Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation NONE Expired 3 notices 3 documents

Power Installation FA850125Q0058

Solicitation FA850125Q0058 Copied Notice ID bf3ba1fb109d4f4ca873920db0f36b11 Copied DEPT OF DEFENSE — FA8501 OPL CONTRACTING AFSC/PZIO
SAM.gov
Posted
Aug 11, 2025
Deadline
Aug 19, 2025
Set-aside
NONE
NAICS
238210
PSC
N059

Summary

AI-generated · Aug 24, 2025

Install a 30 KVA transformer and a new 42-circuit, 120/208V, 100-amp electrical panel at the project site. Subsequent notices broaden the scope to include installing a suspended 30 KVA transformer or transformer-panel combo, replacing an existing 208/120V 3-phase electrical panel, and re-routing existing circuits at the same location. A site visit is scheduled, and attachments contain additional details.

Changes between notices: the initial requirement calls for a fixed transformer and a dedicated panel, while later notices allow a suspended transformer or transformer-panel combo and add circuit re-routing, with attendance at the site visit strongly encouraged to gain a complete understanding of the requirement.

The Air Force has a requirement for the installation of one 30 KVA transformer and a new 42 circuit 120/208v 100- amp panel. A site visit has been scheduled for Friday, 18 July. Please refer to the attachments for additional details

From Combined Synopsis/Solicitation posted on Jul 15, 2025

The Air Force has a requirement for the installation of a suspended 30 KVA transformer or transformer panel combo, replacement of an existing 208/120V 3-phase electrical panel, and re-routing of existing circuits at the specified project location. Please refer to the attachments for additional details. A site visit has been scheduled for Wednesday, 13 August. It is strongly encouraged that interested vendors attend the site visit to gain a complete understanding of the requirement.

From Combined Synopsis/Solicitation posted on Aug 05, 2025

The Air Force has a requirement for the installation of a suspended 30 KVA transformer or transformer panel combo, replacement of an existing 208/120V 3-phase electrical panel, and re-routing of existing circuits at the specified project location. Please refer to the attachments for additional details. A site visit has been scheduled for Wednesday, 13 August. It is strongly encouraged that interested vendors attend the site visit to gain a complete understanding of the requirement.

From Combined Synopsis/Solicitation posted on Aug 11, 2025

Notice history

3
  1. Combined Synopsis/Solicitation Posted Jul 15, 2025 View
  2. Combined Synopsis/Solicitation Posted Aug 05, 2025
    • Description: Description was updated
    • Response Deadline: Jul 29, 2025Aug 19, 2025
  3. Combined Synopsis/Solicitation LATEST Posted Aug 11, 2025
    No changes from previous notice

Details

Solicitation number FA850125Q0058
Notice ID bf3ba1fb109d4f4ca873920db0f36b11
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) N059
NAICS 238210
Set-aside No Set aside used
Place of performance Warner Robins, Georgia
Archive date Sep 03, 2025

Award Information

Not yet awarded

Contacts

primary
Hannah Carreiro

Email

secondary
Alycia Smith

Email

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR FORCE MATERIEL COMMAND
AIR FORCE SUSTAINMENT CENTER
FA8501 OPL CONTRACTING AFSC/PZIO

Place of Performance

Warner Robins, Georgia 31098
USA

Dates

Posted Aug 11, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 19, 2025 11 months ago