Service Contract Correct Suicide Prevention Deficiencies, PG1 and PG2 36C26226C0151
Summary
AI-generated · May 30, 2026Perform a design/build project to design, furnish, install, and remove fall-protection netting and metal fencing at specified areas of the Jennifer Moreno VA Medical Center (PG-1 Level 2 north end and PG-2 Level 1 center west end). The effort includes design shop drawings and construction of a metal suicide-prevention wall (including concrete anchor bolts to match existing hardware, new metal framing, and paneling), attachment of anti-climb and safety features at column tops, and relocation of a chain-link fence pole at the NE corner. Demolish and patch existing railing/guardrail as shown, install new wedge anchor eye bolts with third-party pull testing, and install approximately 177 x 10 4 safety netting in the light well. Fabricate and install a new metal railing with galvanized framing and stainless mesh to match the existing rail, and complete cleanup and demobilization. The suicide-prevention netting installation involves removing existing fencing, repairing as needed, and attaching netting per specification, using prefabricated framing and stainless components, with final connections welded on site.
Key requirements include submitting only two design shop drawings (50% and 100%), posting permits per VASD Safety Office and Infection Control Department, and notifying the COR and CO of after-hours activity, with a VA representative always on site. An independent third-party reviewer licensed in California (PE) is mandatory. Work may occur after hours or on weekends, using a two-person extended boom lift and reach forklift with jib. The project adheres to the Master Construction Specification guidance, and the design, materials, heights, and form are provided by the VASD COR.
This requirement is for construction services to perform a Design/Build service that includes the installation of fall netting at PG-2 Level 1, and metal fencing at PG-1 north end, Level 2. Area of work: The project work area is at PG-1 Level 2 north end, and PG-2 Level 1 at center west end. The construction will take place on government owned land at the Jennifer Moreno VA Medical Center. The Contractor will need to provide a cost proposal based on the Scope of Work. Project Requirements: The scope of work for this project consists of designing, furnishing, installing, and removing the following: The design shop drawings and construction of a metal suicide prevention wall: Concrete Anchor Bolts for plate attachments (to match existing plate attachment specifications) Fabrication of new metal wall framing to match existing in form, material and color Attachment of specified metal paneling to framework Installation of angled metal panel stepping prevention elements at column tops for climbing prevention Existing chain-link fence pole relocation at NE corner Specifically, Includes: Demolish approximately 100 linear feet existing metal railing at the north upper level indicated on sheet A-1.1 Demolish approximately 160 linear feet of existing metal guardrail and embedded post anchors at the light well area indicated on sheet A-1.0 Patch concrete walls at areas of guard rail demolition to match existing finish. Install new wedge anchor eye bolts @ 4 off center indicated on plans Provide 3rd party pull testing for eye bolts installation Install new 177 x10 4 safety netting in light well Fabricate and install new metal railing with 2 x2 galvanized tube steel railing with stainless steel metal corrugated mesh to match existing rail on PG-1 Clean up and demobilize The installation of suicide prevention fall netting: Removal of existing metal fencing and repair. Installation of new wedge anchor eye bolts Provide suicide prevention netting per specification Attachment of new safety netting Specifically, Includes: 18 Gauge Stainless Steel T304 2B Perforated 3/8 Dia. on 1/2 Staggered Center panels mounted on 5 prefabricated sections of fencing frames from; 1.25" x 2" x 2" pre-galvanized square tube, 1/2" x 6" x 18" galvanized mounting plates anchored onto concrete to match existing fencing and drawings provided for parking structure. We will use a combination of a 2-man extended boom lift and reach forklift with jib to complete the work. After fencing frame is erected and anchored a welder will complete final points of connection. The corrugated panels will then be installed by being fastened to galvanized frame and supported by stainless steel J-Mold. We understand some of this work may have to be completed after ours and/or on weekends. The general design will need to include approved heights, materials, colors, and form, which will be provided by the VASD COR Representative. Only two design shop drawings submissions (50 and 100) % are required. Need to post permits in accordance with VASD Safety Office and Infection Control Department. Notify the COR and cc the CO of any activity outside the working hours. A VA representative should always be present. An independent third-party reviewer (PE CA licensed) is mandatory. The Master Construction Specification site is https://www.cfm.va.gov/til/spec.asp
From Award Notice posted on May 29, 2026Notice history
1-
Award Notice LATEST Posted May 29, 2026
Details
Award Information
Award Notices
Posted: May 29, 2026
This requirement is for construction services to perform a Design/Build service that includes the installation of fall netting at PG-2 Level 1, and metal fencing at PG-1 north end, Level 2. Area of work: The project work area is at PG-1 Level 2 north end, and PG-2 Level 1 at center west end. The con...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| JT West Construction, Inc. | US5XJ5B9Z656 | 11M25 | Menifee, CA |
Contacts
Agency
Place of Performance
USA