Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 1 notice

Prefabricated Timber Crossing Panels W911S225U0867

Solicitation W911S225U0867 Copied Notice ID 4db47ad6203b495d806b87ab648db2d1 Copied DEPT OF DEFENSE — W6QM MICC-FT DRUM
SAM.gov
Posted
Jun 05, 2025
Deadline
Jun 11, 2025
Set-aside
SBA
NAICS
336999
PSC
2250

Summary

AI-generated · Aug 23, 2025

Prefabricated timber crossing panels are being solicited under a Combined Synopsis/Solicitation.

The posted description does not include detailed scope or requirements. To bid, contractors should obtain the full solicitation to learn the exact specifications, technical requirements, quantities, delivery terms, and contract conditions.

Amendment to add Set Aside Code from N/A to Total Small Business Set-Aside. Overview:Request is for Prefabricated Timber Crossing Panels. The timber panels layover the rail and ties to allow passenger vehicles cross. The panels are generally 8 feet in length and require detailed cuts, notching, beveling, and drilling to perfectly fit inside the rail gauge and outside on the rail field side.Requirement:Requesting quote for timber crossing panels to repair/replace the existing panels for eleven (11), standard rail gauge, crossings. Each crossing is comprised of eight (8) panels, 8-ft panel sections (gauge and field panels) for a total of 704 track feet of grade crossings. Total Panels Required = 88 Pannels (11 Crossings x 8 Panels per crossing).Panels Length = 8 ft sections (gauge and field panels).Total Track Feet = 704 ftPanels SHALL be Full depth creosote-treated hardwood timber crossing panels for railroad crossings.Timbers SHALL be primarily oak and with some mixed hardwoods allowed.Panels must be fit for 100-lb AREA rail placed on 10-ft cross-ties.The panels SHALL NOT be pre-drilled for fasteners, and no fasteners required.The standard creosote retention for railroad timbers is 7 pounds per cubic foot (pcf) for oak, hickory, or mixed hardwoods. Creosote is required for protection against decay fungi and insects, and restores the woods natural elasticity.

From Combined Synopsis/Solicitation posted on Jun 05, 2025

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted Jun 05, 2025

Details

Solicitation number W911S225U0867
Notice ID 4db47ad6203b495d806b87ab648db2d1
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) 2250
NAICS 336999
Archive date Jun 05, 2026

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Kevin Harp

Email

Phone

secondary
Joy Davis

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
AMC
ACC
MISSION INSTALLATION CONTRACTING COMMAND
419TH CSB
W6QM MICC-FT DRUM

Place of Performance

6280 Sunny Point Road, SESouthport, NC 28461
28461

Dates

Posted Jun 05, 2025 1 year ago
Last Updated Aug 05, 2026 2 days ago
Due Jun 11, 2025 1 year ago