Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 5 notices

Replace Kadena Tanks LXEZ241015 FA527025R0032

Solicitation FA527025R0032 Copied Notice ID b0874d0859404a448e41ad746ad2561c Copied DEPT OF DEFENSE — FA5270 18 CONS PK
SAM.gov
Posted
Aug 13, 2025
Deadline
Aug 25, 2025
Set-aside
None
NAICS
237120
PSC
Z1NA

Summary

AI-generated · Aug 25, 2025

Replace Kadena Air Base fuel and waste oil storage tanks with Convault tanks, or an approved equal, and replace all associated piping and accessories to make the tanks complete and usable. Some tanks have tested positive for asbestos and/or lead-based paint and will require abatement. Include seismic protection, antiterrorism/fire protection measures as required, and integrate sustainable principles and life-cycle cost–effective practices per UFC 1-200-02 in the design, development, and construction, with details in Section 8 of the Statement of Work (SOW).

Earlier notices indicated general intent; the current solicitation specifies the exact tank type (Convault or approved equal), references Kadena Design Guide sections 13.11.1-3 and 21.1.7, requires asbestos/lead abatement where applicable, and mandates the inclusion of piping/accessories, seismic/AT/fire protections, and sustainability per UFC 1-200-02 (including High Performance and Sustainable Building Requirements) as described in the SOW.

This project shall accomplish a design-build replacement of the fuel tanks located at the following facilities. B176, B329, B613, B786, B1206, B3413, B3489, B3506. Replace the listed fuel and waste oil storage tanks on Kadena Air Base. New tanks shall be Convault tanks, or an approved equal, to mitigate leak and corrosion. Refer to Kadena Design Guide sections 13.11.1-3, and 21.1.7 for more guidance. Some tanks have tested positive for asbestos and/or lead based paint, which will require abatement. Work also includes all necessary replacement of associated piping and accessories to ensure the tanks are complete and usable. Include seismic protection, antiterrorism, and fire protection measures as required. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). Sustainable principles, to include life cycle cost- effective practices shall be integrated into the design, development, and construction of the project(s) in accordance with the latest version of UFC 1-200-02, High Performance and Sustainable Building Requirements. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).

From Sources Sought posted on Jun 05, 2025

This project shall accomplish a design-build replacement of the fuel tanks located at the following facilities. B176, B329, B613, B786, B1206, B3413, B3489, B3506. Replace the listed fuel and waste oil storage tanks on Kadena Air Base. New tanks shall be Convault tanks, or an approved equal, to mitigate leak and corrosion. Refer to Kadena Design Guide sections 13.11.1-3, and 21.1.7 for more guidance. Some tanks have tested positive for asbestos and/or lead based paint, which will require abatement. Work also includes all necessary replacement of associated piping and accessories to ensure the tanks are complete and usable. Include seismic protection, antiterrorism, and fire protection measures as required. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). Sustainable principles, to include life cycle cost- effective practices shall be integrated into the design, development, and construction of the project(s) in accordance with the latest version of UFC 1-200-02, High Performance and Sustainable Building Requirements. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).

From Presolicitation posted on Jun 16, 2025

Replace the listed fuel and waste oil storage tanks on Kadena Air Base. New tanks shall be Convault tanks, or an approved equal, to mitigate leak and corrosion. Refer to Kadena Design Guide sections 13.11.1-3, and 21.1.7 for more guidance. Some tanks have tested positive for asbestos and/or lead based paint, which will require abatement. Work also includes all necessary replacement of associated piping and accessories to ensure the tanks are complete and usable. Include seismic protection, antiterrorism, and fire protection measures as required. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). Sustainable principles, to include life cycle cost- effective practices shall be integrated into the design, development, and construction of the project(s) in accordance with the latest version of UFC 1-200-02, High Performance and Sustainable Building Requirements.

From Solicitation posted on Jul 03, 2025

Replace the listed fuel and waste oil storage tanks on Kadena Air Base. New tanks shall be Convault tanks, or an approved equal, to mitigate leak and corrosion. Refer to Kadena Design Guide sections 13.11.1-3, and 21.1.7 for more guidance. Some tanks have tested positive for asbestos and/or lead based paint, which will require abatement. Work also includes all necessary replacement of associated piping and accessories to ensure the tanks are complete and usable. Include seismic protection, antiterrorism, and fire protection measures as required. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). Sustainable principles, to include life cycle cost- effective practices shall be integrated into the design, development, and construction of the project(s) in accordance with the latest version of UFC 1-200-02, High Performance and Sustainable Building Requirements.

From Solicitation posted on Jul 28, 2025

Replace the listed fuel and waste oil storage tanks on Kadena Air Base. New tanks shall be Convault tanks, or an approved equal, to mitigate leak and corrosion. Refer to Kadena Design Guide sections 13.11.1-3, and 21.1.7 for more guidance. Some tanks have tested positive for asbestos and/or lead based paint, which will require abatement. Work also includes all necessary replacement of associated piping and accessories to ensure the tanks are complete and usable. Include seismic protection, antiterrorism, and fire protection measures as required. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). Sustainable principles, to include life cycle cost- effective practices shall be integrated into the design, development, and construction of the project(s) in accordance with the latest version of UFC 1-200-02, High Performance and Sustainable Building Requirements.

From Solicitation posted on Aug 13, 2025

Notice history

5
  1. Sources Sought Posted Jun 05, 2025 View
  2. Presolicitation Posted Jun 16, 2025
    • Title: Replace Kadena TanksReplace Kadena Tanks LXEZ241015
    • Notice Type: Sources SoughtPresolicitation
    • Response Deadline: Jun 17, 2025Jul 01, 2025
  3. Solicitation Posted Jul 03, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Jul 01, 2025Aug 04, 2025
    • Set-Aside: No Set aside usedNone
  4. Solicitation Posted Jul 28, 2025
    • Response Deadline: Aug 04, 2025Aug 18, 2025
  5. Solicitation LATEST Posted Aug 13, 2025
    • Response Deadline: Aug 18, 2025Aug 25, 2025

Details

Solicitation number FA527025R0032
Notice ID b0874d0859404a448e41ad746ad2561c
Notice type Solicitation
Product / Service (PSC) Z1NA
NAICS 237120
Archive date Aug 25, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Moriah Clark

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
PACIFIC AIR FORCES
FA5270 18 CONS PK

Place of Performance

Kadena AFB, Okinawa Japan
96368

Dates

Posted Aug 13, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 25, 2025 11 months ago