Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 5 notices 12 documents

San Luis Obispo (SBP) ATCT Roof Replacement 00SBP

Solicitation 00SBP Copied Notice ID 86c1b85d3f7e44719c165eb30a284f4b Copied TRANSPORTATION, DEPARTMENT OF — 697DCK REGIONAL ACQUISITIONS SVCS
SAM.gov
Posted
May 31, 2026
Deadline
Jun 15, 2026
Set-aside
SBA
NAICS
238160
PSC
Y1BA

Summary

AI-generated · Apr 03, 2026

Furnish all labor, materials, equipment, supervision, and related services to replace the roof on the SBP ATCT cab roof (approximately 361 sq ft). The scope includes removing and disposing of the existing roofing system, providing and installing a galvanized roof hatch guardrail kit with a self-closing gate to meet code, removing and replacing all roof drains, removing and replacing the roof hatch, relocating the grounding counterpoise from the roof to the parapet wall, and daily debris removal per local and state requirements. Drawings are for reference only.

The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached drawings are for reference only, Approximate quantities ATCT Cab roof 361 sq. ft. The scope of work includes but not limited to: Remove and dispose of existing roofing system from the SBP ATCT cab roof. Provide and install roof hatch guardrail kit with self closing gate, galvanized finish. to meet code compliance. Remove and replace all roof drains. Remove and replace roof hatch Remove and relocate grounding counterpoise from roof to parapet wall. Remove debris and trash generated from work and dispose of the debris per local and state requirements, daily.

From Solicitation posted on Apr 02, 2026

The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached drawings are for reference only, Approximate quantities ATCT Cab roof 361 sq. ft. The scope of work includes but not limited to: Remove and dispose of existing roofing system from the SBP ATCT cab roof. Provide and install roof hatch guardrail kit with self closing gate, galvanized finish. to meet code compliance. Remove and replace all roof drains. Remove and replace roof hatch Remove and relocate grounding counterpoise from roof to parapet wall. Remove debris and trash generated from work and dispose of the debris per local and state requirements, daily.

From Solicitation posted on Apr 06, 2026

The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached drawings are for reference only, Approximate quantities ATCT Cab roof 361 sq. ft. The scope of work includes but not limited to: Remove and dispose of existing roofing system from the SBP ATCT cab roof. Provide and install roof hatch guardrail kit with self closing gate, galvanized finish. to meet code compliance. Remove and replace all roof drains. Remove and replace roof hatch Remove and relocate grounding counterpoise from roof to parapet wall. Remove debris and trash generated from work and dispose of the debris per local and state requirements, daily.

From Solicitation posted on Apr 20, 2026

The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached drawings are for reference only, Approximate quantities ATCT Cab roof 361 sq. ft. The scope of work includes but not limited to: Remove and dispose of existing roofing system from the SBP ATCT cab roof. Provide and install roof hatch guardrail kit with self closing gate, galvanized finish. to meet code compliance. Remove and replace all roof drains. Remove and replace roof hatch Remove and relocate grounding counterpoise from roof to parapet wall. Remove debris and trash generated from work and dispose of the debris per local and state requirements, daily.

From Solicitation posted on May 01, 2026

The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached drawings are for reference only, Approximate quantities ATCT Cab roof 361 sq. ft. The scope of work includes but not limited to: Remove and dispose of existing roofing system from the SBP ATCT cab roof. Provide and install roof hatch guardrail kit with self closing gate, galvanized finish. to meet code compliance. Remove and replace all roof drains. Remove and replace roof hatch Remove and relocate grounding counterpoise from roof to parapet wall. Remove debris and trash generated from work and dispose of the debris per local and state requirements, daily.

From Solicitation posted on May 31, 2026

Notice history

5
  1. Solicitation Posted Apr 02, 2026 View
  2. Solicitation Posted Apr 06, 2026
    No changes from previous notice
  3. Solicitation Posted Apr 20, 2026
    No changes from previous notice
  4. Solicitation Posted May 01, 2026
    • Response Deadline: May 04, 2026May 11, 2026
  5. Solicitation LATEST Posted May 31, 2026
    • Response Deadline: May 11, 2026Jun 15, 2026

Details

Solicitation number 00SBP
Notice ID 86c1b85d3f7e44719c165eb30a284f4b
Notice type Solicitation
Product / Service (PSC) Y1BA
NAICS 238160
Place of performance San Luis Obispo, California
Archive date Jun 30, 2026

Award Information

Not yet awarded

Contacts

primary
Rodgers Cox

Email

Agency

TRANSPORTATION, DEPARTMENT OF
FEDERAL AVIATION ADMINISTRATION
697DCK REGIONAL ACQUISITIONS SVCS

Place of Performance

San Luis Obispo, California 93401
USA

Dates

Posted May 31, 2026 2 months ago
Last Updated Aug 06, 2026 1 day ago
Due Jun 15, 2026 1 month ago