Mesa Falls Boardwalk/Bench Replacement - A Request for Quote will be sent directly to at least (3) suppliers. Location is at Caribou-Targhee National Forest in Fremont County ID. POP will tentatively begin 06/01/2026 for materials. 1240LT26Q0005
Summary
AI-generated · Jan 13, 2026Remove and replace the Mesa Falls boardwalk lumber and connecting hardware in the Caribou-Targhee National Forest, Fremont County, Idaho. The work includes removing and disposing of old pressure-treated lumber and installing new lumber components (stringers, deck boards, and related lumber) and the corresponding hardware. Existing metal railings, posts, anchors, and other supports will remain in place to be reused. Redwood bench lumber and hardware will be replaced for 10 benches along the boardwalk and asphalt pathways.
An RFQ will be issued directly to at least three suppliers. The work will be performed onsite with a contract duration of 165 days, and onsite activities are planned to begin shortly after award.
This project includes the removal and replacement of boardwalk lumber as well as connecting hardware for the Mesa Falls boardwalk. The work includes removing and disposing of old pressure-treated lumber. Replacing all lumber with comparable stringers, deck boards, and other lumber as well as connecting hardware. Existing metal railings, posts, anchors, and other supports will remain in-place to be re-used. Redwood Bench lumber and connecting hardware will also be replaced for the 10 benches along the boardwalk and asphalt pathways.This project includes the removal and replacement of boardwalk lumber as well as connecting hardware for the Mesa Falls boardwalk. This project includes the removal and replacement of boardwalk lumber as well as connecting hardware for the Mesa Falls boardwalk. Onsite work tentatively begins 6/1/2026. Contract time is 165 days.
From Presolicitation posted on Jan 12, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA