H--WASH RACK MAINTENANCE Base Year and 4 Option Years 140R3026Q0006
Summary
AI-generated · Nov 22, 2025Maintenance of the wash rack’s electric pressure washer and water recycle system at Hoover Dam must be performed to factory specifications on a scheduled basis. Tasks include thorough testing and inspection of the recycle system and peripheral equipment, routine maintenance, testing and adjusting pumps, checking for air bubbles, calibrating the pH sensor, inspecting and adjusting skimming and sludge removal systems and timers, inspecting filter media, cleaning the collection pit and removing heavier solids and floatable oils, and testing all electrically energized components (switches, breakers, valves, pumps, wiring, motors, float switches, etc.).
This is a sources-sought to inform acquisition planning and determine an appropriate procurement strategy, including whether a set-aside is warranted. Interested firms should submit capability statements demonstrating experience performing similar work; statements will be reviewed to assess capability and potential bidding approaches. A formal solicitation, if pursued, will be issued later and posted publicly.
This is a Sources Sought announcement for acquisition planning purposes and no formal solicitation for this requirement exists at this time. All businesses, regardless of size; capable of providing these items are invited to respond to this announcement and submit a capability statement for consideration. Capability statements received will be reviewed to determine a firm's previous experience performing similar work. The capability statements will be reviewed and used to determine an appropriate procurement strategy, in particular whether a set-aside is warranted or an alternate procurement strategy. The Government does not intend to award a contract based on this notice or otherwise pay for information solicited. Proposed Project: The Bureau of Reclamation, Hoover Dam, Property and Vehicle Maintenance Group of the Hoover Dam, Boulder City, NV requires the current wash rack electric pressure washer and water recycle system to be maintained to factory specifications on a scheduled basis. The tasks the contractor is to complete are as follows: 1.1.1 Thoroughly test and inspect complete Recycle System including peripheral equipment 1.1.1.1 Inspect any specific faults noted by Warehouse Personnel 1.1.2 Perform any routine maintenance 1.1.3 Test and inspect Reagent pumps 1.1.3.1 Check for air bubbles in lines 1.1.3.2 Adjust pumps settings as needed 1.1.4 Test and inspect skimming system 1.1.4.1 Inspect tank and scum level 1.1.4.2 Inspect skimming pipes 1.1.4.3 Adjust skim timer as needed 1.1.5 Test and inspect sludge removal system 1.1.5.1 Inspect sludge levels in coagulant and separator tanks 1.1.5.2 Inspect sludge socks for efficiency 1.1.5.3 Adjust sludge timer as needed 1.1.6 Check and calibrate pH sensor 1.1.6.1 Clean sensor bulb before calibration occurs 1.1.6.2 If necessary, mix buffer solution to maintain proper pH levels 1.1.7 Inspect and clean collection pit 1.1.7.1 When cleaning out the collection pit, remove all heavier solids and floatable oils and greases from wastewater. 1.1.8 Test and inspect all electrically energized components to include but not limited to: 1.1.8.1 Power switches 1.1.8.2 Breakers 1.1.8.3 Automatic flow control valves 1.1.8.4 Pumps 1.1.8.5 Wiring 1.1.8.6 Motors 1.1.8.7 Float switches 1.1.8.8 Etc.. 1.1.9 Inspect all filter media 1.1.9.1 Cleaning filters and media if possible 1.1.9.2 Advise on replacement when necessary Delivered to the Hoover Dam Central Warehouse State Route 172, Boulder City, NV 89005. The applicable North American Industry Classification System (NAICS) Code 332911, Pressure Control Valves Manufacturing with a size standard of 750 Employees. Interested firms must submit the following information: 1. Name and address of Firm 2. Phone number 3. Email Address 4. Unique Entity ID Number (Formerly the DUNS Number) 5. Statement as whether the firm manufacturers the end product or not. 6. Identify if the product is American made or not. 7. Size status/SBA certifications (Small business, Women Owned Small Business, HUBZone, Service-Disabled Veteran Owned Small Business, Indian Small Business Economic Enterprise, other) 8. Capability Statement (not to exceed 5 pages). A brief summary of capabilities to include demonstration of the company's capability to perform the work. Previous procurements performed of similar size and complexity to include references with point of contact information. Customary lead times for these types of items. Any known or foreseeable issues with manufacturing these types of items. 9. Estimated delivery date. All responses must be submitted via email no later than 1600 Pacific Time on 1/5/2026. Email address: nmaye@usbr.gov. Include the reference number (AGBOR300170) in the subject line. When it is determined that a formal solicitation will be issued, the pre-solicitation notice will be posted on Contract Opportunities at sam.gov web site at http://sam.gov/.
From Sources Sought posted on Nov 21, 2025WASH RACK MAINTENANCE
From Solicitation posted on May 19, 2026WASH RACK MAINTENANCE
From Solicitation posted on May 28, 2026EO 14398 WASH RACK MAINTENANCE
From Award Notice posted on Jul 08, 2026Notice history
4-
-
Solicitation Posted May 19, 2026View changes (4)
- Description: Description was updated
- Notice Type: Sources Sought → Solicitation
- Response Deadline: Dec 05, 2025 → Jun 03, 2026
- Set-Aside: None → Total Small Business Set-Aside (FAR 19.5)
-
Solicitation Posted May 28, 2026No changes from previous notice
-
Award Notice LATEST Posted Jul 08, 2026
Details
Award Information
Award Notices
Posted: Jul 08, 2026
EO 14398 WASH RACK MAINTENANCE
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| ROYCE INDUSTRIES LC | SZKVBJD4F6K9 | 1D1K5 | West Jordan, UT |
Contacts
Phone