Naples to Big Marco Pass, Maintenance Dredging, Collier County, Florida W912EP25CA008
Summary
AI-generated · Sep 04, 2025Maintenance dredging of the Federal navigation channel from Naples to Big Marco Pass in Collier County, Florida, with the excavated material placed in the Beach Placement Area south of Gordon Pass. The scope also includes incidental tasks such as turbidity monitoring, environmental species monitoring, beach fill quality control, vibration control monitoring, and beach tilling.
The project was awarded to Southwind Construction Corp for approximately $3.05 million.
Project work consists of maintenance dredging in the Federal navigation channel of Naples to Big Marco Pass. The excavated material will be placed in the Beach Placement Area south of Gordon Pass. Incidental work includes but is not limited to turbidity monitoring, environmental species monitoring, beach fill quality control, vibration control monitoring, and beach tilling.
From Award Notice posted on Sep 02, 2025Notice history
1-
Award Notice LATEST Posted Sep 02, 2025
Details
Award Information
Award Notices
Posted: Sep 02, 2025
Project work consists of maintenance dredging in the Federal navigation channel of Naples to Big Marco Pass. The excavated material will be placed in the Beach Placement Area south of Gordon Pass. Incidental work includes but is not limited to turbidity monitoring, environmental species monitoring,...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| SOUTHWIND CONSTRUCTION CORP | KMRHQL3M2NJ7 | 0EXU7 | Evansville, IN |
Contacts
Phone
Agency
Place of Performance
USA