Renovation of 3rd floor building 13A FA282325R0008
Summary
AI-generated · Aug 25, 2025Renovation of the 3rd floor, Building 13A, in accordance with ICD 705 standards. Scope includes selective demolition of interior construction and finishes, modifications to conference rooms, offices, corridors, and the breakroom (about 6,800 square feet), plus replacement of the HVAC and electrical systems. Project magnitude is estimated between $5,000,000 and $10,000,000.
Award to SPEEGLE CONSTRUCTION, INC for $6,278,100. Amendment 5 updates confirm that proposals account for all amendments. Related presolicitation notice FA2823-25-R-1991 exists. An RFI regarding whether to convert Government PDF attachments to branded Word templates was answered: do not convert Government templates; all documentation should remain as submitted.
SOLICITATION OF 3RD FLOOR BUILDING 13A IN ACCORDANCE WITH ICD 705 standards. Work includes selective demolition of existing interior construction, finishes and modifications to conference rooms, offices, corridor, and breakroom estimated 6,800 sq ft. Also included are the replacement of the existing HVAC and electrical system. In Accordance with FAR 36.204 Disclosure of the magnitude of construction projects. The Government preliminary estimate order of Magnitude is between $5,000,000 - $10,000,000.**RELATED NOTICE ID - FA2823-25-R-1991 PRESOLICITATION NOTICE**Please be advised proposal due date is 17 June 2025The Government answer to RFI 110, Attachment L3 - is it acceptable for the Offeror to recreate the Government issued PDF Attachments into branded Word Document templates for ease of completing if we are not changing the overall formatting?, Is NO do not convert Government templates, all documentation should remain as submitted.
From Solicitation posted on Jun 06, 2025SOLICITATION OF 3RD FLOOR BUILDING 13A IN ACCORDANCE WITH ICD 705 standards. Work includes selective demolition of existing interior construction, finishes and modifications to conference rooms, offices, corridor, and breakroom estimated 6,800 sq ft. Also included are the replacement of the existing HVAC and electrical system. In Accordance with FAR 36.204 Disclosure of the magnitude of construction projects. The Government preliminary estimate order of Magnitude is between $5,000,000 - $10,000,000.**RELATED NOTICE ID - FA2823-25-R-1991 PRESOLICITATION NOTICE**Please be advised proposal due date is 17 June 2025The Government answer to RFI 110, Attachment L3 - is it acceptable for the Offeror to recreate the Government issued PDF Attachments into branded Word Document templates for ease of completing if we are not changing the overall formatting?, Is NO do not convert Government templates, all documentation should remain as submitted.Amendment 5- Is to allow update or confirmation that the proposal is valid and inclusive of all amendment changes. Please provide verification that all Amendments have been viewed and accounted for in proposals.
From Award Notice posted on Aug 19, 2025Notice history
2-
-
Award Notice LATEST Posted Aug 19, 2025
Details
Award Information
Award Notices
Posted: Aug 19, 2025
SOLICITATION OF 3RD FLOOR BUILDING 13A IN ACCORDANCE WITH ICD 705 standards. Work includes selective demolition of existing interior construction, finishes and modifications to conference rooms, offices, corridor, and breakroom estimated 6,800 sq ft. Also included are the replacement of the existing...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| SPEEGLE CONSTRUCTION, INC | FE24DCBHDYQ1 | 8S273 | Niceville, FL |
Contacts
Agency
Place of Performance
32542