Repair Interior Renovation Bldg 90131 FA441725C0010
Summary
AI-generated · Aug 24, 2025Renovation and expansion of Building 90131 at Hurlburt Field to create office and workspace for the 2nd Special Operations Facility. Scope combines sitework (new concrete sidewalk on the south side and bollards at exterior stairs), structural work (new second-floor mezzanine and western-half stairs using structural steel, shallow foundations, and replacement of foundation slab-on-grade with reinforced concrete), demolition (removal of existing toilet rooms, central 2-story office pylon, trolley hoist system and some slabs), and new construction (restrooms on the first floor, briefing room, break room, open office area, private offices, fitness room, personnel lockers, and two bunk/rest rooms). Interior finishes and design elements include acoustical ceilings, gypsum-board partitions, casework, no-wax flooring options, and modular signage.
Interior finishes feature no-wax luxury vinyl tile, carpet tile, porcelain tile in locker/restrooms, rubber base, and open or suspended ceilings. The project has been awarded to REASOR BUILDING GROUP LLC for $8,053,275.00 and is intended to provide the specified office and workspace for the 2nd Special Operations Facility.
The 1st Special Operations Contracting Squadron, Hurlburt Field, FL has made an award for the subject contract to Reasor Building Group, LLC. Work Includes Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131 in accordance with project CP 1032233. Posted for early read-ahead for potential offerors to develop Requests for Information prior to established timelines identified in the final solicitation. Project Description: Repair - Interior Renovation Bldg 90131. Project CP1032233. The renovated space is to provide office and workspace for the 2nd Special Operations Facility. Work includes: Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131. Constructed of structural steel beams/purlins, structural steel columns, and a composite floor system consisting of normal weight concrete on metal deck. The steel columns will require new shallow foundations. Replacement of the slab-on-grade at the foundations will consist of 5-inch-thick minimum reinforced concrete. Architectural: Demolition includes complete demolition of existing toilet rooms, central 2-story office pylon, trolley hoist system including beams and columns and some slab demolition. New work includes work on the first-floor additional restrooms, briefing room, break room, open office area, private offices, fitness room, personnel lockers, and 2 resting/bunk rooms. Interior finish systems include suspended acoustical tile ceilings, painted gypsum board on metal studs, new break room casework, and new toilet rooms with showers. Interior Design: Include interior finishes consist of no-wax, luxury vinyl tile flooring; modular carpet tile in the Open Office, Admin and Rest areas; thermoset rubber wall base; porcelain tile floors and walls in the Locker and Restrooms; Ceilings are open to structure or suspended acoustical tiles; Signage shall be modular, acrylic with printed paper inserts.
From Award Notice posted on Jul 16, 2025Notice history
1-
Award Notice LATEST Posted Jul 16, 2025
Details
Award Information
Award Notices
Posted: Jul 16, 2025
The 1st Special Operations Contracting Squadron, Hurlburt Field, FL has made an award for the subject contract to Reasor Building Group, LLC. Work Includes Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine a...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| REASOR BUILDING GROUP LLC | H2ZDMKZLM472 | 7NSR5 | Pensacola, FL |
Contacts
Phone
Agency
Place of Performance
USA