Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. N6247026R0015
Summary
AI-generated · Dec 31, 2025Design-Bid-Build MILCON project to upgrade the electrical distribution system at the Gosport Substation of Norfolk Naval Shipyard in Portsmouth, Virginia.
Review the attached solicitation in its entirety; the full specifications are not provided here and must be requested by emailing the contract specialist to obtain them.
READ THE ATTACH SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL TO THE CONTRACT SPECIALIST. Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia.
From Solicitation posted on Dec 30, 2025READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL TO THE CONTRACT SPECIALIST. Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia.
From Solicitation posted on Dec 31, 2025READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW: Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia.
From Solicitation posted on Jan 05, 2026READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW: Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. AMENDMENT 0001 1. Revise the Solicitation 2. Add Site Visit Information 3. Add Award Fee Information and Award Fee CLIN 4. Answer PPIs The Following Attachments were added: Attachment N - Award Fee Plan Attachment O - SECNAV 5512 Attachment P - BLANK DBIDS or VISITOR REQUEST Attachment Q - Approved Identity Proofing Documents Attachment R - Criteria for Denying Access to Navy Installations
From Solicitation posted on Jan 13, 2026READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW: Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. AMENDMENT 0001 1. Revise the Solicitation 2. Add Site Visit Information 3. Add Award Fee Information and Award Fee CLIN 4. Answer PPIs The Following Attachments were added: Attachment N - Award Fee Plan Attachment O - SECNAV 5512 Attachment P - BLANK DBIDS or VISITOR REQUEST Attachment Q - Approved Identity Proofing Documents Attachment R - Criteria for Denying Access to Navy Installations
From Solicitation posted on Jan 14, 2026READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW: Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. AMENDMENT 0001 1. Revise the Solicitation 2. Add Site Visit Information 3. Add Award Fee Information and Award Fee CLIN 4. Answer PPIs The Following Attachments were added: Attachment N - Award Fee Plan Attachment O - SECNAV 5512 Attachment P - BLANK DBIDS or VISITOR REQUEST Attachment Q - Approved Identity Proofing Documents Attachment R - Criteria for Denying Access to Navy Installations AMENDMENT 0002 1. Revise the Solicitation 2. Answer PPIs
From Solicitation posted on Jan 28, 2026READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW: Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. AMENDMENT 0001 1. Revise the Solicitation 2. Add Site Visit Information 3. Add Award Fee Information and Award Fee CLIN 4. Answer PPIs The Following Attachments were added: Attachment N - Award Fee Plan Attachment O - SECNAV 5512 Attachment P - BLANK DBIDS or VISITOR REQUEST Attachment Q - Approved Identity Proofing Documents Attachment R - Criteria for Denying Access to Navy Installations AMENDMENT 0002 1. Revise the Solicitation 2. Answer PPIs AMENDMENT 0003 1. Add revised Specification "01 30 00.00 22" attachment 2. Answer PPIs 3. Add Site Visit Sign-in Roster
From Solicitation posted on Feb 09, 2026READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW: Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. AMENDMENT 0001 1. Revise the Solicitation 2. Add Site Visit Information 3. Add Award Fee Information and Award Fee CLIN 4. Answer PPIs The Following Attachments were added: Attachment N - Award Fee Plan Attachment O - SECNAV 5512 Attachment P - BLANK DBIDS or VISITOR REQUEST Attachment Q - Approved Identity Proofing Documents Attachment R - Criteria for Denying Access to Navy Installations AMENDMENT 0002 1. Revise the Solicitation 2. Answer PPIs AMENDMENT 0003 1. Add revised Specification "01 30 00.00 22" attachment 2. Answer PPIs 3. Add Site Visit Sign-in Roster AMENDMENT 0004 1. Revise the solicitation 2. Remove Project Labor Agreement Requirement (PLA) 3. Extend the proposal due date to 18 March 2026
From Solicitation posted on Feb 23, 2026READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW: Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. AMENDMENT 0001 1. Revise the Solicitation 2. Add Site Visit Information 3. Add Award Fee Information and Award Fee CLIN 4. Answer PPIs The Following Attachments were added: Attachment N - Award Fee Plan Attachment O - SECNAV 5512 Attachment P - BLANK DBIDS or VISITOR REQUEST Attachment Q - Approved Identity Proofing Documents Attachment R - Criteria for Denying Access to Navy Installations AMENDMENT 0002 1. Revise the Solicitation 2. Answer PPIs AMENDMENT 0003 1. Add revised Specification "01 30 00.00 22" attachment 2. Answer PPIs 3. Add Site Visit Sign-in Roster AMENDMENT 0004 1. Revise the solicitation 2. Remove Project Labor Agreement Requirement (PLA) 3. Extend the proposal due date to 18 March 2026 THE PPI PERIOD IS NOT EXTENDED WITH THE SOLICITATION DUE DATE.
From Solicitation posted on Feb 25, 2026READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW: Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. AMENDMENT 0001 1. Revise the Solicitation 2. Add Site Visit Information 3. Add Award Fee Information and Award Fee CLIN 4. Answer PPIs The Following Attachments were added: Attachment N - Award Fee Plan Attachment O - SECNAV 5512 Attachment P - BLANK DBIDS or VISITOR REQUEST Attachment Q - Approved Identity Proofing Documents Attachment R - Criteria for Denying Access to Navy Installations AMENDMENT 0002 1. Revise the Solicitation 2. Answer PPIs AMENDMENT 0003 1. Add revised Specification "01 30 00.00 22" attachment 2. Answer PPIs 3. Add Site Visit Sign-in Roster AMENDMENT 0004 1. Revise the solicitation 2. Remove Project Labor Agreement Requirement (PLA) 3. Extend the proposal due date to 18 March 2026 AMENDMENT 0005 1. Extend the proposal due date 2. Revise the solicitation section 00 70 00 - Conditions of the Contract 3. Answer PPIs 4. Revise Clause 52.211-12 Liquidated Damages-Construction. 5. Revise Clause 52.211-10 Commencement, Prosecution, and Completion of Work. 6. Revise Factor 3 - Schedule 7. Revise Attachment G - Price Proposal Form 8. Revise Specifications 9. Revise Drawings THE PPI PERIOD IS NOT EXTENDED WITH THE SOLICITATION DUE DATE.
From Solicitation posted on Mar 05, 2026READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW: Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. AMENDMENT 0001 1. Revise the Solicitation 2. Add Site Visit Information 3. Add Award Fee Information and Award Fee CLIN 4. Answer PPIs The Following Attachments were added: Attachment N - Award Fee Plan Attachment O - SECNAV 5512 Attachment P - BLANK DBIDS or VISITOR REQUEST Attachment Q - Approved Identity Proofing Documents Attachment R - Criteria for Denying Access to Navy Installations AMENDMENT 0002 1. Revise the Solicitation 2. Answer PPIs AMENDMENT 0003 1. Add revised Specification "01 30 00.00 22" attachment 2. Answer PPIs 3. Add Site Visit Sign-in Roster AMENDMENT 0004 1. Revise the solicitation 2. Remove Project Labor Agreement Requirement (PLA) 3. Extend the proposal due date to 18 March 2026 AMENDMENT 0005 1. Extend the proposal due date 2. Revise the solicitation section 00 70 00 - Conditions of the Contract 3. Answer PPIs 4. Revise Clause 52.211-12 Liquidated Damages-Construction. 5. Revise Clause 52.211-10 Commencement, Prosecution, and Completion of Work. 6. Revise Factor 3 - Schedule 7. Revise Attachment G - Price Proposal Form 8. Revise Specifications 9. Revise Drawings THE PPI PERIOD IS NOT EXTENDED WITH THE SOLICITATION DUE DATE.
From Solicitation posted on Mar 09, 2026Notice history
11-
Solicitation Posted Dec 30, 2025
-
Solicitation Posted Jan 14, 2026No changes from previous notice
-
Solicitation Posted Feb 23, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Mar 02, 2026 → Mar 18, 2026
-
Solicitation Posted Mar 05, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Mar 18, 2026 → Apr 02, 2026
-
Solicitation LATEST Posted Mar 09, 2026No changes from previous notice
Details
Award Information
Not yet awarded