Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 8 notices

NM FS 220(1), Romero Creek Bridge 6982AF25B000012

Solicitation 6982AF25B000012 Copied Notice ID 6bd0c9c031dd45d485c6eb9c7758d8de Copied TRANSPORTATION, DEPARTMENT OF — 6982AF CENTRAL FEDERAL LANDS DIVISI
SAM.gov
Posted
Jul 28, 2025
Deadline
Aug 12, 2025
Set-aside
SBA
NAICS
237310
PSC
Y1LB

Summary

AI-generated · Aug 24, 2025

Replace the deteriorated Romero Creek Bridge on Forest Route 220 (MP 7.325) over Romero Creek in Catron County, NM, with a like-for-like crossing. The existing deck is heavily delaminated and in poor to serious condition, so the project requires substituting a 14-by-48-foot prefabricated steel bridge, installing guardrails and terminals, and paving 100 feet of approaches on each side to keep rocks, debris, and sediment out of the deck and stream. The roadway is about 14 feet wide, and the work supports NFSR 220 as a main haul route for an upcoming restoration, with potential timber traffic. Major items include removal of the existing structure, embankment and roadway aggregate, asphalt pavement, structural concrete, guardrail, and the new bridge, plus the corresponding equipment and labor hours.

Seasonal weather constraints limit on-site work, with the project’s scope remaining consistent across notices. The estimated project cost ranges from $700,000 to $2,000,000.

THIS IS NOT A REQUEST FOR BID PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS PROJECT WILL BE ADVERTISED AS A TOTAL SMALL BUSINESS SET-ASIDE. PROJECT NUMBER: NM FS 220(1) PROJECT NAME: Romero Creek Bridge PROJECT DESCRIPTION: This project is located in the Gila National Forest in western-central New Mexico. The terrain is rolling and mountainous with elevations ranging up to 8300 ft. The Romero Creek Bridge deck has large areas (approximately 60%) of delamination that are deep (2 to 10 ). The most recent bridge inspection results indicate the structural evaluation of the bridge to be in poor to serious condition. Proposal would replace this bridge with a similar structure, add bridge rail/guardrail and pave the approaches 100' on each side of the bridge to keep rocks/debris/soil off the deck and to prevent sediment from entering the stream. NFSR 220 will be a main haul route for an upcoming restoration project within the next few years. There is potential for thousands of loads of timber to come out on NFSR 220. SCOPE OF THE WORK: This project consists of replacing an existing bridge structure on Forest Route 220 (MP 7.325) over Romero Creek in Catron County, New Mexico. The existing single-span bridge s overall length is 30.4-ft and width (out-out) measures 16.0-ft. The existing roadway width is 14.0-ft. PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 1 (LPSM) of Removal of Existing Structures and Obstructions 250 CUYD of Embankment Construction 250 TON of Roadway Aggregate 100 TON of Asphalt Pavement 14-ft x 48-ft of Prefabricated Steel Bridge 50 CUYD of Structural Concrete 200 LNFT of Guardrail, including terminals 100 hours of Equipment Hours 120 hours of Labor Hours It is anticipated this project will be advertised in Summer 2025 and be under construction in the Fall of 2025. The project has an estimated completion date of Fall 2026. Due to weather, no onsite work is to occur from early March to early May. ESTIMATED COST RANGE: The anticipated cost range is between $700,000 and $2,000,000.

From Presolicitation posted on Jul 28, 2025

PROJECT NUMBER: NM FS 220(1) PROJECT NAME: Romero Creek Bridge PROJECT DESCRIPTION: This project is located in the Gila National Forest in western-central New Mexico. The terrain is rolling and mountainous with elevations ranging up to 8300 ft. The Romero Creek Bridge deck has large areas (approximately 60%) of delamination that are deep (2 to 10 ). The most recent bridge inspection results indicate the structural evaluation of the bridge to be in poor to serious condition. Proposal would replace this bridge with a similar structure, add bridge rail/guardrail and pave the approaches 100' on each side of the bridge to keep rocks/debris/soil off the deck and to prevent sediment from entering the stream. NFSR 220 will be a main haul route for an upcoming restoration project within the next few years. There is potential for thousands of loads of timber to come out on NFSR 220. SCOPE OF THE WORK: This project consists of replacing an existing bridge structure on Forest Route 220 (MP 7.325) over Romero Creek in Catron County, New Mexico. The existing single-span bridge s overall length is 30.4-ft and width (out-out) measures 16.0-ft. The existing roadway width is 14.0-ft. PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 1 (LPSM) of Removal of Existing Structures and Obstructions 250 CUYD of Embankment Construction 250 TON of Roadway Aggregate 100 TON of Asphalt Pavement 14-ft x 48-ft of Prefabricated Steel Bridge 50 CUYD of Structural Concrete 200 LNFT of Guardrail, including terminals 100 hours of Equipment Hours 120 hours of Labor Hours It is anticipated this project will be advertised in Summer 2025 and be under construction in the Fall of 2025. The project has an estimated completion date of Fall 2026. Due to weather, no onsite work is to occur from early March to early May. ESTIMATED COST RANGE: The anticipated cost range is between $700,000 and $2,000,000.

From Solicitation posted on Aug 15, 2025

PROJECT NUMBER: NM FS 220(1) PROJECT NAME: Romero Creek Bridge PROJECT DESCRIPTION: This project is located in the Gila National Forest in western-central New Mexico. The terrain is rolling and mountainous with elevations ranging up to 8300 ft. The Romero Creek Bridge deck has large areas (approximately 60%) of delamination that are deep (2 to 10 ). The most recent bridge inspection results indicate the structural evaluation of the bridge to be in poor to serious condition. Proposal would replace this bridge with a similar structure, add bridge rail/guardrail and pave the approaches 100' on each side of the bridge to keep rocks/debris/soil off the deck and to prevent sediment from entering the stream. NFSR 220 will be a main haul route for an upcoming restoration project within the next few years. There is potential for thousands of loads of timber to come out on NFSR 220. SCOPE OF THE WORK: This project consists of replacing an existing bridge structure on Forest Route 220 (MP 7.325) over Romero Creek in Catron County, New Mexico. The existing single-span bridge s overall length is 30.4-ft and width (out-out) measures 16.0-ft. The existing roadway width is 14.0-ft. Due to weather, no onsite work is to occur from early March to early May. ESTIMATED COST RANGE: The anticipated cost range is between $700,000 and $2,000,000.

From Solicitation posted on Aug 18, 2025

PROJECT NUMBER: NM FS 220(1) PROJECT NAME: Romero Creek Bridge PROJECT DESCRIPTION: This project is located in the Gila National Forest in western-central New Mexico. The terrain is rolling and mountainous with elevations ranging up to 8300 ft. The Romero Creek Bridge deck has large areas (approximately 60%) of delamination that are deep (2 to 10 ). The most recent bridge inspection results indicate the structural evaluation of the bridge to be in poor to serious condition. Proposal would replace this bridge with a similar structure, add bridge rail/guardrail and pave the approaches 100' on each side of the bridge to keep rocks/debris/soil off the deck and to prevent sediment from entering the stream. NFSR 220 will be a main haul route for an upcoming restoration project within the next few years. There is potential for thousands of loads of timber to come out on NFSR 220. SCOPE OF THE WORK: This project consists of replacing an existing bridge structure on Forest Route 220 (MP 7.325) over Romero Creek in Catron County, New Mexico. The existing single-span bridge s overall length is 30.4-ft and width (out-out) measures 16.0-ft. The existing roadway width is 14.0-ft. Due to weather, no onsite work is to occur from early March to early May. ESTIMATED COST RANGE: The anticipated cost range is between $700,000 and $2,000,000.

From Solicitation posted on Aug 19, 2025

PROJECT NUMBER: NM FS 220(1) PROJECT NAME: Romero Creek Bridge PROJECT DESCRIPTION: This project is located in the Gila National Forest in western-central New Mexico. The terrain is rolling and mountainous with elevations ranging up to 8300 ft. The Romero Creek Bridge deck has large areas (approximately 60%) of delamination that are deep (2 to 10 ). The most recent bridge inspection results indicate the structural evaluation of the bridge to be in poor to serious condition. Proposal would replace this bridge with a similar structure, add bridge rail/guardrail and pave the approaches 100' on each side of the bridge to keep rocks/debris/soil off the deck and to prevent sediment from entering the stream. NFSR 220 will be a main haul route for an upcoming restoration project within the next few years. There is potential for thousands of loads of timber to come out on NFSR 220. SCOPE OF THE WORK: This project consists of replacing an existing bridge structure on Forest Route 220 (MP 7.325) over Romero Creek in Catron County, New Mexico. The existing single-span bridge s overall length is 30.4-ft and width (out-out) measures 16.0-ft. The existing roadway width is 14.0-ft. Due to weather, no onsite work is to occur from early March to early May. ESTIMATED COST RANGE: The anticipated cost range is between $700,000 and $2,000,000.

From Solicitation posted on Sep 08, 2025

PROJECT NUMBER: NM FS 220(1) PROJECT NAME: Romero Creek Bridge PROJECT DESCRIPTION: This project is located in the Gila National Forest in western-central New Mexico. The terrain is rolling and mountainous with elevations ranging up to 8300 ft. The Romero Creek Bridge deck has large areas (approximately 60%) of delamination that are deep (2 to 10 ). The most recent bridge inspection results indicate the structural evaluation of the bridge to be in poor to serious condition. Proposal would replace this bridge with a similar structure, add bridge rail/guardrail and pave the approaches 100' on each side of the bridge to keep rocks/debris/soil off the deck and to prevent sediment from entering the stream. NFSR 220 will be a main haul route for an upcoming restoration project within the next few years. There is potential for thousands of loads of timber to come out on NFSR 220. SCOPE OF THE WORK: This project consists of replacing an existing bridge structure on Forest Route 220 (MP 7.325) over Romero Creek in Catron County, New Mexico. The existing single-span bridge s overall length is 30.4-ft and width (out-out) measures 16.0-ft. The existing roadway width is 14.0-ft. Due to weather, no onsite work is to occur from early March to early May. ESTIMATED COST RANGE: The anticipated cost range is between $700,000 and $2,000,000.

From Solicitation posted on Sep 15, 2025

PROJECT NUMBER: NM FS 220(1) PROJECT NAME: Romero Creek Bridge PROJECT DESCRIPTION: This project is located in the Gila National Forest in western-central New Mexico. The terrain is rolling and mountainous with elevations ranging up to 8300 ft. The Romero Creek Bridge deck has large areas (approximately 60%) of delamination that are deep (2 to 10 ). The most recent bridge inspection results indicate the structural evaluation of the bridge to be in poor to serious condition. Proposal would replace this bridge with a similar structure, add bridge rail/guardrail and pave the approaches 100' on each side of the bridge to keep rocks/debris/soil off the deck and to prevent sediment from entering the stream. NFSR 220 will be a main haul route for an upcoming restoration project within the next few years. There is potential for thousands of loads of timber to come out on NFSR 220. SCOPE OF THE WORK: This project consists of replacing an existing bridge structure on Forest Route 220 (MP 7.325) over Romero Creek in Catron County, New Mexico. The existing single-span bridge s overall length is 30.4-ft and width (out-out) measures 16.0-ft. The existing roadway width is 14.0-ft. Due to weather, no onsite work is to occur from early March to early May. ESTIMATED COST RANGE: The anticipated cost range is between $700,000 and $2,000,000.

From Solicitation posted on Sep 16, 2025

PROJECT NUMBER: NM FS 220(1) PROJECT NAME: Romero Creek Bridge PROJECT DESCRIPTION: This project is located in the Gila National Forest in western-central New Mexico. The terrain is rolling and mountainous with elevations ranging up to 8300 ft. The Romero Creek Bridge deck has large areas (approximately 60%) of delamination that are deep (2 to 10 ). The most recent bridge inspection results indicate the structural evaluation of the bridge to be in poor to serious condition. Proposal would replace this bridge with a similar structure, add bridge rail/guardrail and pave the approaches 100' on each side of the bridge to keep rocks/debris/soil off the deck and to prevent sediment from entering the stream. NFSR 220 will be a main haul route for an upcoming restoration project within the next few years. There is potential for thousands of loads of timber to come out on NFSR 220. SCOPE OF THE WORK: This project consists of replacing an existing bridge structure on Forest Route 220 (MP 7.325) over Romero Creek in Catron County, New Mexico. The existing single-span bridge s overall length is 30.4-ft and width (out-out) measures 16.0-ft. The existing roadway width is 14.0-ft. Due to weather, no onsite work is to occur from early March to early May. ESTIMATED COST RANGE: The anticipated cost range is between $700,000 and $2,000,000.

From Solicitation posted on Oct 31, 2025

Notice history

8
  1. Presolicitation Posted Jul 28, 2025
  2. Solicitation Posted Aug 15, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Aug 12, 2025Sep 16, 2025
  3. Solicitation Posted Aug 18, 2025
    • Description: Description was updated
  4. Solicitation Posted Aug 19, 2025
    No changes from previous notice
  5. Solicitation Posted Sep 08, 2025
    No changes from previous notice
  6. Solicitation Posted Sep 15, 2025
    No changes from previous notice
  7. Solicitation Posted Sep 16, 2025
    No changes from previous notice
  8. Solicitation LATEST Posted Oct 31, 2025
    No changes from previous notice

Details

Solicitation number 6982AF25B000012
Notice ID 6bd0c9c031dd45d485c6eb9c7758d8de
Notice type Presolicitation
Product / Service (PSC) Y1LB
NAICS 237310
Place of performance Luna, New Mexico
Archive date Aug 27, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Laura Vallejos

Email

secondary
Leslie Karsten

Email

Agency

TRANSPORTATION, DEPARTMENT OF
FEDERAL HIGHWAY ADMINISTRATION
6982AF CENTRAL FEDERAL LANDS DIVISI

Place of Performance

Luna, New Mexico 87824
USA

Dates

Posted Jul 28, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Aug 12, 2025 11 months ago