Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 3 notices 2 documents

Sodium Battery Installation for KABF COMM 20449 FA940125Q0023

Solicitation FA940125Q0023 Copied Notice ID c95b27e08970444f932b47380eca3660 Copied DEPT OF DEFENSE — FA9401 377 MSG PK
SAM.gov
Posted
Jun 24, 2025
Deadline
Jul 15, 2025
Set-aside
SBA
NAICS
335910
PSC
6140

Summary

AI-generated · Aug 23, 2025

Remove existing lead-acid batteries and install 40 sodium nickel battery modules for the communications building, with Ethernet remote monitoring capability. Provide additional electrical power infrastructure to support critical backup power from the batteries, including removal and disposal of existing power inverters, installation of two new 100-amp power inverters and two 70-amp inverters to replace the existing ones, and installation of 52 new locking overhead dual-power 20-amp outlets in the area of the new equipment. The contractor must supply all equipment, tools, materials, transportation, labor, supervision, management, and other incidentals per the attached Statement of Work.

Three records describe the same requirement; there is no change in scope or details between notices.

Remove and dispose of existing lead-acid batteries and the purchase and install 40 new sodium nickel battery modules for communication building. Provide Ethernet remote monitoring capabilities. Additional electrical power infrastructure, supporting critical backup power from the batteries, is to be provided and installed by the Contractor. This will consist of removal and disposal of the existing power invertors, installation of two new 100-amp power invertors and two 70-amp to replace the existing power invertors, and installation of 52 new locking overhead dual power 20-amp electric outlets within the area of the newly installed equipment. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in the attached Statement of Work.

From Combined Synopsis/Solicitation posted on Jun 24, 2025

Remove and dispose of existing lead-acid batteries and the purchase and install 40 new sodium nickel battery modules for communication building. Provide Ethernet remote monitoring capabilities. Additional electrical power infrastructure, supporting critical backup power from the batteries, is to be provided and installed by the Contractor. This will consist of removal and disposal of the existing power invertors, installation of two new 100-amp power invertors and two 70-amp to replace the existing power invertors, and installation of 52 new locking overhead dual power 20-amp electric outlets within the area of the newly installed equipment. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in the attached Statement of Work.

From Combined Synopsis/Solicitation posted on Jul 10, 2025

Remove and dispose of existing lead-acid batteries and the purchase and install 40 new sodium nickel battery modules for communication building. Provide Ethernet remote monitoring capabilities. Additional electrical power infrastructure, supporting critical backup power from the batteries, is to be provided and installed by the Contractor. This will consist of removal and disposal of the existing power invertors, installation of two new 100-amp power invertors and two 70-amp to replace the existing power invertors, and installation of 52 new locking overhead dual power 20-amp electric outlets within the area of the newly installed equipment. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in the attached Statement of Work.

From Combined Synopsis/Solicitation posted on Jul 14, 2025

Notice history

3
  1. Combined Synopsis/Solicitation Posted Jun 24, 2025
  2. Combined Synopsis/Solicitation Posted Jul 10, 2025
    No changes from previous notice
  3. Combined Synopsis/Solicitation LATEST Posted Jul 14, 2025
    • Response Deadline: Jul 15, 2025Jul 24, 2025

Details

Solicitation number FA940125Q0023
Notice ID c95b27e08970444f932b47380eca3660
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) 6140
NAICS 335910
Place of performance Holloman AFB, New Mexico
Archive date Jul 30, 2025

Award Information

Not yet awarded

Contacts

primary
Austin Swain

Email

secondary
Kelly Scott

Email

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR FORCE GLOBAL STRIKE COMMAND
FA9401 377 MSG PK

Place of Performance

Holloman AFB, New Mexico 87117
USA

Dates

Posted Jun 24, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 15, 2025 1 year ago