SCMG Conference Room AV Upgrade F3YCAB5169A001
Summary
AI-generated · Aug 24, 2025Design, procurement, and installation of a fully integrated conference room AV system upgrade, to integrate with existing government-furnished equipment (displays, cameras, and VTC). Includes two large-format displays, two cameras, high-quality ceiling-mounted microphones, four full-range ceiling speakers, cabling, AV connections for two NIPR GFE PCs, an integrated control system with a touch panel, a standard equipment rack to fit existing furniture, and a Matrix Switch, Audio Amplifier/Mixer, and Surge Protector; configuration, integration, and testing of all components; system compatible with multiple classified and unclassified networks; on-site training and ongoing support; all equipment must be TAA compliant; training must be comprehensive with potential post-training assessments. Installation period is 90 days; evaluation will be based on the lowest price technically acceptable on each item independently, with all items and quantities in the LOM required to be quoted; quotes not meeting the LOM will be ineligible; SAM registration required; a site visit by an Audio Video specialist is required, with RSVP details provided in the notice.
Amendment updated the RFQ due date and notes that vendor Q&As will be posted; all other requirements remain the same.
Contract Line Items (CLINs): Note: All CLINs are Firm Fixed Price (FFP) 0001 Design, procurement, and installation of a fully integrated audio-visual system upgrade for one conference room, including integration with existing government-furnished equipment (GFE) such as displays, cameras, and VTC equipment. Including but not limited to the installation of: two (2) large-format displays; two (2) cameras; high quality ceiling-mounted microphones; four (4) full-range ceiling-mounted speakers; necessary cabling; A/V connections for two (2) NIPR GFE PCs; integrated control system with touch panel; standard equipment rack to fit existing furniture; and Matrix Switch, Audio Amplifier/Mixer, and Surge Protector. Configuration, integration, and testing of all components. The system must be compatible with multiple classified and unclassified networks. Services also include on-site training and ongoing support. All equipment provided must be TAA compliant. Training Effectiveness: Training provided to government personnel must be comprehensive and effective, ensuring users can confidently operate and maintain the AV system. Consider requiring post-training assessments. 0002 Installation Period of performance is 90 Days ARO Evaluation - Award will be based upon the lowest price technically acceptable (LPTA) evaluation criteria on each item independently. All items and quantities in the LOM must be quoted. If Quotes are not in accordance with the attached LOM and do not meet the requirement, the quote will be considered ineligible for award. The offeror must be registered in SAM to be eligible for award. A site visit will be required from an Audio Video specialist. The site visit will be held on 30 July 2025 at 10:00 AM CDT (Central Daylight Time). The POC for the site visit is Jessica Ochs and can be reached at jessica.ochs@us.af.mil or 757-298-9376. RSVP is required NLT 12:00 PM CDT on 29 July 2025. If you require a gate pass, please inform the POC at the time of RSVP.
From Combined Synopsis/Solicitation posted on Jul 21, 2025***Amended to update RFQ due date to Friday, 15 August 2025 at 2:00 PM CDT. Vendor Q&As will be posted as soon as they are available.*** Contract Line Items (CLINs): Note: All CLINs are Firm Fixed Price (FFP) 0001 Design, procurement, and installation of a fully integrated audio-visual system upgrade for one conference room, including integration with existing government-furnished equipment (GFE) such as displays, cameras, and VTC equipment. Including but not limited to the installation of: two (2) large-format displays; two (2) cameras; high quality ceiling-mounted microphones; four (4) full-range ceiling-mounted speakers; necessary cabling; A/V connections for two (2) NIPR GFE PCs; integrated control system with touch panel; standard equipment rack to fit existing furniture; and Matrix Switch, Audio Amplifier/Mixer, and Surge Protector. Configuration, integration, and testing of all components. The system must be compatible with multiple classified and unclassified networks. Services also include on-site training and ongoing support. All equipment provided must be TAA compliant. Training Effectiveness: Training provided to government personnel must be comprehensive and effective, ensuring users can confidently operate and maintain the AV system. Consider requiring post-training assessments. 0002 Installation Period of performance is 90 Days ARO Evaluation - Award will be based upon the lowest price technically acceptable (LPTA) evaluation criteria on each item independently. All items and quantities in the LOM must be quoted. If Quotes are not in accordance with the attached LOM and do not meet the requirement, the quote will be considered ineligible for award. The offeror must be registered in SAM to be eligible for award. A site visit will be required from an Audio Video specialist. The site visit will be held on 30 July 2025 at 10:00 AM CDT (Central Daylight Time). The POC for the site visit is Jessica Ochs and can be reached at jessica.ochs@us.af.mil or 757-298-9376. RSVP is required NLT 12:00 PM CDT on 29 July 2025. If you require a gate pass, please inform the POC at the time of RSVP.
From Combined Synopsis/Solicitation posted on Aug 04, 2025Contract Line Items (CLINs): Note: All CLINs are Firm Fixed Price (FFP) 0001 Design, procurement, and installation of a fully integrated audio-visual system upgrade for one conference room, including integration with existing government-furnished equipment (GFE) such as displays, cameras, and VTC equipment. Including but not limited to the installation of: two (2) large-format displays; two (2) cameras; high quality ceiling-mounted microphones; four (4) full-range ceiling-mounted speakers; necessary cabling; A/V connections for two (2) NIPR GFE PCs; integrated control system with touch panel; standard equipment rack to fit existing furniture; and Matrix Switch, Audio Amplifier/Mixer, and Surge Protector. Configuration, integration, and testing of all components. The system must be compatible with multiple classified and unclassified networks. Services also include on-site training and ongoing support. All equipment provided must be TAA compliant. Training Effectiveness: Training provided to government personnel must be comprehensive and effective, ensuring users can confidently operate and maintain the AV system. Consider requiring post-training assessments. 0002 Installation
From Award Notice posted on Sep 29, 2025Notice history
3-
-
Combined Synopsis/Solicitation Posted Aug 04, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 06, 2025 → Aug 15, 2025
-
Award Notice LATEST Posted Sep 29, 2025
Details
Award Information
Award Notices
Posted: Sep 29, 2025
Contract Line Items (CLINs): Note: All CLINs are Firm Fixed Price (FFP) 0001 Design, procurement, and installation of a fully integrated audio-visual system upgrade for one conference room, including integration with existing government-furnished equipment (GFE) such as displays, cameras, and VTC eq...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| GDL SOLUTIONS, INC. | JKVJN8W1EBN5 | 87NB9 | Centreville, VA |
Contacts
Phone
Agency
Place of Performance
USA