Sodium Battery Installation for KABF COMM 20449 FA940125Q0023
Summary
AI-generated · Aug 23, 2025Remove existing lead-acid batteries and install 40 sodium nickel battery modules for the communications building, with Ethernet remote monitoring capability. Provide additional electrical power infrastructure to support critical backup power from the batteries, including removal and disposal of existing power inverters, installation of two new 100-amp power inverters and two 70-amp inverters to replace the existing ones, and installation of 52 new locking overhead dual-power 20-amp outlets in the area of the new equipment. The contractor must supply all equipment, tools, materials, transportation, labor, supervision, management, and other incidentals per the attached Statement of Work.
Three records describe the same requirement; there is no change in scope or details between notices.
Remove and dispose of existing lead-acid batteries and the purchase and install 40 new sodium nickel battery modules for communication building. Provide Ethernet remote monitoring capabilities. Additional electrical power infrastructure, supporting critical backup power from the batteries, is to be provided and installed by the Contractor. This will consist of removal and disposal of the existing power invertors, installation of two new 100-amp power invertors and two 70-amp to replace the existing power invertors, and installation of 52 new locking overhead dual power 20-amp electric outlets within the area of the newly installed equipment. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in the attached Statement of Work.
From Combined Synopsis/Solicitation posted on Jun 24, 2025Remove and dispose of existing lead-acid batteries and the purchase and install 40 new sodium nickel battery modules for communication building. Provide Ethernet remote monitoring capabilities. Additional electrical power infrastructure, supporting critical backup power from the batteries, is to be provided and installed by the Contractor. This will consist of removal and disposal of the existing power invertors, installation of two new 100-amp power invertors and two 70-amp to replace the existing power invertors, and installation of 52 new locking overhead dual power 20-amp electric outlets within the area of the newly installed equipment. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in the attached Statement of Work.
From Combined Synopsis/Solicitation posted on Jul 10, 2025Remove and dispose of existing lead-acid batteries and the purchase and install 40 new sodium nickel battery modules for communication building. Provide Ethernet remote monitoring capabilities. Additional electrical power infrastructure, supporting critical backup power from the batteries, is to be provided and installed by the Contractor. This will consist of removal and disposal of the existing power invertors, installation of two new 100-amp power invertors and two 70-amp to replace the existing power invertors, and installation of 52 new locking overhead dual power 20-amp electric outlets within the area of the newly installed equipment. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in the attached Statement of Work.
From Combined Synopsis/Solicitation posted on Jul 14, 2025Notice history
3-
-
Combined Synopsis/Solicitation Posted Jul 10, 2025No changes from previous notice
-
Combined Synopsis/Solicitation LATEST Posted Jul 14, 2025View changes (1)
- Response Deadline: Jul 15, 2025 → Jul 24, 2025
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA