San Luis Obispo (SBP) ATCT Roof Replacement 00SBP
Summary
AI-generated · Apr 03, 2026Furnish all labor, materials, equipment, supervision, and related services to replace the roof on the SBP ATCT cab roof (approximately 361 sq ft). The scope includes removing and disposing of the existing roofing system, providing and installing a galvanized roof hatch guardrail kit with a self-closing gate to meet code, removing and replacing all roof drains, removing and replacing the roof hatch, relocating the grounding counterpoise from the roof to the parapet wall, and daily debris removal per local and state requirements. Drawings are for reference only.
The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached drawings are for reference only, Approximate quantities ATCT Cab roof 361 sq. ft. The scope of work includes but not limited to: Remove and dispose of existing roofing system from the SBP ATCT cab roof. Provide and install roof hatch guardrail kit with self closing gate, galvanized finish. to meet code compliance. Remove and replace all roof drains. Remove and replace roof hatch Remove and relocate grounding counterpoise from roof to parapet wall. Remove debris and trash generated from work and dispose of the debris per local and state requirements, daily.
From Solicitation posted on Apr 02, 2026The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached drawings are for reference only, Approximate quantities ATCT Cab roof 361 sq. ft. The scope of work includes but not limited to: Remove and dispose of existing roofing system from the SBP ATCT cab roof. Provide and install roof hatch guardrail kit with self closing gate, galvanized finish. to meet code compliance. Remove and replace all roof drains. Remove and replace roof hatch Remove and relocate grounding counterpoise from roof to parapet wall. Remove debris and trash generated from work and dispose of the debris per local and state requirements, daily.
From Solicitation posted on Apr 06, 2026The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached drawings are for reference only, Approximate quantities ATCT Cab roof 361 sq. ft. The scope of work includes but not limited to: Remove and dispose of existing roofing system from the SBP ATCT cab roof. Provide and install roof hatch guardrail kit with self closing gate, galvanized finish. to meet code compliance. Remove and replace all roof drains. Remove and replace roof hatch Remove and relocate grounding counterpoise from roof to parapet wall. Remove debris and trash generated from work and dispose of the debris per local and state requirements, daily.
From Solicitation posted on Apr 20, 2026The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached drawings are for reference only, Approximate quantities ATCT Cab roof 361 sq. ft. The scope of work includes but not limited to: Remove and dispose of existing roofing system from the SBP ATCT cab roof. Provide and install roof hatch guardrail kit with self closing gate, galvanized finish. to meet code compliance. Remove and replace all roof drains. Remove and replace roof hatch Remove and relocate grounding counterpoise from roof to parapet wall. Remove debris and trash generated from work and dispose of the debris per local and state requirements, daily.
From Solicitation posted on May 01, 2026The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached drawings are for reference only, Approximate quantities ATCT Cab roof 361 sq. ft. The scope of work includes but not limited to: Remove and dispose of existing roofing system from the SBP ATCT cab roof. Provide and install roof hatch guardrail kit with self closing gate, galvanized finish. to meet code compliance. Remove and replace all roof drains. Remove and replace roof hatch Remove and relocate grounding counterpoise from roof to parapet wall. Remove debris and trash generated from work and dispose of the debris per local and state requirements, daily.
From Solicitation posted on May 31, 2026Notice history
5-
Solicitation Posted Apr 02, 2026
-
Solicitation Posted Apr 06, 2026No changes from previous notice
-
Solicitation Posted Apr 20, 2026No changes from previous notice
-
Solicitation LATEST Posted May 31, 2026View changes (1)
- Response Deadline: May 11, 2026 → Jun 15, 2026
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA