Replace Kadena Tanks FA527025R0032
Summary
AI-generated · Aug 25, 2025Replace Kadena Air Base fuel and waste oil storage tanks with Convault tanks, or an approved equal, and replace all associated piping and accessories to make the tanks complete and usable. Some tanks have tested positive for asbestos and/or lead-based paint and will require abatement. Include seismic protection, antiterrorism/fire protection measures as required, and integrate sustainable principles and life-cycle cost–effective practices per UFC 1-200-02 in the design, development, and construction, with details in Section 8 of the Statement of Work (SOW).
Earlier notices indicated general intent; the current solicitation specifies the exact tank type (Convault or approved equal), references Kadena Design Guide sections 13.11.1-3 and 21.1.7, requires asbestos/lead abatement where applicable, and mandates the inclusion of piping/accessories, seismic/AT/fire protections, and sustainability per UFC 1-200-02 (including High Performance and Sustainable Building Requirements) as described in the SOW.
This project shall accomplish a design-build replacement of the fuel tanks located at the following facilities. B176, B329, B613, B786, B1206, B3413, B3489, B3506. Replace the listed fuel and waste oil storage tanks on Kadena Air Base. New tanks shall be Convault tanks, or an approved equal, to mitigate leak and corrosion. Refer to Kadena Design Guide sections 13.11.1-3, and 21.1.7 for more guidance. Some tanks have tested positive for asbestos and/or lead based paint, which will require abatement. Work also includes all necessary replacement of associated piping and accessories to ensure the tanks are complete and usable. Include seismic protection, antiterrorism, and fire protection measures as required. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). Sustainable principles, to include life cycle cost- effective practices shall be integrated into the design, development, and construction of the project(s) in accordance with the latest version of UFC 1-200-02, High Performance and Sustainable Building Requirements. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).
From Sources Sought posted on Jun 05, 2025This project shall accomplish a design-build replacement of the fuel tanks located at the following facilities. B176, B329, B613, B786, B1206, B3413, B3489, B3506. Replace the listed fuel and waste oil storage tanks on Kadena Air Base. New tanks shall be Convault tanks, or an approved equal, to mitigate leak and corrosion. Refer to Kadena Design Guide sections 13.11.1-3, and 21.1.7 for more guidance. Some tanks have tested positive for asbestos and/or lead based paint, which will require abatement. Work also includes all necessary replacement of associated piping and accessories to ensure the tanks are complete and usable. Include seismic protection, antiterrorism, and fire protection measures as required. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). Sustainable principles, to include life cycle cost- effective practices shall be integrated into the design, development, and construction of the project(s) in accordance with the latest version of UFC 1-200-02, High Performance and Sustainable Building Requirements. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).
From Presolicitation posted on Jun 16, 2025Replace the listed fuel and waste oil storage tanks on Kadena Air Base. New tanks shall be Convault tanks, or an approved equal, to mitigate leak and corrosion. Refer to Kadena Design Guide sections 13.11.1-3, and 21.1.7 for more guidance. Some tanks have tested positive for asbestos and/or lead based paint, which will require abatement. Work also includes all necessary replacement of associated piping and accessories to ensure the tanks are complete and usable. Include seismic protection, antiterrorism, and fire protection measures as required. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). Sustainable principles, to include life cycle cost- effective practices shall be integrated into the design, development, and construction of the project(s) in accordance with the latest version of UFC 1-200-02, High Performance and Sustainable Building Requirements.
From Solicitation posted on Jul 03, 2025Replace the listed fuel and waste oil storage tanks on Kadena Air Base. New tanks shall be Convault tanks, or an approved equal, to mitigate leak and corrosion. Refer to Kadena Design Guide sections 13.11.1-3, and 21.1.7 for more guidance. Some tanks have tested positive for asbestos and/or lead based paint, which will require abatement. Work also includes all necessary replacement of associated piping and accessories to ensure the tanks are complete and usable. Include seismic protection, antiterrorism, and fire protection measures as required. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). Sustainable principles, to include life cycle cost- effective practices shall be integrated into the design, development, and construction of the project(s) in accordance with the latest version of UFC 1-200-02, High Performance and Sustainable Building Requirements.
From Solicitation posted on Jul 28, 2025Replace the listed fuel and waste oil storage tanks on Kadena Air Base. New tanks shall be Convault tanks, or an approved equal, to mitigate leak and corrosion. Refer to Kadena Design Guide sections 13.11.1-3, and 21.1.7 for more guidance. Some tanks have tested positive for asbestos and/or lead based paint, which will require abatement. Work also includes all necessary replacement of associated piping and accessories to ensure the tanks are complete and usable. Include seismic protection, antiterrorism, and fire protection measures as required. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). Sustainable principles, to include life cycle cost- effective practices shall be integrated into the design, development, and construction of the project(s) in accordance with the latest version of UFC 1-200-02, High Performance and Sustainable Building Requirements.
From Solicitation posted on Aug 13, 2025Notice history
5-
Sources Sought Posted Jun 05, 2025
-
Presolicitation Posted Jun 16, 2025View changes (3)
- Title: Replace Kadena Tanks → Replace Kadena Tanks LXEZ241015
- Notice Type: Sources Sought → Presolicitation
- Response Deadline: Jun 17, 2025 → Jul 01, 2025
-
Solicitation Posted Jul 03, 2025View changes (4)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Jul 01, 2025 → Aug 04, 2025
- Set-Aside: No Set aside used → None
-
Solicitation LATEST Posted Aug 13, 2025View changes (1)
- Response Deadline: Aug 18, 2025 → Aug 25, 2025
Details
Award Information
Not yet awarded