Messing and Berthing Barges N5005426F2031
Summary
AI-generated · Jan 21, 2026Maintain the APL-61 barges during the maintenance availability by performing a defined set of tasks, including accountability of manhour and material reservation; rebuild and install bilge pumps; inspect and calibrate gauges; troubleshoot the ventilation system; install freezer box components (evaporator, condenser, and compressor units); inspect and certify the Gaylord Hood System; inspect, test, and certify the firefighting system; install CHT aeration pressure switch cabling; complete the Barge Systems Check Off List; provide towing service; and provide temporary service.
This work is aimed at keeping the barges ready to continuously support United States Navy needs, and it must be accomplished within the maintenance availability period to ensure uninterrupted operation.
The work to be performed pursuant to the maintenance of the APL-61 are as follows; Work Item Number 042-00-001 Accountability of Manhour and Material Reservation; accomplish, 256-11-001 Bilge Pumps; rebuild and install, 437-21-001 Gauge; inspect and calibrate, 512-11-001 Ventilation System; troubleshoot, 516-11-001 Freezer Box Evaporator, Condenser and Compressor units; install, 555-11-001 Gaylord Hood System; inspect and certify; 555-32-001 Firefighting System; inspect, test, and certify, 593-11-001 CHT Aeration Pressure Switch Cabling; install, 982-31-001 Barge Systems Check Off List; accomplish, 992-11-001 Towing Service; provide, 992-11-002 Temporary Service. Work must be accomplished during the maintenance availability so the barge can continually support the needs of the United States Navy.
From Justification posted on Jan 20, 2026Notice history
1-
Justification LATEST Posted Jan 20, 2026
Details
Award Information
Contacts
Phone
Agency
Place of Performance
USA