Contacts, documents and full notice history are available with a subscription.
Award Notice 4 notices

Z--0307 Q2 CON END NKRD NAIL CANYON WASH RESTORATION 127EAX25R0007

Solicitation 127EAX25R0007 Copied Notice ID ccb8048fd3844dcb844dc926990eb526 Copied AGRICULTURE, DEPARTMENT OF — USDA-FS, CSA SOUTHWEST 7
SAM.gov
Posted
Sep 23, 2025
Deadline
No deadline
Set-aside
None
NAICS
237310
PSC
Z1LB

Summary

AI-generated · Aug 24, 2025

Install two rolling dips and stabilize and armor five bank locations on NFSR 423 and 642 using geotextile and riprap as part of Nail Canyon Wash Restoration (Snake Gulch). Optional items include road reconditioning and resurfacing on NFSR 22, with materials to be sourced from commercial suppliers.

Context: the work focuses on restoring and stabilizing the Nail Canyon Wash area to protect the road infrastructure, with bank stabilization, armoring, and rolling dips along specified forest roads; no brand-name material requirements are specified beyond using commercial sources. Between notices, the scope remains the same; the first entry is a presolicitation and the second a solicitation, with the latter formalizing the same requirements.

This project includes the installation of two rolling dips and five locations of bank stabilization and armoring using geotextile and riprap on NFSR 423 and 642. Optional items include road reconditioning and resurfacing on NFSR 22. This project will utilize commercial sources of material.

From Presolicitation posted on Aug 04, 2025

Installation of two rolling dips and five locations of bank stabilization and armoring using geotextile and riprap on NFSR 423 and 642. Optional items include road reconditioning and resurfacing on NFSR 22. This project will utilize commercial sources of material.

From Solicitation posted on Aug 18, 2025

Amendment 0001 -- Adds the correct SOI and extends to Proposal Due date till September 10th, 2025 by 1:00 PM CD. Installation of two rolling dips and five locations of bank stabilization and armoring using geotextile and riprap on NFSR 423 and 642. Optional items include road reconditioning and resurfacing on NFSR 22. This project will utilize commercial sources of material.

From Solicitation posted on Sep 02, 2025

This project includes the installation of two rolling dips and five locations of bank stabilization and armoring using geotextile and riprap on NFSR 423 and 642. Optional items include road reconditioning and resurfacing on NFSR 22. This project will utilize commercial sources of material.

From Award Notice posted on Sep 23, 2025

Notice history

4
  1. Presolicitation Posted Aug 04, 2025 View
  2. Solicitation Posted Aug 18, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Aug 18, 2025Sep 05, 2025
  3. Solicitation Posted Sep 02, 2025
    • Description: Description was updated
    • Response Deadline: Sep 05, 2025Sep 10, 2025
  4. Award Notice LATEST Posted Sep 23, 2025

Details

Solicitation number 127EAX25R0007
Notice ID ccb8048fd3844dcb844dc926990eb526
Award number 127EAX25C0011
Notice type Award Notice
Product / Service (PSC) Z1LB
NAICS 237310
Archive date Oct 08, 2025

Award Information

Awardee
1
Total Awarded
$476,478.24
Award Date
Sep 23, 2025

Award Notices

Z--0307 Q2 CON END NKRD NAIL CANYON WASH RESTORATION View Notice

Posted: Sep 23, 2025

This project includes the installation of two rolling dips and five locations of bank stabilization and armoring using geotextile and riprap on NFSR 423 and 642. Optional items include road reconditioning and resurfacing on NFSR 22. This project will utilize commercial sources of material.

Awardees

Company Name UEI CAGE Code Location
CUTTING EDGE CONTRACTORS INC DJ6LV9SLBLL1 7M8V2 LAS VEGAS, NV

Documents

No files available

View on SAM.gov

Contacts

primary
MCCULLOUGH, TROY A

Email

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
USDA-FS, CSA SOUTHWEST 7

Place of Performance

Dates

Posted Sep 23, 2025 10 months ago
Last Updated Aug 06, 2026 1 day ago
Awarded Sep 23, 2025 10 months ago