Contacts, documents and full notice history are available with a subscription.
Sources Sought SBA Expired 2 notices

JBLE Tank Repairs W9128F26RA086

Solicitation W9128F26RA086 Copied Notice ID 7f1007b1b9a741cfbc6dd3a0936c9969 Copied DEPT OF DEFENSE — W071 ENDIST OMAHA
SAM.gov
Posted
Feb 10, 2026
Deadline
Mar 03, 2026
Set-aside
SBA
NAICS
237120
PSC
Y1GC

Summary

AI-generated · Feb 11, 2026

Repairs and maintenance of a single vertical aboveground storage tank (Tank 5) at Facility 2186, Joint Base Langley-Eustis. Tank 2186 Repair (R) covers a broad scope: replace the tank roof; repair issue, receipt, and low-suction piping; remove mechanical tape gauge; remove and replace spiral stairs; repair the stilling well; re-install the tank’s ATG system; repair shell manholes; replace tank chime sealant; repair the containment area and tank grounding; repair weld spacing; and provide the tank data plate. Tank 2186 Maintenance (M) covers coating replacement on tank and piping, provide tank strapping charts, and perform the final API 653 inspection.

This is a sources-sought notice to identify capable contractors with experience in aboveground storage tank repairs and API 653 inspections for a military facility, outlining both repair and maintenance tasks and the need to complete the specified inspections and documentation. No further details are provided here beyond the described scope.

This project involves repairs and maintenance of one vertical aboveground storage tank ? Facility 2186 (Tank 5) at Joint Base Langley-Eustis. All Work Complete for Tank 2186 Repair (R) including replace tank roof, repair issue piping, repair receipt piping, repair low suction piping, remove mechanical tape gauge, remove and replace spiral stairs, repair stilling well, re-install tank ATG system, repair shell manholes, replace tank chime sealant, repair containment area, repair tank grounding, repair weld spacing, and provide tank data plate. All Work Complete for Tank 2186 Maintenance (M) including replace tank and piping coatings, provide tank strapping charts, and perform final API 653 inspection.

From Sources Sought posted on Feb 10, 2026

2. The purpose of this amendment is to extend the closing date to 11 March 2026.1. This project involves repairs and maintenance of one vertical aboveground storage tank ? Facility 2186 (Tank 5) at Joint Base Langley-Eustis. All Work Complete for Tank 2186 Repair (R) including replace tank roof, repair issue piping, repair receipt piping, repair low suction piping, remove mechanical tape gauge, remove and replace spiral stairs, repair stilling well, re-install tank ATG system, repair shell manholes, replace tank chime sealant, repair containment area, repair tank grounding, repair weld spacing, and provide tank data plate. All Work Complete for Tank 2186 Maintenance (M) including replace tank and piping coatings, provide tank strapping charts, and perform final API 653 inspection.

From Sources Sought posted on Mar 06, 2026

Notice history

2
  1. Sources Sought Posted Feb 10, 2026
  2. Sources Sought LATEST Posted Mar 06, 2026
    • Description: Description was updated
    • Response Deadline: Mar 03, 2026Mar 11, 2026

Details

Solicitation number W9128F26RA086
Notice ID 7f1007b1b9a741cfbc6dd3a0936c9969
Notice type Sources Sought
Product / Service (PSC) Y1GC
NAICS 237120
Archive date May 14, 2026

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Samuel Obrist

Email

Phone

secondary
Monica McKensey

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION NORTHWESTERN
ENDIST OMAHA
W071 ENDIST OMAHA

Place of Performance

Joint Base Langley-Eustis, VA
23665

Dates

Posted Feb 10, 2026 5 months ago
Last Updated Aug 06, 2026 1 day ago
Due Mar 03, 2026 5 months ago