NV FTBL 1094(1) Wilson Campground Road 6982AF25B000025

Solicitation 6982AF25B000025 Copied Notice ID 0e1b44d7f6554137bdb4780cd3974360 Copied TRANSPORTATION, DEPARTMENT OF — 6982AF CENTRAL FEDERAL LANDS DIVISI
SAM.gov
Posted
Nov 25, 2025
Deadline
Nov 25, 2025
Set-aside
SBA
NAICS
237310
PSC
Y1LB

Summary

AI-generated · Sep 28, 2025

Contract would perform improvements to Wilson Campground Road, a 7.23-mile aggregate-surfaced road in the BLM Wilson Reservoir Recreation Management Area, to improve safety, support greater visitor use, and enhance the driving experience. Work includes resurfacing, sight-distance improvements with an alignment shift in an existing S-curve, cattle guard adjustments, drainage improvements, minor bridge repairs, and signing replacements.

The project is split into Schedule A (about 6.21 miles toward campground facilities with hydraulic improvements and S-curve work) and Option X (about 1.01 miles with minor bridge work and hydraulic improvements). Principal tasks include clearing and grubbing (14.4 acres), subexcavation (600 cubic yards), aggregate surface course (22,200 tons), roadbed reconditioning (6.94 miles), minor bridge work, 24-inch equivalent diameter culverts (approximately 520 linear feet), placing conserved topsoil (4,500 cubic yards), and temporary traffic control. The estimated value is $5–$10 million. Plans and specifications are not available, and competition is restricted to small businesses.

THIS IS NOT AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE NOT AVAILABLE COMPETITION: TOTAL SMALL BUSINESS SET-ASIDE PROJECT NUMBER: NV FTBL 1094(1) PROJECT NAME: WILSON CAMPGROUND ROAD PROJECT DESCRIPTION: The Wilson Campground Road Project is located along Wilson Campground Road, 83 miles northwest of Elko, Nevada. The road is located completely within theBureau of Land Management (BLM) Wilson Reservoir Recreation Management Area and is primarily used to access the Wilson Campground Recreation Area on thenorth end of the project. The need for the project is to improve safety, increase visitor usage, and enhance the driving experience. SCOPE OF THE WORK: Wilson Campground Road project is comprised of a 7.23-mile aggregate surfaced road along Wilson Campground Road. The proposed improvements as part of this project include resurfacing the existing roads, site distance improvements including an alignment shift along an existing S-curve area, cattle guard adjustments, drainage improvements, minor bridge repairs, and signing replacements. Based on available funding and construction cost analyzed during the scoping phase, the project has been broken into a schedule (Schedule A) and an option(Option X). Schedule A consists of resurfacing the 6.21 miles of aggregate road leading towards the campground facilities, multiple hydraulic improvements, and the S curve area improvements. Option X consists of resurfacing the 1.01 miles of aggregate road leading towards the campground facilities, minor bridge repairs, and multiple hydraulic improvements. PRINCIPAL WORK ITEMS: 20101-0000 Clearing and Grubbing: 14.4 ACRE 20402-0000 Subexcavation: 600 CUYD 30110-0000 Aggregate Surface Course: 22,200 TON 30301-4000 Roadbed Reconditioning: 6.940 MILE 57501-0000 Minor Bridge Work: LPSM 60202-0400 24-INCH Equivalent Diameter Arch or Elliptical Pipe Culvert: 520 LNFT 62407-0000 Placing Conserved Topsoil: 4,500 CUYD 63501-0000 Temporary Traffic Control: LPSM ANTICIPATED SCHEDULE: Advertisement October 2025 Award December 2025 NTP December 2025 Contract Completion November 2026 DISCLOURE OF MAGNITUDE: Between $5,000,000 and $10,000,000.

From Presolicitation posted on Sep 24, 2025

NV FTBL 1094(1) Wilson Campground Road PROJECT DESCRIPTION: The Wilson Campground Road Project is located along Wilson Campground Road, 83 miles northwest of Elko, Nevada. The road is located completely within theBureau of Land Management (BLM) Wilson Reservoir Recreation Management Area and is primarily used to access the Wilson Campground Recreation Area on the north end of the project. The need for the project is to improve safety, increase visitor usage, and enhance the driving experience. SCOPE OF THE WORK: The project is comprised of a 7.23-mile aggregate surfaced road along Wilson Campground Road. The proposed improvements as part of this project include resurfacing the existing roads, site distance improvements including an alignment shift along an existing S-curve area, cattle guard adjustments, drainage improvements, minor bridge repairs, and signing replacements. Based on available funding and construction cost analyzed during the scoping phase, the project has been broken into a schedule (Schedule A) and an option(Option X). Schedule A consists of resurfacing the 6.21 miles of aggregate road leading towards the campground facilities, multiple hydraulic improvements, and the S curve area improvements. Option X consists of resurfacing the 1.01 miles of aggregate road leading towards the campground facilities, minor bridge repairs, and multiple hydraulic improvements.

From Solicitation posted on Oct 20, 2025

NV FTBL 1094(1) Wilson Campground Road PROJECT DESCRIPTION: The Wilson Campground Road Project is located along Wilson Campground Road, 83 miles northwest of Elko, Nevada. The road is located completely within theBureau of Land Management (BLM) Wilson Reservoir Recreation Management Area and is primarily used to access the Wilson Campground Recreation Area on the north end of the project. The need for the project is to improve safety, increase visitor usage, and enhance the driving experience. SCOPE OF THE WORK: The project is comprised of a 7.23-mile aggregate surfaced road along Wilson Campground Road. The proposed improvements as part of this project include resurfacing the existing roads, site distance improvements including an alignment shift along an existing S-curve area, cattle guard adjustments, drainage improvements, minor bridge repairs, and signing replacements. Based on available funding and construction cost analyzed during the scoping phase, the project has been broken into a schedule (Schedule A) and an option(Option X). Schedule A consists of resurfacing the 6.21 miles of aggregate road leading towards the campground facilities, multiple hydraulic improvements, and the S curve area improvements. Option X consists of resurfacing the 1.01 miles of aggregate road leading towards the campground facilities, minor bridge repairs, and multiple hydraulic improvements.

From Solicitation posted on Oct 29, 2025

NV FTBL 1094(1) Wilson Campground Road PROJECT DESCRIPTION: The Wilson Campground Road Project is located along Wilson Campground Road, 83 miles northwest of Elko, Nevada. The road is located completely within theBureau of Land Management (BLM) Wilson Reservoir Recreation Management Area and is primarily used to access the Wilson Campground Recreation Area on the north end of the project. The need for the project is to improve safety, increase visitor usage, and enhance the driving experience. SCOPE OF THE WORK: The project is comprised of a 7.23-mile aggregate surfaced road along Wilson Campground Road. The proposed improvements as part of this project include resurfacing the existing roads, site distance improvements including an alignment shift along an existing S-curve area, cattle guard adjustments, drainage improvements, minor bridge repairs, and signing replacements. Based on available funding and construction cost analyzed during the scoping phase, the project has been broken into a schedule (Schedule A) and an option(Option X). Schedule A consists of resurfacing the 6.21 miles of aggregate road leading towards the campground facilities, multiple hydraulic improvements, and the S curve area improvements. Option X consists of resurfacing the 1.01 miles of aggregate road leading towards the campground facilities, minor bridge repairs, and multiple hydraulic improvements.

From Solicitation posted on Nov 12, 2025

NV FTBL 1094(1) Wilson Campground Road PROJECT DESCRIPTION: The Wilson Campground Road Project is located along Wilson Campground Road, 83 miles northwest of Elko, Nevada. The road is located completely within theBureau of Land Management (BLM) Wilson Reservoir Recreation Management Area and is primarily used to access the Wilson Campground Recreation Area on the north end of the project. The need for the project is to improve safety, increase visitor usage, and enhance the driving experience. SCOPE OF THE WORK: The project is comprised of a 7.23-mile aggregate surfaced road along Wilson Campground Road. The proposed improvements as part of this project include resurfacing the existing roads, site distance improvements including an alignment shift along an existing S-curve area, cattle guard adjustments, drainage improvements, minor bridge repairs, and signing replacements. Based on available funding and construction cost analyzed during the scoping phase, the project has been broken into a schedule (Schedule A) and an option(Option X). Schedule A consists of resurfacing the 6.21 miles of aggregate road leading towards the campground facilities, multiple hydraulic improvements, and the S curve area improvements. Option X consists of resurfacing the 1.01 miles of aggregate road leading towards the campground facilities, minor bridge repairs, and multiple hydraulic improvements.

From Solicitation posted on Nov 19, 2025

NV FTBL 1094(1) Wilson Campground Road PROJECT DESCRIPTION: The Wilson Campground Road Project is located along Wilson Campground Road, 83 miles northwest of Elko, Nevada. The road is located completely within theBureau of Land Management (BLM) Wilson Reservoir Recreation Management Area and is primarily used to access the Wilson Campground Recreation Area on the north end of the project. The need for the project is to improve safety, increase visitor usage, and enhance the driving experience. SCOPE OF THE WORK: The project is comprised of a 7.23-mile aggregate surfaced road along Wilson Campground Road. The proposed improvements as part of this project include resurfacing the existing roads, site distance improvements including an alignment shift along an existing S-curve area, cattle guard adjustments, drainage improvements, minor bridge repairs, and signing replacements. Based on available funding and construction cost analyzed during the scoping phase, the project has been broken into a schedule (Schedule A) and an option(Option X). Schedule A consists of resurfacing the 6.21 miles of aggregate road leading towards the campground facilities, multiple hydraulic improvements, and the S curve area improvements. Option X consists of resurfacing the 1.01 miles of aggregate road leading towards the campground facilities, minor bridge repairs, and multiple hydraulic improvements.

From Solicitation posted on Nov 21, 2025

NV FTBL 1094(1) Wilson Campground Road PROJECT DESCRIPTION: The Wilson Campground Road Project is located along Wilson Campground Road, 83 miles northwest of Elko, Nevada. The road is located completely within theBureau of Land Management (BLM) Wilson Reservoir Recreation Management Area and is primarily used to access the Wilson Campground Recreation Area on the north end of the project. The need for the project is to improve safety, increase visitor usage, and enhance the driving experience. SCOPE OF THE WORK: The project is comprised of a 7.23-mile aggregate surfaced road along Wilson Campground Road. The proposed improvements as part of this project include resurfacing the existing roads, site distance improvements including an alignment shift along an existing S-curve area, cattle guard adjustments, drainage improvements, minor bridge repairs, and signing replacements. Based on available funding and construction cost analyzed during the scoping phase, the project has been broken into a schedule (Schedule A) and an option(Option X). Schedule A consists of resurfacing the 6.21 miles of aggregate road leading towards the campground facilities, multiple hydraulic improvements, and the S curve area improvements. Option X consists of resurfacing the 1.01 miles of aggregate road leading towards the campground facilities, minor bridge repairs, and multiple hydraulic improvements.

From Solicitation posted on Nov 25, 2025

Notice history

7
  1. Presolicitation Posted Sep 24, 2025 View
  2. Solicitation Posted Oct 20, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Not setNov 20, 2025
  3. Solicitation Posted Oct 29, 2025
    No changes from previous notice
  4. Solicitation Posted Nov 12, 2025
    No changes from previous notice
  5. Solicitation Posted Nov 19, 2025
    • Response Deadline: Nov 20, 2025Nov 25, 2025
  6. Solicitation Posted Nov 21, 2025
    No changes from previous notice
  7. Solicitation LATEST Posted Nov 25, 2025
    No changes from previous notice

Details

Solicitation number 6982AF25B000025
Notice ID 0e1b44d7f6554137bdb4780cd3974360
Notice type Solicitation
Product / Service (PSC) Y1LB
NAICS 237310
Place of performance Elko, Nevada
Archive date Dec 25, 2025

Award Information

Not yet awarded

Contacts

primary
Denise Martinez

Email

secondary
Leslie Karsten

Email

Agency

TRANSPORTATION, DEPARTMENT OF
FEDERAL HIGHWAY ADMINISTRATION
6982AF CENTRAL FEDERAL LANDS DIVISI

Place of Performance

Elko, Nevada
USA

Dates

Posted Nov 25, 2025 8 months ago
Last Updated Aug 06, 2026 1 day ago
Due Nov 25, 2025 8 months ago