Contacts, documents and full notice history are available with a subscription.
Solicitation NONE Expired 11 notices 24 documents

Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. N6247026R0015

Solicitation N6247026R0015 Copied Notice ID cd4df910d08a460d84e284c27b9fce02 Copied DEPT OF DEFENSE — NAVFACSYSCOM ATLANTIC
SAM.gov
Posted
Mar 09, 2026
Deadline
Apr 02, 2026
Set-aside
NONE
NAICS
237130
PSC
Y1NZ

Summary

AI-generated · Dec 31, 2025

Design-Bid-Build MILCON project to upgrade the electrical distribution system at the Gosport Substation of Norfolk Naval Shipyard in Portsmouth, Virginia.

Review the attached solicitation in its entirety; the full specifications are not provided here and must be requested by emailing the contract specialist to obtain them.

READ THE ATTACH SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL TO THE CONTRACT SPECIALIST. Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia.

From Solicitation posted on Dec 30, 2025

READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL TO THE CONTRACT SPECIALIST. Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia.

From Solicitation posted on Dec 31, 2025

READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW: Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia.

From Solicitation posted on Jan 05, 2026

READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW: Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. AMENDMENT 0001 1. Revise the Solicitation 2. Add Site Visit Information 3. Add Award Fee Information and Award Fee CLIN 4. Answer PPIs The Following Attachments were added: Attachment N - Award Fee Plan Attachment O - SECNAV 5512 Attachment P - BLANK DBIDS or VISITOR REQUEST Attachment Q - Approved Identity Proofing Documents Attachment R - Criteria for Denying Access to Navy Installations

From Solicitation posted on Jan 13, 2026

READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW: Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. AMENDMENT 0001 1. Revise the Solicitation 2. Add Site Visit Information 3. Add Award Fee Information and Award Fee CLIN 4. Answer PPIs The Following Attachments were added: Attachment N - Award Fee Plan Attachment O - SECNAV 5512 Attachment P - BLANK DBIDS or VISITOR REQUEST Attachment Q - Approved Identity Proofing Documents Attachment R - Criteria for Denying Access to Navy Installations

From Solicitation posted on Jan 14, 2026

READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW: Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. AMENDMENT 0001 1. Revise the Solicitation 2. Add Site Visit Information 3. Add Award Fee Information and Award Fee CLIN 4. Answer PPIs The Following Attachments were added: Attachment N - Award Fee Plan Attachment O - SECNAV 5512 Attachment P - BLANK DBIDS or VISITOR REQUEST Attachment Q - Approved Identity Proofing Documents Attachment R - Criteria for Denying Access to Navy Installations AMENDMENT 0002 1. Revise the Solicitation 2. Answer PPIs

From Solicitation posted on Jan 28, 2026

READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW: Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. AMENDMENT 0001 1. Revise the Solicitation 2. Add Site Visit Information 3. Add Award Fee Information and Award Fee CLIN 4. Answer PPIs The Following Attachments were added: Attachment N - Award Fee Plan Attachment O - SECNAV 5512 Attachment P - BLANK DBIDS or VISITOR REQUEST Attachment Q - Approved Identity Proofing Documents Attachment R - Criteria for Denying Access to Navy Installations AMENDMENT 0002 1. Revise the Solicitation 2. Answer PPIs AMENDMENT 0003 1. Add revised Specification "01 30 00.00 22" attachment 2. Answer PPIs 3. Add Site Visit Sign-in Roster

From Solicitation posted on Feb 09, 2026

READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW: Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. AMENDMENT 0001 1. Revise the Solicitation 2. Add Site Visit Information 3. Add Award Fee Information and Award Fee CLIN 4. Answer PPIs The Following Attachments were added: Attachment N - Award Fee Plan Attachment O - SECNAV 5512 Attachment P - BLANK DBIDS or VISITOR REQUEST Attachment Q - Approved Identity Proofing Documents Attachment R - Criteria for Denying Access to Navy Installations AMENDMENT 0002 1. Revise the Solicitation 2. Answer PPIs AMENDMENT 0003 1. Add revised Specification "01 30 00.00 22" attachment 2. Answer PPIs 3. Add Site Visit Sign-in Roster AMENDMENT 0004 1. Revise the solicitation 2. Remove Project Labor Agreement Requirement (PLA) 3. Extend the proposal due date to 18 March 2026

From Solicitation posted on Feb 23, 2026

READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW: Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. AMENDMENT 0001 1. Revise the Solicitation 2. Add Site Visit Information 3. Add Award Fee Information and Award Fee CLIN 4. Answer PPIs The Following Attachments were added: Attachment N - Award Fee Plan Attachment O - SECNAV 5512 Attachment P - BLANK DBIDS or VISITOR REQUEST Attachment Q - Approved Identity Proofing Documents Attachment R - Criteria for Denying Access to Navy Installations AMENDMENT 0002 1. Revise the Solicitation 2. Answer PPIs AMENDMENT 0003 1. Add revised Specification "01 30 00.00 22" attachment 2. Answer PPIs 3. Add Site Visit Sign-in Roster AMENDMENT 0004 1. Revise the solicitation 2. Remove Project Labor Agreement Requirement (PLA) 3. Extend the proposal due date to 18 March 2026 THE PPI PERIOD IS NOT EXTENDED WITH THE SOLICITATION DUE DATE.

From Solicitation posted on Feb 25, 2026

READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW: Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. AMENDMENT 0001 1. Revise the Solicitation 2. Add Site Visit Information 3. Add Award Fee Information and Award Fee CLIN 4. Answer PPIs The Following Attachments were added: Attachment N - Award Fee Plan Attachment O - SECNAV 5512 Attachment P - BLANK DBIDS or VISITOR REQUEST Attachment Q - Approved Identity Proofing Documents Attachment R - Criteria for Denying Access to Navy Installations AMENDMENT 0002 1. Revise the Solicitation 2. Answer PPIs AMENDMENT 0003 1. Add revised Specification "01 30 00.00 22" attachment 2. Answer PPIs 3. Add Site Visit Sign-in Roster AMENDMENT 0004 1. Revise the solicitation 2. Remove Project Labor Agreement Requirement (PLA) 3. Extend the proposal due date to 18 March 2026 AMENDMENT 0005 1. Extend the proposal due date 2. Revise the solicitation section 00 70 00 - Conditions of the Contract 3. Answer PPIs 4. Revise Clause 52.211-12 Liquidated Damages-Construction. 5. Revise Clause 52.211-10 Commencement, Prosecution, and Completion of Work. 6. Revise Factor 3 - Schedule 7. Revise Attachment G - Price Proposal Form 8. Revise Specifications 9. Revise Drawings THE PPI PERIOD IS NOT EXTENDED WITH THE SOLICITATION DUE DATE.

From Solicitation posted on Mar 05, 2026

READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW: Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. AMENDMENT 0001 1. Revise the Solicitation 2. Add Site Visit Information 3. Add Award Fee Information and Award Fee CLIN 4. Answer PPIs The Following Attachments were added: Attachment N - Award Fee Plan Attachment O - SECNAV 5512 Attachment P - BLANK DBIDS or VISITOR REQUEST Attachment Q - Approved Identity Proofing Documents Attachment R - Criteria for Denying Access to Navy Installations AMENDMENT 0002 1. Revise the Solicitation 2. Answer PPIs AMENDMENT 0003 1. Add revised Specification "01 30 00.00 22" attachment 2. Answer PPIs 3. Add Site Visit Sign-in Roster AMENDMENT 0004 1. Revise the solicitation 2. Remove Project Labor Agreement Requirement (PLA) 3. Extend the proposal due date to 18 March 2026 AMENDMENT 0005 1. Extend the proposal due date 2. Revise the solicitation section 00 70 00 - Conditions of the Contract 3. Answer PPIs 4. Revise Clause 52.211-12 Liquidated Damages-Construction. 5. Revise Clause 52.211-10 Commencement, Prosecution, and Completion of Work. 6. Revise Factor 3 - Schedule 7. Revise Attachment G - Price Proposal Form 8. Revise Specifications 9. Revise Drawings THE PPI PERIOD IS NOT EXTENDED WITH THE SOLICITATION DUE DATE.

From Solicitation posted on Mar 09, 2026

Notice history

11
  1. Solicitation Posted Dec 30, 2025 View
  2. Solicitation Posted Dec 31, 2025
    • Description: Description was updated
  3. Solicitation Posted Jan 05, 2026
    • Description: Description was updated
  4. Solicitation Posted Jan 13, 2026
    • Description: Description was updated
  5. Solicitation Posted Jan 14, 2026
    No changes from previous notice
  6. Solicitation Posted Jan 28, 2026
    • Description: Description was updated
  7. Solicitation Posted Feb 09, 2026
    • Description: Description was updated
  8. Solicitation Posted Feb 23, 2026
    • Description: Description was updated
    • Response Deadline: Mar 02, 2026Mar 18, 2026
  9. Solicitation Posted Feb 25, 2026
    • Description: Description was updated
  10. Solicitation Posted Mar 05, 2026
    • Description: Description was updated
    • Response Deadline: Mar 18, 2026Apr 02, 2026
  11. Solicitation LATEST Posted Mar 09, 2026
    No changes from previous notice

Details

Solicitation number N6247026R0015
Notice ID cd4df910d08a460d84e284c27b9fce02
Notice type Solicitation
Product / Service (PSC) Y1NZ
NAICS 237130
Set-aside No Set aside used
Place of performance Portsmouth, Virginia
Archive date Apr 17, 2026

Award Information

Not yet awarded

Contacts

primary
Daniel Rocha

Email

secondary
Edward Flint

Email

Agency

DEPT OF DEFENSE
DEPT OF THE NAVY
NAVFAC
NAVFAC ATLANTIC CMD
NAVFACSYSCOM ATLANTIC

Place of Performance

Portsmouth, Virginia
USA

Dates

Posted Mar 09, 2026 4 months ago
Last Updated Aug 06, 2026 1 day ago
Due Apr 02, 2026 4 months ago