Contacts, documents and full notice history are available with a subscription.
Solicitation NONE Expired 4 notices 8 documents

LBNF/DUNE-US Cryostat Temporary Ventilation RFP-LBNF-372089-BF

Solicitation RFP-LBNF-372089-BF Copied Notice ID 72af49731d54487ca45f824bb005bd4e Copied ENERGY, DEPARTMENT OF — FERMILAB - DOE CONTRACTOR
SAM.gov
Posted
Jan 28, 2026
Deadline
Feb 09, 2026
Set-aside
NONE
NAICS
238220
PSC
4130

Summary

AI-generated · Dec 13, 2025

Provide an air handling unit built from shipping splits to serve as temporary ventilation for the cryostat during installation of membrane, insulation, and detector components for the LBNF/DUNE-US project. The unit will supply conditioned air to the cryostat and circulate air through large roof feedthroughs, connect to the cryostat via non-conductive duct material to custom duct adapters provided by FFDG, and be wired in conduit to a power panel provided by FFDG.

In support of the Long Baseline Neutrino Facility (LBNF) Deep Underground Neutrino Experiment (DUNE), Fermi Forward Discovery Group (FFDG) Far Detector Cryostat (FDC) Team requires an air handling unit that is constructed of shipping splits. The temporary cryostat ventilation is required during the installation of cryostat membrane, insulation, and detector components. The system will feed conditioned air to the cryostat and circulate air using large feedthroughs in the roof of the cryostat. The air handling equipment will connect to the cryostat via non-conductive duct material to custom duct adapters as provided by FFDG. The air handling equipment shall be electrically connected in conduit to the designated power panel which are provided by the FFDG.

From Solicitation posted on Dec 12, 2025

In support of the Long Baseline Neutrino Facility (LBNF) Deep Underground Neutrino Experiment (DUNE), Fermi Forward Discovery Group (FFDG) Far Detector Cryostat (FDC) Team requires an air handling unit that is constructed of shipping splits. The temporary cryostat ventilation is required during the installation of cryostat membrane, insulation, and detector components. The system will feed conditioned air to the cryostat and circulate air using large feedthroughs in the roof of the cryostat. The air handling equipment will connect to the cryostat via non-conductive duct material to custom duct adapters as provided by FFDG. The air handling equipment shall be electrically connected in conduit to the designated power panel which are provided by the FFDG.

From Solicitation posted on Dec 16, 2025

In support of the Long Baseline Neutrino Facility (LBNF) Deep Underground Neutrino Experiment (DUNE), Fermi Forward Discovery Group (FFDG) Far Detector Cryostat (FDC) Team requires an air handling unit that is constructed of shipping splits. The temporary cryostat ventilation is required during the installation of cryostat membrane, insulation, and detector components. The system will feed conditioned air to the cryostat and circulate air using large feedthroughs in the roof of the cryostat. The air handling equipment will connect to the cryostat via non-conductive duct material to custom duct adapters as provided by FFDG. The air handling equipment shall be electrically connected in conduit to the designated power panel which are provided by the FFDG.

From Solicitation posted on Jan 21, 2026

In support of the Long Baseline Neutrino Facility (LBNF) Deep Underground Neutrino Experiment (DUNE), Fermi Forward Discovery Group (FFDG) Far Detector Cryostat (FDC) Team requires an air handling unit that is constructed of shipping splits. The temporary cryostat ventilation is required during the installation of cryostat membrane, insulation, and detector components. The system will feed conditioned air to the cryostat and circulate air using large feedthroughs in the roof of the cryostat. The air handling equipment will connect to the cryostat via non-conductive duct material to custom duct adapters as provided by FFDG. The air handling equipment shall be electrically connected in conduit to the designated power panel which are provided by the FFDG.

From Solicitation posted on Jan 28, 2026

Notice history

4
  1. Solicitation Posted Dec 12, 2025 View
  2. Solicitation Posted Dec 16, 2025
    No changes from previous notice
  3. Solicitation Posted Jan 21, 2026
    • Response Deadline: Feb 06, 2026Feb 09, 2026
  4. Solicitation LATEST Posted Jan 28, 2026
    • Description: Description was updated

Details

Solicitation number RFP-LBNF-372089-BF
Notice ID 72af49731d54487ca45f824bb005bd4e
Notice type Solicitation
Product / Service (PSC) 4130
NAICS 238220
Set-aside No Set aside used
Place of performance South Dakota
Archive date Feb 24, 2026

Award Information

Not yet awarded

Contacts

primary
Bridget Fugett

Email

Phone

secondary
Jeremy Duncan

Email

Phone

Agency

ENERGY, DEPARTMENT OF
ENERGY, DEPARTMENT OF
FERMILAB - DOE CONTRACTOR

Place of Performance

South Dakota 57754
USA

Dates

Posted Jan 28, 2026 6 months ago
Last Updated Aug 05, 2026 2 days ago
Due Feb 09, 2026 5 months ago