LBNF/DUNE-US Cryostat Temporary Ventilation RFP-LBNF-372089-BF
Summary
AI-generated · Dec 13, 2025Provide an air handling unit built from shipping splits to serve as temporary ventilation for the cryostat during installation of membrane, insulation, and detector components for the LBNF/DUNE-US project. The unit will supply conditioned air to the cryostat and circulate air through large roof feedthroughs, connect to the cryostat via non-conductive duct material to custom duct adapters provided by FFDG, and be wired in conduit to a power panel provided by FFDG.
In support of the Long Baseline Neutrino Facility (LBNF) Deep Underground Neutrino Experiment (DUNE), Fermi Forward Discovery Group (FFDG) Far Detector Cryostat (FDC) Team requires an air handling unit that is constructed of shipping splits. The temporary cryostat ventilation is required during the installation of cryostat membrane, insulation, and detector components. The system will feed conditioned air to the cryostat and circulate air using large feedthroughs in the roof of the cryostat. The air handling equipment will connect to the cryostat via non-conductive duct material to custom duct adapters as provided by FFDG. The air handling equipment shall be electrically connected in conduit to the designated power panel which are provided by the FFDG.
From Solicitation posted on Dec 12, 2025In support of the Long Baseline Neutrino Facility (LBNF) Deep Underground Neutrino Experiment (DUNE), Fermi Forward Discovery Group (FFDG) Far Detector Cryostat (FDC) Team requires an air handling unit that is constructed of shipping splits. The temporary cryostat ventilation is required during the installation of cryostat membrane, insulation, and detector components. The system will feed conditioned air to the cryostat and circulate air using large feedthroughs in the roof of the cryostat. The air handling equipment will connect to the cryostat via non-conductive duct material to custom duct adapters as provided by FFDG. The air handling equipment shall be electrically connected in conduit to the designated power panel which are provided by the FFDG.
From Solicitation posted on Dec 16, 2025In support of the Long Baseline Neutrino Facility (LBNF) Deep Underground Neutrino Experiment (DUNE), Fermi Forward Discovery Group (FFDG) Far Detector Cryostat (FDC) Team requires an air handling unit that is constructed of shipping splits. The temporary cryostat ventilation is required during the installation of cryostat membrane, insulation, and detector components. The system will feed conditioned air to the cryostat and circulate air using large feedthroughs in the roof of the cryostat. The air handling equipment will connect to the cryostat via non-conductive duct material to custom duct adapters as provided by FFDG. The air handling equipment shall be electrically connected in conduit to the designated power panel which are provided by the FFDG.
From Solicitation posted on Jan 21, 2026In support of the Long Baseline Neutrino Facility (LBNF) Deep Underground Neutrino Experiment (DUNE), Fermi Forward Discovery Group (FFDG) Far Detector Cryostat (FDC) Team requires an air handling unit that is constructed of shipping splits. The temporary cryostat ventilation is required during the installation of cryostat membrane, insulation, and detector components. The system will feed conditioned air to the cryostat and circulate air using large feedthroughs in the roof of the cryostat. The air handling equipment will connect to the cryostat via non-conductive duct material to custom duct adapters as provided by FFDG. The air handling equipment shall be electrically connected in conduit to the designated power panel which are provided by the FFDG.
From Solicitation posted on Jan 28, 2026Notice history
4-
Solicitation Posted Dec 12, 2025
-
Solicitation Posted Dec 16, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA