Contacts, documents and full notice history are available with a subscription.
Presolicitation SBA Expired 1 notice

Mesa Falls Boardwalk/Bench Replacement - A Request for Quote will be sent directly to at least (3) suppliers. Location is at Caribou-Targhee National Forest in Fremont County ID. POP will tentatively begin 06/01/2026 for materials. 1240LT26Q0005

Solicitation 1240LT26Q0005 Copied Notice ID 9f0c83dc6861462f8f6f14a216776dc0 Copied AGRICULTURE, DEPARTMENT OF — USDA-FS, CSA INTERMOUNTAIN 8
SAM.gov
Posted
Jan 12, 2026
Deadline
Mar 01, 2026
Set-aside
SBA
NAICS
236220
PSC
Y1PA

Summary

AI-generated · Jan 13, 2026

Remove and replace the Mesa Falls boardwalk lumber and connecting hardware in the Caribou-Targhee National Forest, Fremont County, Idaho. The work includes removing and disposing of old pressure-treated lumber and installing new lumber components (stringers, deck boards, and related lumber) and the corresponding hardware. Existing metal railings, posts, anchors, and other supports will remain in place to be reused. Redwood bench lumber and hardware will be replaced for 10 benches along the boardwalk and asphalt pathways.

An RFQ will be issued directly to at least three suppliers. The work will be performed onsite with a contract duration of 165 days, and onsite activities are planned to begin shortly after award.

This project includes the removal and replacement of boardwalk lumber as well as connecting hardware for the Mesa Falls boardwalk. The work includes removing and disposing of old pressure-treated lumber. Replacing all lumber with comparable stringers, deck boards, and other lumber as well as connecting hardware. Existing metal railings, posts, anchors, and other supports will remain in-place to be re-used. Redwood Bench lumber and connecting hardware will also be replaced for the 10 benches along the boardwalk and asphalt pathways.This project includes the removal and replacement of boardwalk lumber as well as connecting hardware for the Mesa Falls boardwalk. This project includes the removal and replacement of boardwalk lumber as well as connecting hardware for the Mesa Falls boardwalk. Onsite work tentatively begins 6/1/2026. Contract time is 165 days.

From Presolicitation posted on Jan 12, 2026

Notice history

1
  1. Presolicitation LATEST Posted Jan 12, 2026

Details

Solicitation number 1240LT26Q0005
Notice ID 9f0c83dc6861462f8f6f14a216776dc0
Notice type Presolicitation
Product / Service (PSC) Y1PA
NAICS 236220
Place of performance Idaho
Archive date Mar 16, 2026

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Terri Tucker

Email

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
USDA-FS, CSA INTERMOUNTAIN 8

Place of Performance

Idaho
USA

Dates

Posted Jan 12, 2026 6 months ago
Last Updated Aug 06, 2026 1 day ago
Due Mar 01, 2026 5 months ago