Summary
AI-generated · Sep 01, 2025Remove the existing generator, automatic transfer switch (ATS), and fuel tank at Building 001 and replace them with a new 350 kW Tier 4 generator, 277/480 V ATS, and a 500-gallon day tank on a newly fenced concrete pad, including all required wiring, conduits, and fencing per the plans and specifications. Demolition of old equipment and proper cleanup of construction debris must follow NAS Lemoore requirements.
Construction work includes excavating and grading the new pad location, intercepting the underground service to Building 7, installing an underground pull box, conduit, and wiring to the new generator location, and providing a temporary backup generator for Building 7 ATS during construction. Additional tasks include installing CMU blocking within the existing opening, completing all wire connections, installing a new fencing, conducting an operational check and training for NAS Lemoore PW staff, and delivering as-built drawings, daily reports, and required documentation. The project was awarded for about $1.297 million to Souza Construction, Inc.
1.2.1 Project Description The work includes Removal and replacement of existing generator, automatic transfer switch (ATS) and fuel tank. New equipment to installed on new fenced concrete pad. and incidental related work. Demo: 1. Remove existing generator, automatic transfer switch, fuel tank per and appertinaces per plans and specifications. 2. Clean up and dispose of construction refuge per NAS Lemoore requirements. Construction: 1. Excavate and grade new location for concrete pad per plans and specicfications. 2. Provide and maintaing a temporary backup generator to Buiding 7 ATS. 3. Intercept undergroung service to Building 7. Install underground pull box, conduit and wire to new generator location per plans and specifications. 4. Install new concrete pad per plans and specifications. 5. Install new 350 kW SJVAPCD Teir 4 final generator set, 277/480 V automatic transfer switch and 500 Gal fuel day tank per plans and specifications. 6. Install new conduit and wiring per plans and specifications. 7. Provide all necessary wire connections per plans and specifications. 8. Install new fencing per plans and specifications. 9. Install CMU blocking within opening on existing building per plans and specifications. 10. Perform operational check and training to NAS Lemoore PW staff . 11. Clean up and dispose of construction refuge per NAS Lemoore requirements. 12.Provide NAVFAC Facilities Engineering and Acquisitions Division (FEAD)CM with As-built drawings, Contractor daily reports and required documentation as specified to complete the scope of work.
From Award Notice posted on Aug 28, 2025Notice history
1-
Award Notice LATEST Posted Aug 28, 2025
Details
Award Information
Award Notices
Posted: Aug 28, 2025
1.2.1 Project Description The work includes Removal and replacement of existing generator, automatic transfer switch (ATS) and fuel tank. New equipment to installed on new fenced concrete pad. and incidental related work. Demo: 1. Remove existing generator, automatic transfer switch, fuel tank per a...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| SOUZA CONSTRUCTION, INC. | MEKSHDL5THP8 | 1A9V0 | Farmersville, CA |