S208--SB SET ASIDE | 402-25-3-4836-0065: Wood Chipping (VA-25-00051988) 36C24125Q0494
Summary
AI-generated · Aug 24, 2025Chip all brush, limbs, and fallen trees at the North Gate Road site, including material larger than 55 inches in diameter, with chipped material left on-site as mulch. Mulch must be uniform in size suitable for landscaping (approximately 2–4 pieces per use). Provide all labor, transportation, materials, engineering, and equipment; use industry-standard heavy equipment (e.g., excavator, dozer, skid steer, trucks, woodchipper) and hand tools, with well-maintained gear. The contractor must furnish all supplies and equipment (no government-furnished facilities). Coordinate work with the onsite manager to avoid disrupting patient care; personnel must report to the VA Maine Medical Center onsite manager daily and provide a summary of accomplishments before departing. Work hours are 07:00–15:30, Monday through Friday (holidays excluded); establish project duration with the onsite manager and complete a final walkthrough inspection after completion. An Appendix A map shows the site and material piles.
New details in this solicitation include a formal requirement to photograph and provide descriptions of all equipment to be used, a defined scope that includes material over 55 inches in diameter, and explicit daily reporting and final inspection requirements, with the work location and expectations outlined in Appendix A. This follows a prior presolicitation but establishes the full Performance Work Statement and site-management coordination for the project.
Togus Wood Chipping
From Presolicitation posted on Jul 09, 2025Page 2 of 2 Performance Work Statement Description of Service. Contractor to furnish all labor, transportation, materials, engineering, and equipment to perform wood & brush chipping services at North Gate RD site. The period of performance for this PWS will be August 11, 2025 through November 28, 2025. See map for outlined requirements (Appendix A). Scope of Work. Chip all brush, limbs and fallen trees to include material over 55 in diameter staged in the work site. Chipped material to be left in piles on site to be used for usable mulch. Mulch should be uniform in size with approximately 2-4 pieces to be used for landscape. The contractor shall use industry standard means to include the use of, but not limited to, heavy equipment (excavator, dozer, skid steer, trucks, woodchipper, etc.) and hand-held equipment (chain saws, grinders, handheld tools, etc.) to perform wood & brush chipping services. Equipment must be well-maintained to minimize breakdowns and delays. To be considered, Contractor must provide picture and full description of their equipment to be used for this contract. All work is to be done in a workman like manner, according to standard practices. Contractor will furnish all equipment and personnel. Work of the Contractor is to be coordinated with the onsite manager to prevent conflicts with the treatment of patients and the functioning of the facility. The contractor personnel must report to VA Maine Medical Center onsite manager prior to beginning work for each day and shall report back to onsite manager what they accomplished during the day before leaving the Medical Center grounds. Government Furnished Equipment and Property. The Government will not furnish any facilities or equipment for any work that needs to be accomplished in this Performance Work Statement. The contractor shall furnish all supplies needed to perform this contract according to all its terms. All equipment and employees will be staged in a location that does not impede traffic, construction work, nor interfere with patients or employees. Hours of Operation and Timeline: Working hours for the contractor shall normally be between the hours of 0700-1530 Monday through Friday, excluding holidays. Contractor will work with VA onsite manager to provide project duration with the estimated start date and completion date. A final walkthrough by VA onsite manager inspection will take place when the job is complete. Appendix A. Map of site location and piles of material to be chipped.
From Solicitation posted on Jul 09, 2025Wood Chipping
From Solicitation posted on Jul 24, 2025Notice history
3-
-
Solicitation Posted Jul 09, 2025View changes (4)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Jul 23, 2025 → Jul 22, 2025
- Set-Aside: Total Small Business Set-Aside (FAR 19.5) → None
-
Solicitation LATEST Posted Jul 24, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Jul 22, 2025 → Aug 08, 2025
Details
Award Information
Contacts
Contract Specialist