconvenience, requiring additional cleaning effort, and a safety hazard due to slippery floors that could lead to falls. Bathroom shower stall already fixed as a test. Eight (8) out of nine (9) bathroom shower stalls are pending for repairs.
From Combined Synopsis/Solicitation posted on Mar 26, 2026Notice history
1-
Combined Synopsis/Solicitation LATEST Posted Mar 26, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
PRY