Replacement of Hydraulic System for Penstock #5 191BWC25B0003

Solicitation 191BWC25B0003 Copied Notice ID 1b12b401ad6d4672b6604d77747cad73 Copied INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO — INTERNAT BOUNDARY AND WATER COMM
SAM.gov
Posted
Oct 03, 2025
Deadline
No deadline
Set-aside
None
NAICS
237990
PSC
Y1KA

Summary

AI-generated · Aug 24, 2025

Replace the hydraulic system for Penstock #5 at Amistad Dam to restore full operation. The work includes inspecting the system, replacing the hydraulic components, site preparation, debris and construction-waste disposal, quality-control testing, and, if awarded, manufacturing or installing a new penstock bulkhead. Site constraints require work to occur only 7:00 a.m.–3:30 p.m., Monday–Friday (holidays closed); only one bulkhead can be serviced at a time and design inspections must be coordinated with the Amistad Field Office AOM through the COR; the contractor must provide a crane and a certified operator to relocate the bulkhead (bulkhead about 14.3 ft wide by 24.6 ft tall, weight ~33,000 lb). Access is via Texas Spur 349 with an HS-20 bridge rating; embankment crest road load capacity is 70,000 lb; port of entry hours are 10:00 a.m.–6:00 p.m. (subject to change); workers must have reentry documentation. The contract is firm-fixed-price and expected to be completed within 485 calendar days after notice to proceed (365 days for construction and 120 days for closeout), with project magnitude estimated between $1 million and $5 million.

Changes since the prior notices include an extension of the offer due date, incorporation of answers to questions into the technical specifications, and confirmation that a site visit will be listed in the solicitation.

NOTE: Answers to questions received incorporated into attached Technical Specifications 191BWC25B0003_Penstock_5_Specs_20250624. The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the replacement of the hydraulic system for Penstock #5 in Amistad Dam. This penstock has not been functional in several years. The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality. The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead. The following site constraints apply: The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours. USIBWC facilities, including the dam, are closed during all Federal Holidays. There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing so design inspections must be coordinated with Amistad Field Office AOM through the COR. Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane an certified operator to perform the relocation of the bulkhead. Several relocations may be required. The bulkhead is approximately 14.3 feet wide by 24.6 feet tall. The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons). Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds. Workers must pass through the port of entry to access the worksite. The port of entry is open from 10:00 a.m. to 6:00 p.m. DHS may change these hours without notice. If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager. Workers crossing through the port of entry need to have proper documentation for reentry to the United States. Per FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000. The work is located in Val Verde County, Texas. A site visit date will be listed in the Solicitation. The work will be performed under NAICS Code 237990. The Contract will be firm-fixed price. All work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed. Three sixty-five (365) calendar days are anticipated for construction. The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction. The time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. The time stated for completion shall include final cleanup of the premises. This Solicitation will be issued pursuant to FAR Part 14. All responsible sources must submit a bid to be considered by the Agency. Please see document named SBU Document Notice for information in receiving additional documentation.

From Solicitation posted on Jun 25, 2025

NOTE: Date offers due is extended to July 9, 2025, 3 PM MDT. ----------------------------------------------------------- NOTE: Answers to questions received incorporated into attached Technical Specifications 191BWC25B0003_Penstock_5_Specs_20250624. The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the replacement of the hydraulic system for Penstock #5 in Amistad Dam. This penstock has not been functional in several years. The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality. The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead. The following site constraints apply: The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours. USIBWC facilities, including the dam, are closed during all Federal Holidays. There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing so design inspections must be coordinated with Amistad Field Office AOM through the COR. Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane an certified operator to perform the relocation of the bulkhead. Several relocations may be required. The bulkhead is approximately 14.3 feet wide by 24.6 feet tall. The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons). Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds. Workers must pass through the port of entry to access the worksite. The port of entry is open from 10:00 a.m. to 6:00 p.m. DHS may change these hours without notice. If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager. Workers crossing through the port of entry need to have proper documentation for reentry to the United States. Per FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000. The work is located in Val Verde County, Texas. A site visit date will be listed in the Solicitation. The work will be performed under NAICS Code 237990. The Contract will be firm-fixed price. All work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed. Three sixty-five (365) calendar days are anticipated for construction. The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction. The time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. The time stated for completion shall include final cleanup of the premises. This Solicitation will be issued pursuant to FAR Part 14. All responsible sources must submit a bid to be considered by the Agency. Please see document named SBU Document Notice for information in receiving additional documentation.

From Solicitation posted on Jul 02, 2025

NOTE: Date offers due is extended to July 9, 2025, 3 PM MDT. ----------------------------------------------------------- NOTE: Answers to questions received incorporated into attached Technical Specifications 191BWC25B0003_Penstock_5_Specs_20250624. The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the replacement of the hydraulic system for Penstock #5 in Amistad Dam. This penstock has not been functional in several years. The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality. The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead. The following site constraints apply: The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours. USIBWC facilities, including the dam, are closed during all Federal Holidays. There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing so design inspections must be coordinated with Amistad Field Office AOM through the COR. Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane an certified operator to perform the relocation of the bulkhead. Several relocations may be required. The bulkhead is approximately 14.3 feet wide by 24.6 feet tall. The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons). Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds. Workers must pass through the port of entry to access the worksite. The port of entry is open from 10:00 a.m. to 6:00 p.m. DHS may change these hours without notice. If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager. Workers crossing through the port of entry need to have proper documentation for reentry to the United States. Per FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000. The work is located in Val Verde County, Texas. A site visit date will be listed in the Solicitation. The work will be performed under NAICS Code 237990. The Contract will be firm-fixed price. All work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed. Three sixty-five (365) calendar days are anticipated for construction. The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction. The time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. The time stated for completion shall include final cleanup of the premises. This Solicitation will be issued pursuant to FAR Part 14. All responsible sources must submit a bid to be considered by the Agency. Please see document named SBU Document Notice for information in receiving additional documentation.

From Solicitation posted on Jul 03, 2025

Award was made to TEXAS ELECTRICAL & TESTING SERVICES LLC on 9/29/2025 for $2,589,000.00.

From Award Notice posted on Oct 03, 2025

Notice history

4
  1. Solicitation Posted Jun 25, 2025 View
  2. Solicitation Posted Jul 02, 2025
    • Description: Description was updated
    • Response Deadline: Jul 02, 2025Jul 09, 2025
  3. Solicitation Posted Jul 03, 2025
    No changes from previous notice
  4. Award Notice LATEST Posted Oct 03, 2025

Details

Solicitation number 191BWC25B0003
Notice ID 1b12b401ad6d4672b6604d77747cad73
Award number 191BWC25C0088
Notice type Award Notice
Product / Service (PSC) Y1KA
NAICS 237990
Place of performance Del Rio, Texas
Archive date Oct 14, 2025

Award Information

Awardee
1
Total Awarded
$2,589,000.00
Award Date
Sep 29, 2025

Award Notices

Replacement of Hydraulic System for Penstock #5 View Notice

Posted: Oct 03, 2025

Award was made to TEXAS ELECTRICAL & TESTING SERVICES LLC on 9/29/2025 for $2,589,000.00.

Awardees

Company Name UEI CAGE Code Location
TEXAS ELECTRICAL & TESTING SERVICES LLC EJUMYCUW6RE5 7W8N4 Del Rio, TX

Documents

No files available

View on SAM.gov

Contacts

primary
Adrian Knights

Email

Phone

secondary
Seone Michael Jones

Email

Agency

INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
INTERNAT BOUNDARY AND WATER COMM

Place of Performance

Del Rio, Texas 78840
USA

Dates

Posted Oct 03, 2025 10 months ago
Last Updated Aug 06, 2026 2 days ago
Awarded Sep 29, 2025 10 months ago